Superior DT-400CEP Installing Logs And Glowing Embers, Installing The Glass Door, Sit Millivolt

Page 22
Image 22
Contents MODELS INSTALLATION INSTRUCTIONSDIRECT VENT DT-400& DR-400 Millivolt ElectronicINTRODUCTION TYPICAL INSTALLATIONPACKAGING GENERAL INFORMATIONElectronic Models ÀCOTE DE LAPPAREILMillivolt Models All ModelsAPPLIANCE AND VENT CLEARANCES Typical LocationsLOCATION Shelf Height inches mmVENT TERMINATION CLEARANCES TYPICAL INSTALLATION SEQUENCEDETAILED INSTALLATION STEPS Vertical Vent Termination Clearances12 inches 30cm Canadian InstallationUS Installation 12 inches 30cm12¹⁄₈material drywall thickness is 1/2 in framing depth dimension when the finishAND ROUND HORIZONTAL TERMINATION SV4.5HTR 13mmway. Install vent according to local codes FIREPLACE SPECIFICATIONSStep 3. INSTALL THE VENT SYSTEM listed for operation and installation withVERTICAL TERMINATION SYSTEMS ROOF Vertical Straight InstallationSelect Venting System - Horizontal or Vertical C. Attach vent components to each other Vertical Offset InstallationVent / Appliance Collar Connection Connection0/12 Framing Dimensions for RoofPitch 6/12H Maximum TABLE AVERTICAL VENT FIGURES/TABLES Figure 23 - Top Vent - STRAIGHTFigure 26 - Rear Vent - THREE ELBOWS TABLE DVERTICAL VENT FIGURES/TABLES Figure 27 - Top Vent - THREE ELBOWSHORIZONTAL OUTSIDE WALL TERMINATION SYSTEM F.Install firestop/spacer at ceilingTYPICAL HORIZONTAL VENT INSTALLATION A. Plan the vent runSquare SV4.5HTS Connecting/Recessing Long Square Horizontalattach termination adapter Short Square SV4.5HTSSVenting Components 3.Install the round termination SV4.5HTRHORIZONTAL VENT FIGURES/TABLES LONG SQUARE TERMINATIONH Maximum TABLE FV Minimum V MinimumH + H1 Maximum termination HORIZONTAL VENT FIGURES/TABLE CONTINUEDTABLE J Figure 39- Top Vent - TWO 90 DEGREE ELBOWSB. Install the Outer Flex Pipe A. Install the Inner Flex PipeC. Route Flex Vent A. SIT and Honeywell Millivolt Wiring Step 4. FIELD WIRINGB. Electronic Wiring See Figure FBK-250Blower Kit See Figure Step 6. CONNECTING GAS LINEOptional Gas Flex Line Connector Opening Control Compartment DoorAdjustment Step 7. INSTALLING LOGS AND GLOWING EMBERSStep 9. INSTALLING THE GLASS DOOR Sit and Honeywell Millivolt Gas ValveBurner Adjustment Step 10. BURNER ADJUSTMENTSStep 11. HOOD INSTALLATION FINISHING REQUIREMENTS Wall DetailsInches mm INSTALLATION ACCESSORIESMANTEL CLEARANCES COLD CLIMATE INSULATIONDescription INSTALLATION ACCESSORIES ContinuedModel No. Description In Canada AND .2 INSTALLATION CODEGAS CONVERSION KITS Natural To Propane Gas Conversion Kit SIT SystemsPilot for Honeywell Millivolt Gas Valve Adjusting KnobPilot for SIT Millivolt Gas Valve Pilot Orifice Step 5. Millivolt Appliances Honeywell SystemsAll Models Spring Adjusting ScrewPilot PilotAssembly Orifice Ignitor Assembly Model No