Superior
DR-400CMN Pilot for SIT Millivolt Gas Valve Pilot Orifice, Honeywell Millivolt Gas Valve
Specification
Install
Field Wiring
Dimension
Installation Accessories
Adjustment
Page 27
Page 26
Page 28
Image 27
Page 26
Page 28
Contents
Millivolt Electronic
INSTALLATION INSTRUCTIONS
DIRECT VENT DT-400& DR-400
MODELS
GENERAL INFORMATION
TYPICAL INSTALLATION
PACKAGING
INTRODUCTION
All Models
ÀCOTE DE LAPPAREIL
Millivolt Models
Electronic Models
Shelf Height inches mm
Typical Locations
LOCATION
APPLIANCE AND VENT CLEARANCES
Vertical Vent Termination Clearances
TYPICAL INSTALLATION SEQUENCE
DETAILED INSTALLATION STEPS
VENT TERMINATION CLEARANCES
12 inches 30cm
Canadian Installation
US Installation
12 inches 30cm
13mm
framing depth dimension when the finish
AND ROUND HORIZONTAL TERMINATION SV4.5HTR
12¹⁄₈material drywall thickness is 1/2 in
listed for operation and installation with
FIREPLACE SPECIFICATIONS
Step 3. INSTALL THE VENT SYSTEM
way. Install vent according to local codes
Vertical Straight Installation
VERTICAL TERMINATION SYSTEMS ROOF
Select Venting System - Horizontal or Vertical
Connection
Vertical Offset Installation
Vent / Appliance Collar Connection
C. Attach vent components to each other
6/12
Framing Dimensions for Roof
Pitch
0/12
Figure 23 - Top Vent - STRAIGHT
TABLE A
VERTICAL VENT FIGURES/TABLES
H Maximum
Figure 27 - Top Vent - THREE ELBOWS
TABLE D
VERTICAL VENT FIGURES/TABLES
Figure 26 - Rear Vent - THREE ELBOWS
A. Plan the vent run
F.Install firestop/spacer at ceiling
TYPICAL HORIZONTAL VENT INSTALLATION
HORIZONTAL OUTSIDE WALL TERMINATION SYSTEM
Short Square SV4.5HTSS
Connecting/Recessing Long Square Horizontal
attach termination adapter
Square SV4.5HTS
LONG SQUARE TERMINATION
3.Install the round termination SV4.5HTR
HORIZONTAL VENT FIGURES/TABLES
Venting Components
V Minimum
TABLE F
V Minimum
H Maximum
Figure 39- Top Vent - TWO 90 DEGREE ELBOWS
HORIZONTAL VENT FIGURES/TABLE CONTINUED
TABLE J
H + H1 Maximum termination
A. Install the Inner Flex Pipe
B. Install the Outer Flex Pipe
C. Route Flex Vent
Step 4. FIELD WIRING
A. SIT and Honeywell Millivolt Wiring
B. Electronic Wiring See Figure
Opening Control Compartment Door
Step 6. CONNECTING GAS LINE
Optional Gas Flex Line Connector
FBK-250Blower Kit See Figure
Sit and Honeywell Millivolt Gas Valve
Step 7. INSTALLING LOGS AND GLOWING EMBERS
Step 9. INSTALLING THE GLASS DOOR
Adjustment
FINISHING REQUIREMENTS Wall Details
Step 10. BURNER ADJUSTMENTS
Step 11. HOOD INSTALLATION
Burner Adjustment
COLD CLIMATE INSULATION
INSTALLATION ACCESSORIES
MANTEL CLEARANCES
Inches mm
INSTALLATION ACCESSORIES Continued
Description
Model No. Description
Natural To Propane Gas Conversion Kit SIT Systems
AND .2 INSTALLATION CODE
GAS CONVERSION KITS
In Canada
Step 5. Millivolt Appliances Honeywell Systems
Adjusting Knob
Pilot for SIT Millivolt Gas Valve Pilot Orifice
Pilot for Honeywell Millivolt Gas Valve
Model No
Spring Adjusting Screw
Pilot PilotAssembly Orifice Ignitor Assembly
All Models
Related pages
All Adjust page
Image Lock Auto Adjustment PIP Picture for Samsung LS20BRCASZ/EDC
Adjusting the volume for Grundig UMS 4600 DEC
OSD Adjustments for Elo TouchSystems ET1545C
Image Adjustment for Toshiba e-STUDIO202L
Adjusting the Menu Settings for JVC JLC47BC3000-B
Adjusting LCD Dimmer for Furuno NX-700A
Adjusting the Horizontal Position for Canon X700
Adjusting the Volume for JVC LVT1356-001B
Sound Adjustment for BOXLIGHT cp-305t
Adjust Minute for Samsung TX R2779H
What is included in the
Samsung SM-R140 manual
?
Top
Page
Image
Contents