New Buck Corporation Heater Model 80 manual Building a Fire

Page 22
Image 22
Contents SAFETY NOTICE FEATURES PREPARATION INSTALLATIONOPERATION MAINTENANCE SAFETY “MEETS PHASE II EPA STANDARDS”Page SECTION TABLE OF CONTENTSSECTION SECTIONPage ROOM HEATER FEATURES SECTIONModel 80 Wood Stove CATALYST EQUIPPED CATALYST WARRANTYEPA COMPLIANCE STATUS PROPER FUEL SELECTIONCAUTION AGAINST OVER-FIRING ACHIEVING CATALYTIC LIGHT-OFFWHEN REFUELINGCATALYST MONITORING ASH REMOVALREQUIRED FIREPLACE DIMENSIONS MASONRY INSERT INSTALLATIONINSTALLATIONS Fireplace Insert INSTALLATION PRECAUTIONSPOSITIONING THE HEATER POSSIBLE TOOLS NEEDED FOR INSTALLATIONINSTALLATION PREPARATION FireplaceMOUNTING THE TRIM PANELS FINAL CHECK INSTALLATION PRECAUTION RESIDENTIAL FREESTANDING ROOM HEATER INSTALLATIONSECTION FLOOR PROTECTION TOOLS FOR INSTALLATIONMODEL Minimum Clearances CHIMNEY Preparing The Stove for InstallationDETERMINING THE CHIMNEY LOCATION Wall Exit Into Masonry using single wall pipe Wall Exit Into Metal Tee-BoxCeiling Exit-CloseClearance Tested and Listed Wall Protector ALTERNATIVES FOR WALL PROTECTIONFINAL CHECK Unlisted and Untested Wall Protector3.Open the primary air drafts and damper bypass WOOD HEATER SAFETY SECTIONOPERATION GUIDE TO THE DIFFERENT BURNING QUALITIES OF WOODSECTION Building a Fire PREVENTIVE MAINTENANCE / PARTS REPLACEMENT Disassembly Inspection and Catalytic ReplacementGASKET REPLACEMENT Cold Heater SECTIONPage Solution TROUBLESHOOTINGProblem SECTIONCOMBUSTOR-RELATEDPROBLEMS ProblemSolution Possible CauseNEW BUCK CORPORATION NBC