Minimum Clearances

The New Buck Corporation Model 80 must be installed in compliance with the instructions contained in this manual.

Clearance from combustible walls and ceilings. (Using single wall chimney connector)

The minimum lateral distance between any part of the room heater and combustible wall is shown in Figures 6 and 7.

FIGURE 6

FIGURE

7

FLOOR PROTECTION

If a freestanding model is to be installed on a combustible floor, a non-combustible pad must be placed below it to protect the floor from burning material from the stove. The pad must be 37" wide by 37 1/2" deep. Floor protector must be 3/8" in minimum thickness, non-combustible material or equivalent.

The unit must be positioned on the pad so that there is a minimum of 16" from the front of the door opening to the front of the pad, and a minimum of 8" measured horizontally from the sides of the fuel loading and ash removal openings to the sides of the pad.

NOTE: For clearance reductions using wall protectors, refer to the NFPA-211 Code.

TOOLS FOR INSTALLATION

Drop Cloth

Electric Drill with 7/32" drill bit 1/2" - 9/16" combination wrench

3/8" magnetic socket chuck adapter, 3/8" wrench (box or socket) or adjustable wrench Socket Set

Tape Measure Pencil Level Screw Driver

12

Image 14
Contents SAFETY NOTICE FEATURES PREPARATION INSTALLATIONOPERATION MAINTENANCE SAFETY “MEETS PHASE II EPA STANDARDS”Page SECTION TABLE OF CONTENTSSECTION SECTIONPage ROOM HEATER FEATURES SECTIONModel 80 Wood Stove CATALYST EQUIPPED CATALYST WARRANTYEPA COMPLIANCE STATUS PROPER FUEL SELECTIONCAUTION AGAINST OVER-FIRING ACHIEVING CATALYTIC LIGHT-OFFWHEN REFUELINGCATALYST MONITORING ASH REMOVALREQUIRED FIREPLACE DIMENSIONS MASONRY INSERT INSTALLATIONINSTALLATIONS Fireplace Insert INSTALLATION PRECAUTIONSPOSITIONING THE HEATER POSSIBLE TOOLS NEEDED FOR INSTALLATIONINSTALLATION PREPARATION FireplaceMOUNTING THE TRIM PANELS FINAL CHECK SECTION RESIDENTIAL FREESTANDING ROOM HEATER INSTALLATIONINSTALLATION PRECAUTION MODEL Minimum Clearances TOOLS FOR INSTALLATIONFLOOR PROTECTION DETERMINING THE CHIMNEY LOCATION Preparing The Stove for InstallationCHIMNEY Wall Exit Into Masonry using single wall pipe Wall Exit Into Metal Tee-BoxCeiling Exit-CloseClearance Tested and Listed Wall Protector ALTERNATIVES FOR WALL PROTECTIONFINAL CHECK Unlisted and Untested Wall Protector3.Open the primary air drafts and damper bypass WOOD HEATER SAFETY SECTIONSECTION GUIDE TO THE DIFFERENT BURNING QUALITIES OF WOODOPERATION Building a Fire PREVENTIVE MAINTENANCE / PARTS REPLACEMENT Disassembly Inspection and Catalytic ReplacementGASKET REPLACEMENT Cold Heater SECTIONPage Solution TROUBLESHOOTINGProblem SECTIONCOMBUSTOR-RELATEDPROBLEMS ProblemSolution Possible CauseNEW BUCK CORPORATION NBC