Superior DR-400CMN, DR-400CMP Àcote De Lappareil, Millivolt Models, Electronic Models, All Models

Page 3
Image 3
Contents Millivolt Electronic INSTALLATION INSTRUCTIONSDIRECT VENT DT-400& DR-400 MODELSGENERAL INFORMATION TYPICAL INSTALLATIONPACKAGING INTRODUCTIONAll Models ÀCOTE DE LAPPAREILMillivolt Models Electronic ModelsShelf Height inches mm Typical LocationsLOCATION APPLIANCE AND VENT CLEARANCESVertical Vent Termination Clearances TYPICAL INSTALLATION SEQUENCEDETAILED INSTALLATION STEPS VENT TERMINATION CLEARANCES12 inches 30cm Canadian InstallationUS Installation 12 inches 30cm13mm framing depth dimension when the finishAND ROUND HORIZONTAL TERMINATION SV4.5HTR 12¹⁄₈material drywall thickness is 1/2 inlisted for operation and installation with FIREPLACE SPECIFICATIONSStep 3. INSTALL THE VENT SYSTEM way. Install vent according to local codesVertical Straight Installation VERTICAL TERMINATION SYSTEMS ROOFSelect Venting System - Horizontal or Vertical Connection Vertical Offset InstallationVent / Appliance Collar Connection C. Attach vent components to each other6/12 Framing Dimensions for RoofPitch 0/12Figure 23 - Top Vent - STRAIGHT TABLE AVERTICAL VENT FIGURES/TABLES H MaximumFigure 27 - Top Vent - THREE ELBOWS TABLE DVERTICAL VENT FIGURES/TABLES Figure 26 - Rear Vent - THREE ELBOWSA. Plan the vent run F.Install firestop/spacer at ceilingTYPICAL HORIZONTAL VENT INSTALLATION HORIZONTAL OUTSIDE WALL TERMINATION SYSTEMShort Square SV4.5HTSS Connecting/Recessing Long Square Horizontalattach termination adapter Square SV4.5HTSLONG SQUARE TERMINATION 3.Install the round termination SV4.5HTRHORIZONTAL VENT FIGURES/TABLES Venting ComponentsV Minimum TABLE FV Minimum H MaximumFigure 39- Top Vent - TWO 90 DEGREE ELBOWS HORIZONTAL VENT FIGURES/TABLE CONTINUEDTABLE J H + H1 Maximum terminationA. Install the Inner Flex Pipe B. Install the Outer Flex PipeC. Route Flex Vent Step 4. FIELD WIRING A. SIT and Honeywell Millivolt WiringB. Electronic Wiring See Figure Opening Control Compartment Door Step 6. CONNECTING GAS LINEOptional Gas Flex Line Connector FBK-250Blower Kit See FigureSit and Honeywell Millivolt Gas Valve Step 7. INSTALLING LOGS AND GLOWING EMBERSStep 9. INSTALLING THE GLASS DOOR AdjustmentFINISHING REQUIREMENTS Wall Details Step 10. BURNER ADJUSTMENTSStep 11. HOOD INSTALLATION Burner AdjustmentCOLD CLIMATE INSULATION INSTALLATION ACCESSORIESMANTEL CLEARANCES Inches mmINSTALLATION ACCESSORIES Continued DescriptionModel No. Description Natural To Propane Gas Conversion Kit SIT Systems AND .2 INSTALLATION CODEGAS CONVERSION KITS In CanadaStep 5. Millivolt Appliances Honeywell Systems Adjusting KnobPilot for SIT Millivolt Gas Valve Pilot Orifice Pilot for Honeywell Millivolt Gas ValveModel No Spring Adjusting ScrewPilot PilotAssembly Orifice Ignitor Assembly All Models