Superior DR-400CEP Vertical Offset Installation, C. Attach vent components to each other

Page 10
Vertical (Offset) Installation

10

Vertical (Offset) Installation

Analyze the vent routing and determine the quantities of vent sections and number of el- bows required. Refer to Vertical Vent Figures and Tables on page 12 and 13 to select the type of vertical installation desired. Vent sections are available in net lengths of 4 ¹⁄₂" (114 mm), 10 ¹⁄₂" (267 mm), 22 ¹⁄₂" (572 mm), 34 ¹⁄₂" (876

mm)and 46 ¹⁄₂" (1181 mm). Refer to the Vent Section Length Chart on page 9 for an aid in

selecting length combinations. Elbows are avail- able in 90° and 45° configurations. Refer to Figure 18 for the SV4.5E45 and SV4.5E90 elbow dimensional specifications.

Where required, a telescopic vent section (SV4.5LA) may be used to provide the installer with an option in installing in tight and confined spaces or where the vent run made up of fixed length pieces develops a joint in a undesirable location, or will not build up to the required length. The SV4.5LA Telescopic Vent Section has an effective length of from 1 ¹⁄₂" (38 mm) to 7 ¹⁄₂" (191 mm). The SV4.5LA is fitted with a locking inclined channel end (identical to a normal vent section component) and a plain end with 3 pilot holes. Slip the plain end over the locking channel end of a standard SV4.5 vent component the required distance and secure with three screws.

Maintain a minimum 1" (25 mm) clearance to combustible materials for all vertical elements. Clearances for all horizontal elements are 3" (76 mm) on top, 1" (25 mm) on sides and 1" (25 mm) on the bottom.

A. Frame ceiling opening - Use a plumb line from the ceiling above the appliance to lo- cate center of the vertical run. Cut and/or frame an opening, 10¹⁄₂" x 10¹⁄₂" (267mm x 267mm) inside dimensions, about this cen- ter mark (Figure 14).

Vent / Appliance Collar 10¹⁄₂” Min. (267 mm)

10¹⁄₂” Min.

(267 mm)

Figure 14

B. Attach vent components to appliance - Secure Vent SV4.5 direct vent system compo- nents are unitized concentric pipe components featuring positive twist lock connections (see Figure 15 ).

All of the appliances covered in this document are fitted with collars having locking inclined channels. The dimpled end of the vent compo- nents fit over the appliance collar to create the positive twist lock connection.

First Vent

Connection Component

Align the dimple (four places) with the opening of the locking incline channel on appliance collar. Twist vent component clockwise to engage and seal.

Dimple

Locking

C. Attach vent components to each other -Manual background Incline Channel

Appliance collar

Vent / Appliance Collar

Connection

Figure 15

Arrow

Align the dimple (four places) of the

 

upper vent section with the opening of

 

the locking incline channel on the

 

lower vent section. Twist vent

 

component clockwise to engage and

 

seal until arrow and dimple align.

 

Dimple

 

 

Locking

 

 

Incline Channel

 

 

Connected

 

 

Vent Sections

Arrow

Arrow

Vent / Vent Section

 

 

Connection

 

Figure 16

To attach a vent component to the appliance collar, align the dimpled end over the collar, adjusting the radial alignment until the four locking dimples are aligned with the inlet of the four inclined channels on the collar (refer to Figure 15 ). Push the vent component against the collar until it fully engages, then twist the component clockwise, running the dimples down and along the incline channels until they seat at the end of the channels. The unitized design of the Secure Vent components will engage and seal both the inner and outer pipe without the need for sealant or screws. If desired, a #6 x ¹⁄₂" screw may be used at the joint, but is not required as the pipe will se- curely lock when twisted.

Note: An elbow may also be attached to the appliance collar. Attach in the same manner as you would a vent section.

C. Attach vent components to each other -

Other vent sections may be added to the pre- viously installed section in accordance with the requirements of the vertical vent figures and tables.

NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.

To add another vent component to a length of vent run, align the dimpled end over the inclined channel end of the previously installed section, adjusting the radial alignment until the four locking dimples are aligned with the inlets of the four incline channels of the previous section.

Push the vent component against the previous section until it fully engages, then twist the component clockwise running the dimples down and along the incline channels until they seat at the end of the channels.This seating position is indicated by the alignment of the arrow and dimple as shown in Figure 16.

D. Install firestop/spacer at ceiling - Use a SV4.5BF firestop/spacer at ceiling joists. If there is living space above the ceiling level, the firestop/spacer must be installed on the bot- tom side of the ceiling. If attic space is above the ceiling, the firestop/spacer must be in- stalled on the top side of the joist. Route the vent sections through the framed opening and secure the firestop/spacer with 8d nails or other appropriate fasteners at each corner.

Remember to maintain 1" (25 mm) clear- ance to combustibles, framing members, and attic or ceiling insulation when running vertical chimney sections.

E. Support the vertical vent run sections - Note - Proper venting support is very impor- tant. The weight of the vent must not be sup- ported by the firplace in any degree.

Support the vertical portion of the venting sys- tem every 8 feet (2.4m) above the fireplace vent outlet. One method of support is by utilizing field provided support straps (conventional plumber's tape). Secure the plumber's tape to the framing members with nails or screws.

Blocking

Support Straps

(Plumber’s tape)

8 feet (2.4 m)

Maximum

1 inch

(25.4 mm)

minimum

clearance to

combustibles

Figure 17

Image 10
Contents MODELS INSTALLATION INSTRUCTIONSDIRECT VENT DT-400& DR-400 Millivolt ElectronicINTRODUCTION TYPICAL INSTALLATIONPACKAGING GENERAL INFORMATIONElectronic Models ÀCOTE DE LAPPAREILMillivolt Models All ModelsAPPLIANCE AND VENT CLEARANCES Typical LocationsLOCATION Shelf Height inches mmVENT TERMINATION CLEARANCES TYPICAL INSTALLATION SEQUENCEDETAILED INSTALLATION STEPS Vertical Vent Termination Clearances12 inches 30cm Canadian InstallationUS Installation 12 inches 30cm12¹⁄₈material drywall thickness is 1/2 in framing depth dimension when the finishAND ROUND HORIZONTAL TERMINATION SV4.5HTR 13mmway. Install vent according to local codes FIREPLACE SPECIFICATIONSStep 3. INSTALL THE VENT SYSTEM listed for operation and installation withVERTICAL TERMINATION SYSTEMS ROOF Vertical Straight InstallationSelect Venting System - Horizontal or Vertical C. Attach vent components to each other Vertical Offset InstallationVent / Appliance Collar Connection Connection0/12 Framing Dimensions for RoofPitch 6/12H Maximum TABLE AVERTICAL VENT FIGURES/TABLES Figure 23 - Top Vent - STRAIGHTFigure 26 - Rear Vent - THREE ELBOWS TABLE DVERTICAL VENT FIGURES/TABLES Figure 27 - Top Vent - THREE ELBOWSHORIZONTAL OUTSIDE WALL TERMINATION SYSTEM F.Install firestop/spacer at ceilingTYPICAL HORIZONTAL VENT INSTALLATION A. Plan the vent runSquare SV4.5HTS Connecting/Recessing Long Square Horizontalattach termination adapter Short Square SV4.5HTSSVenting Components 3.Install the round termination SV4.5HTRHORIZONTAL VENT FIGURES/TABLES LONG SQUARE TERMINATIONH Maximum TABLE FV Minimum V MinimumH + H1 Maximum termination HORIZONTAL VENT FIGURES/TABLE CONTINUEDTABLE J Figure 39- Top Vent - TWO 90 DEGREE ELBOWSB. Install the Outer Flex Pipe A. Install the Inner Flex PipeC. Route Flex Vent A. SIT and Honeywell Millivolt Wiring Step 4. FIELD WIRINGB. Electronic Wiring See Figure FBK-250Blower Kit See Figure Step 6. CONNECTING GAS LINEOptional Gas Flex Line Connector Opening Control Compartment DoorAdjustment Step 7. INSTALLING LOGS AND GLOWING EMBERSStep 9. INSTALLING THE GLASS DOOR Sit and Honeywell Millivolt Gas ValveBurner Adjustment Step 10. BURNER ADJUSTMENTSStep 11. HOOD INSTALLATION FINISHING REQUIREMENTS Wall DetailsInches mm INSTALLATION ACCESSORIESMANTEL CLEARANCES COLD CLIMATE INSULATIONDescription INSTALLATION ACCESSORIES ContinuedModel No. Description In Canada AND .2 INSTALLATION CODEGAS CONVERSION KITS Natural To Propane Gas Conversion Kit SIT SystemsPilot for Honeywell Millivolt Gas Valve Adjusting KnobPilot for SIT Millivolt Gas Valve Pilot Orifice Step 5. Millivolt Appliances Honeywell SystemsAll Models Spring Adjusting ScrewPilot PilotAssembly Orifice Ignitor Assembly Model No