Superior
DT-400CMN Typical Locations, Appliance And Vent Clearances, Shelf Height inches mm
Specs
Install
Field Wiring
Dimension
Installation Accessories
Adjustment
Page 4
Page 3
Page 5
Image 4
Page 3
Page 5
Contents
INSTALLATION INSTRUCTIONS
DIRECT VENT DT-400& DR-400
MODELS
Millivolt Electronic
TYPICAL INSTALLATION
PACKAGING
INTRODUCTION
GENERAL INFORMATION
ÀCOTE DE LAPPAREIL
Millivolt Models
Electronic Models
All Models
Typical Locations
LOCATION
APPLIANCE AND VENT CLEARANCES
Shelf Height inches mm
TYPICAL INSTALLATION SEQUENCE
DETAILED INSTALLATION STEPS
VENT TERMINATION CLEARANCES
Vertical Vent Termination Clearances
Canadian Installation
US Installation
12 inches 30cm
12 inches 30cm
framing depth dimension when the finish
AND ROUND HORIZONTAL TERMINATION SV4.5HTR
12¹⁄₈material drywall thickness is 1/2 in
13mm
FIREPLACE SPECIFICATIONS
Step 3. INSTALL THE VENT SYSTEM
way. Install vent according to local codes
listed for operation and installation with
VERTICAL TERMINATION SYSTEMS ROOF
Vertical Straight Installation
Select Venting System - Horizontal or Vertical
Vertical Offset Installation
Vent / Appliance Collar Connection
C. Attach vent components to each other
Connection
Framing Dimensions for Roof
Pitch
0/12
6/12
TABLE A
VERTICAL VENT FIGURES/TABLES
H Maximum
Figure 23 - Top Vent - STRAIGHT
TABLE D
VERTICAL VENT FIGURES/TABLES
Figure 26 - Rear Vent - THREE ELBOWS
Figure 27 - Top Vent - THREE ELBOWS
F.Install firestop/spacer at ceiling
TYPICAL HORIZONTAL VENT INSTALLATION
HORIZONTAL OUTSIDE WALL TERMINATION SYSTEM
A. Plan the vent run
Connecting/Recessing Long Square Horizontal
attach termination adapter
Square SV4.5HTS
Short Square SV4.5HTSS
3.Install the round termination SV4.5HTR
HORIZONTAL VENT FIGURES/TABLES
Venting Components
LONG SQUARE TERMINATION
TABLE F
V Minimum
H Maximum
V Minimum
HORIZONTAL VENT FIGURES/TABLE CONTINUED
TABLE J
H + H1 Maximum termination
Figure 39- Top Vent - TWO 90 DEGREE ELBOWS
B. Install the Outer Flex Pipe
A. Install the Inner Flex Pipe
C. Route Flex Vent
A. SIT and Honeywell Millivolt Wiring
Step 4. FIELD WIRING
B. Electronic Wiring See Figure
Step 6. CONNECTING GAS LINE
Optional Gas Flex Line Connector
FBK-250Blower Kit See Figure
Opening Control Compartment Door
Step 7. INSTALLING LOGS AND GLOWING EMBERS
Step 9. INSTALLING THE GLASS DOOR
Adjustment
Sit and Honeywell Millivolt Gas Valve
Step 10. BURNER ADJUSTMENTS
Step 11. HOOD INSTALLATION
Burner Adjustment
FINISHING REQUIREMENTS Wall Details
INSTALLATION ACCESSORIES
MANTEL CLEARANCES
Inches mm
COLD CLIMATE INSULATION
Description
INSTALLATION ACCESSORIES Continued
Model No. Description
AND .2 INSTALLATION CODE
GAS CONVERSION KITS
In Canada
Natural To Propane Gas Conversion Kit SIT Systems
Adjusting Knob
Pilot for SIT Millivolt Gas Valve Pilot Orifice
Pilot for Honeywell Millivolt Gas Valve
Step 5. Millivolt Appliances Honeywell Systems
Spring Adjusting Screw
Pilot PilotAssembly Orifice Ignitor Assembly
All Models
Model No
Related pages
Troubleshooting for Nokia HS 3W
Specifications for Wolf C36S-6
Understanding error messages for Samsung P1001GW/YLP
Flowchart 2.20 No Network or Modem Connection for Compaq N410c
How to Copy a CD or DVD for Dell 1501
UNE Installation Adéquate for GE 591
Parts List Model for Century PM-1779AA
Country Code List for JVC HR-XV2E
Technical data for Electrolux FAVORIT 54730
Where can I find the
VIZIO VX200E manual
?
Top
Page
Image
Contents