Superior
DR-400CMP Mantel Clearances, Inches mm, Cold Climate Insulation, Model No, Description
Specification
Install
Field Wiring
Dimension
Installation Accessories
Adjustment
Page 24
Page 23
Page 25
Image 24
Page 23
Page 25
Contents
INSTALLATION INSTRUCTIONS
DIRECT VENT DT-400& DR-400
MODELS
Millivolt Electronic
TYPICAL INSTALLATION
PACKAGING
INTRODUCTION
GENERAL INFORMATION
ÀCOTE DE LAPPAREIL
Millivolt Models
Electronic Models
All Models
Typical Locations
LOCATION
APPLIANCE AND VENT CLEARANCES
Shelf Height inches mm
TYPICAL INSTALLATION SEQUENCE
DETAILED INSTALLATION STEPS
VENT TERMINATION CLEARANCES
Vertical Vent Termination Clearances
Canadian Installation
US Installation
12 inches 30cm
12 inches 30cm
framing depth dimension when the finish
AND ROUND HORIZONTAL TERMINATION SV4.5HTR
12¹⁄₈material drywall thickness is 1/2 in
13mm
FIREPLACE SPECIFICATIONS
Step 3. INSTALL THE VENT SYSTEM
way. Install vent according to local codes
listed for operation and installation with
Vertical Straight Installation
VERTICAL TERMINATION SYSTEMS ROOF
Select Venting System - Horizontal or Vertical
Vertical Offset Installation
Vent / Appliance Collar Connection
C. Attach vent components to each other
Connection
Framing Dimensions for Roof
Pitch
0/12
6/12
TABLE A
VERTICAL VENT FIGURES/TABLES
H Maximum
Figure 23 - Top Vent - STRAIGHT
TABLE D
VERTICAL VENT FIGURES/TABLES
Figure 26 - Rear Vent - THREE ELBOWS
Figure 27 - Top Vent - THREE ELBOWS
F.Install firestop/spacer at ceiling
TYPICAL HORIZONTAL VENT INSTALLATION
HORIZONTAL OUTSIDE WALL TERMINATION SYSTEM
A. Plan the vent run
Connecting/Recessing Long Square Horizontal
attach termination adapter
Square SV4.5HTS
Short Square SV4.5HTSS
3.Install the round termination SV4.5HTR
HORIZONTAL VENT FIGURES/TABLES
Venting Components
LONG SQUARE TERMINATION
TABLE F
V Minimum
H Maximum
V Minimum
HORIZONTAL VENT FIGURES/TABLE CONTINUED
TABLE J
H + H1 Maximum termination
Figure 39- Top Vent - TWO 90 DEGREE ELBOWS
A. Install the Inner Flex Pipe
B. Install the Outer Flex Pipe
C. Route Flex Vent
Step 4. FIELD WIRING
A. SIT and Honeywell Millivolt Wiring
B. Electronic Wiring See Figure
Step 6. CONNECTING GAS LINE
Optional Gas Flex Line Connector
FBK-250Blower Kit See Figure
Opening Control Compartment Door
Step 7. INSTALLING LOGS AND GLOWING EMBERS
Step 9. INSTALLING THE GLASS DOOR
Adjustment
Sit and Honeywell Millivolt Gas Valve
Step 10. BURNER ADJUSTMENTS
Step 11. HOOD INSTALLATION
Burner Adjustment
FINISHING REQUIREMENTS Wall Details
INSTALLATION ACCESSORIES
MANTEL CLEARANCES
Inches mm
COLD CLIMATE INSULATION
INSTALLATION ACCESSORIES Continued
Description
Model No. Description
AND .2 INSTALLATION CODE
GAS CONVERSION KITS
In Canada
Natural To Propane Gas Conversion Kit SIT Systems
Adjusting Knob
Pilot for SIT Millivolt Gas Valve Pilot Orifice
Pilot for Honeywell Millivolt Gas Valve
Step 5. Millivolt Appliances Honeywell Systems
Spring Adjusting Screw
Pilot PilotAssembly Orifice Ignitor Assembly
All Models
Model No
Related pages
All Access page
Accessoires for Bostitch CAP1645-OF
Accessing Programming Features of Remote Cameras for Pelco C2631M-A
Accessories for Schlage D-Series
Attachments & Accessories for Porter-Cable CFFR350C
Accessing System Features System Feature Access for Panasonic KX-TDA15
ª Card access lamp for Panasonic PV-GS500
QoS for Internet Access for NETGEAR N750
Accessory Order Form for RCA F32550
Accessories 132 for LG Electronics MN510
Supplied Accessories for Palsonic TFTV81HDT
How long does the
Fat Burner Program
last on the EFX 5.23?
Top
Page
Image
Contents