New Buck Corporation
Heater Model 80
manual
Ad
Troubleshooting
Install
Warranty
Problem
“Meets Phase Ii Epa Standards”
GASKET REPLACEMENT Cold Heater
Installation Precaution
Safety
Room Heater Features
Page 4
2
Page 3
Page 5
Image 4
Page 3
Page 5
Contents
FEATURES PREPARATION INSTALLATION
OPERATION MAINTENANCE SAFETY
SAFETY NOTICE
“MEETS PHASE II EPA STANDARDS”
Page
TABLE OF CONTENTS
SECTION
SECTION
SECTION
Page
ROOM HEATER FEATURES
SECTION
Model 80 Wood Stove
CATALYST WARRANTY
EPA COMPLIANCE STATUS
CATALYST EQUIPPED
PROPER FUEL SELECTION
ACHIEVING CATALYTIC LIGHT-OFFWHEN REFUELING
CATALYST MONITORING
CAUTION AGAINST OVER-FIRING
ASH REMOVAL
MASONRY INSERT INSTALLATION
INSTALLATIONS Fireplace Insert
REQUIRED FIREPLACE DIMENSIONS
INSTALLATION PRECAUTIONS
POSSIBLE TOOLS NEEDED FOR INSTALLATION
INSTALLATION PREPARATION
POSITIONING THE HEATER
Fireplace
MOUNTING THE TRIM PANELS
FINAL CHECK
INSTALLATION PRECAUTION
RESIDENTIAL FREESTANDING ROOM HEATER INSTALLATION
SECTION
FLOOR PROTECTION
TOOLS FOR INSTALLATION
MODEL Minimum Clearances
CHIMNEY
Preparing The Stove for Installation
DETERMINING THE CHIMNEY LOCATION
Wall Exit Into Masonry using single wall pipe
Wall Exit Into Metal Tee-Box
Ceiling Exit-CloseClearance
ALTERNATIVES FOR WALL PROTECTION
FINAL CHECK
Tested and Listed Wall Protector
Unlisted and Untested Wall Protector
3.Open the primary air drafts and damper bypass
WOOD HEATER SAFETY
SECTION
OPERATION
GUIDE TO THE DIFFERENT BURNING QUALITIES OF WOOD
SECTION
Building a Fire
Disassembly Inspection and Catalytic Replacement
GASKET REPLACEMENT Cold Heater
PREVENTIVE MAINTENANCE / PARTS REPLACEMENT
SECTION
Page
TROUBLESHOOTING
Problem
Solution
SECTION
Problem
Solution
COMBUSTOR-RELATEDPROBLEMS
Possible Cause
NEW BUCK CORPORATION NBC
Related pages
How do I configure
ios-xr route-policy
for my network router?
Top
Page
Image
Contents