LOCATION / PLACEMENT

Site Selection: This furnace may be located in an attic, closet, basement, crawl space, alcove or suspended from the ceiling of a utility room or basement. Select a location that will meet all requirements for safety, clearances, ventilation and combustion air, ductwork design, gas piping, electrical wiring and venting.

Clearances: The following minimum clearances, or greater, must be provided between the furnace and adjacent construction.

TABLE 1

 

 

 

MINIMUM INSTALLATION CLEARANCES

"UPFLOW" POSITION

"DOWNFLOW" POSITION

"HORIZONTAL" POSITION

 

 

 

 

 

 

 

Suitable for alcove or closet

Suitable for alcove or closet installation† on non-

Suitable for attic, alcove or closet installation† on

installation† on combustible

combustible flooring at minimum clearance from

combustible flooring at minimum clearance from

flooring at minimum

adjacent construction not less than the following:

adjacent construction not less than the following:

clearance from adjacent

* Installation on combustible flooring only when

* Line contact only permissible between lines

construction not less than

installed on special base (see model & rating label

formed by intersection of the top and two sides of

the following:

 

 

for proper special base).

the furnace jacket and building joist, studs, or

 

 

 

 

 

 

 

 

framing.

 

 

 

 

 

 

 

 

 

Top

 

Sides

 

Back

 

Front

 

Vent

 

 

 

 

 

 

 

 

 

2"

 

1"

 

1"

 

6"

 

6" with single wall vent

 

 

 

 

 

 

 

 

 

2"

 

1"

 

1"

 

3"

 

1" with B1 vent

 

 

 

 

 

 

 

 

 

For closet installation see Air for Combustion and Ventilation.

Failure to comply with all of the clearances will create a fire hazard.

INSTALLATION POSITIONS

flooring, on wood flooring in the upflow or horizontal positions, however, it must not be installed directly on carpeting, tile or any other combustible material. In the downflow position, it must be installed on non- combustible flooring, on the special base listed on the rating label OR on a cased coil.

In a horizontal position, line contact with combustibles is only permissible between lines formed by the intersection of the furnace top, the front and back sides, and building joists, studs or framing (See Figure 1).

Figure 1

HORIZONTAL LINE CONTACT

The furnace should also be located as near to the center of the air distribution system as possible, and should be installed level.

This furnace may be installed on non-combustible

Furnace must not lean back. It must be level or tilt up to 2° to the front. (See Figure 1.)

A clearance of at least 30" should be provided at the front of the unit for servicing. For attic installations, the passageway and servicing area adjacent to the furnace should be floored.

20571201

Issue 0527

Page 7 of 28

Image 7
Contents What to do if YOU Smell GAS Table of ContentsSafety Furnace Specifications Adjusting Airflow Blower Motor Specifications and Airflow Adjusting DataFurnace Wiring Specifications Introduction Installation Positions Location / PlacementHorizontal Line Contact Contaminated Combustion Air AIR for Combustion and VentilationAdequate Ventilation and Combustion Air Confined Space / Outdoor AIR Confined Space / Indoor AIRConfined Space / Outdoor AIR From Attic & Crawl Space From AtticConfined Space / Outdoor AIR Through Horizontal DuctsBottom Panel Removal Special Base InstallationDucting Ductwork RecommendationExternal Filter Rack Size Pre-Installation Vent System InspectionVenting FiltersAuxiliary Draft Inducers Masonry ChimneyType B Vent Horizontal VentingFor Horizontal Positions Vent Exit OptionsTo Convert to Side Flue Exit Vent Pipe Guard KITSingle Stage Thermostat Operation Electrical ConnectionsCarbon Monoxide Poisoning Hazard ThermostatFire or Explosion Hazard GAS Control Piping Typical GAS Service ConnectionGAS Connections Automatic Heat Staging JumperControl Board & Variable Speed Motor Features Unit Sequence of Operation Cooling ModeHeres How Your Heating System Works Main Burners GAS Control DiagramStartup and Operational Checkout Typical Flame AppearanceGas Rate Cubic Feet per Hour Determining Furnace Input Natural Gas OnlyNatural Blower Adjustment CheckoutBurner Orifice Sizing Burner Orifice SelectionLimit Control Checkout Flame Rollout SwitchFlame Rollout Switch Pressure Switch CheckSequence of Operation Combustion Component Check Manifold or Burner/Manifold Removal/ReplacementServicing the Furnace Electrical SHOCK, Fire or Explosion HazardBlower Removal and Replacement Blower Removal/ReplacementLubricating Motors CFM LED Wiring Diagram Issue