Superior DR-400CMN Pilot for SIT Millivolt Gas Valve Pilot Orifice, Honeywell Millivolt Gas Valve

Page 27
Pilot for SIT Millivolt Gas Valve

Pilot for SIT Millivolt Gas Valve

Pilot

Orifice

Figure 60

b. Attach manometer to the manifold side pressure test fitting and verify manifold pres- sure reads 3.5 inches water column (0.87 kPa) for natural gas, and 10.0 inches water column (2.49 kPa) for propane gas.

c. Refer to Figure 60 and remove the pilot hood assembly to access the hexed pilot ori- fice. Remove and replace the orifice with the one provided with the kit.

Pilot for Honeywell Millivolt Gas Valve

(Loosening of Hex Fitting For Orifice Strip Tab Positioning)

Hood

Hood Alignment

7/16 in. Open End Wrench

 

Orifice Strip Tab

 

Take Care Not to Contact the Orifice Strip Tab

Figure 62

with the Hex Fitting Wrench - Distortion of the Tab

May Render the Pilot Inoperative.

 

 

 

 

 

Pilot for Honeywell Millivolt Gas Valve

 

Orifice Strip Tab Position Identification

 

For LP/Propane and Natural Gas

Step 5. Millivolt Appliances -

Honeywell Systems

a. Convert the gas valve as follows (see Figure 61): Remove the plastic protecting cap. Remove the gas type setting screw by turning it counter- clockwise. Obtain the replacement gas type

LP/Propane Gas Position -

1/16 in. Hole, LP and

Red Color shown on tab

L

P

Natural Gas Position -

NAT shown on tab

NAT

setting screw from the kit and screw it into place (red for propane and blue for natural gas). Tighten the gas type setting screw by turning it clockwise. Replace the plastic protecting cap.

Honeywell Millivolt Gas Valve

Adjusting Knob

Regulator Cap

Conversion screw

(blue natural gas;

red LP/propane gas)

Figure 61

Figure 63

Top View of Hex Fitting and Orifice Strip Tab

 

 

 

 

 

Pilot for Honeywell Millivolt Gas Valve Orifice Strip Tab Positioning

 

Pilot Hood Position After

 

Loosening Hex Fitting 1/4 Turn

 

Orifice Strip Tab

 

Push Tab to Set

 

Gas Type Usage

 

Note - Orifice Strip Tab May

 

Be Randomly Located On Any

Figure 64

Side Of The Hex Fitting

 

 

 

NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.

27

Image 27
Contents Millivolt Electronic INSTALLATION INSTRUCTIONSDIRECT VENT DT-400& DR-400 MODELSGENERAL INFORMATION TYPICAL INSTALLATIONPACKAGING INTRODUCTIONAll Models ÀCOTE DE LAPPAREILMillivolt Models Electronic ModelsShelf Height inches mm Typical LocationsLOCATION APPLIANCE AND VENT CLEARANCESVertical Vent Termination Clearances TYPICAL INSTALLATION SEQUENCEDETAILED INSTALLATION STEPS VENT TERMINATION CLEARANCES12 inches 30cm Canadian InstallationUS Installation 12 inches 30cm13mm framing depth dimension when the finishAND ROUND HORIZONTAL TERMINATION SV4.5HTR 12¹⁄₈material drywall thickness is 1/2 inlisted for operation and installation with FIREPLACE SPECIFICATIONSStep 3. INSTALL THE VENT SYSTEM way. Install vent according to local codesVertical Straight Installation VERTICAL TERMINATION SYSTEMS ROOFSelect Venting System - Horizontal or Vertical Connection Vertical Offset InstallationVent / Appliance Collar Connection C. Attach vent components to each other6/12 Framing Dimensions for RoofPitch 0/12Figure 23 - Top Vent - STRAIGHT TABLE AVERTICAL VENT FIGURES/TABLES H MaximumFigure 27 - Top Vent - THREE ELBOWS TABLE DVERTICAL VENT FIGURES/TABLES Figure 26 - Rear Vent - THREE ELBOWSA. Plan the vent run F.Install firestop/spacer at ceilingTYPICAL HORIZONTAL VENT INSTALLATION HORIZONTAL OUTSIDE WALL TERMINATION SYSTEMShort Square SV4.5HTSS Connecting/Recessing Long Square Horizontalattach termination adapter Square SV4.5HTSLONG SQUARE TERMINATION 3.Install the round termination SV4.5HTRHORIZONTAL VENT FIGURES/TABLES Venting ComponentsV Minimum TABLE FV Minimum H MaximumFigure 39- Top Vent - TWO 90 DEGREE ELBOWS HORIZONTAL VENT FIGURES/TABLE CONTINUEDTABLE J H + H1 Maximum terminationA. Install the Inner Flex Pipe B. Install the Outer Flex PipeC. Route Flex Vent Step 4. FIELD WIRING A. SIT and Honeywell Millivolt WiringB. Electronic Wiring See Figure Opening Control Compartment Door Step 6. CONNECTING GAS LINEOptional Gas Flex Line Connector FBK-250Blower Kit See FigureSit and Honeywell Millivolt Gas Valve Step 7. INSTALLING LOGS AND GLOWING EMBERSStep 9. INSTALLING THE GLASS DOOR AdjustmentFINISHING REQUIREMENTS Wall Details Step 10. BURNER ADJUSTMENTSStep 11. HOOD INSTALLATION Burner AdjustmentCOLD CLIMATE INSULATION INSTALLATION ACCESSORIESMANTEL CLEARANCES Inches mmINSTALLATION ACCESSORIES Continued DescriptionModel No. Description Natural To Propane Gas Conversion Kit SIT Systems AND .2 INSTALLATION CODEGAS CONVERSION KITS In CanadaStep 5. Millivolt Appliances Honeywell Systems Adjusting KnobPilot for SIT Millivolt Gas Valve Pilot Orifice Pilot for Honeywell Millivolt Gas ValveModel No Spring Adjusting ScrewPilot PilotAssembly Orifice Ignitor Assembly All Models