New Buck Corporation Heater Model 80 manual Wall Exit Into Metal Tee-Box

Page 16
Wall Exit Into Metal Tee-Box

3.Now connect the stove to the ceiling support box by using #24 ga. minimum blued or black steel chimney pipe. (Do not use galvanized pipe.) Connect each section so the crimpled end faces downward, and secure each section to each other using at least three (3) sheet metal screws or rivets. (See Figure 8)

Wall Exit Into Metal Tee-Box

1.Mark the plumb line on the wall dir-

ectly behind the center of the heater. (See Figure 9)

NOTE: When using #24 ga. min. blue or black steel pipe, maintain 18" between pipe and ceiling.

2.Place the vertical portion of the heater pipe and the elbow in position and project a point onto the plumb line level with the center of the elbow.

3.Measure up so there will be at least 1/4" rise per foot of horizontal connector pipe, maintaining clearances to the ceiling as noted in Figure 10. This will give you the center of the hole for the chimney penetration.

4.After locating the center of the penetration, install the tee-box and chimney as per the chimney manu- facturer’s specifications and local building codes for installation through combustible walls or ceilings.

FIGURE

9

5.Connect the chimney collar to the tee-box using #24 ga. minimum blued or black steel connector pipe. DO NOT USE GALVANIZED PIPE. Connect each section so the crimped end faces downward, and secure each section to each other using at least three steel sheet metal screws or rivets.

Wall Exit Into Masonry (using single wall pipe)

1.Before connecting the Model 80 to a masonry chimney, determine that the masonry fireplace wall pass- through connector thimble meets the NFPA-211 Code and local building codes and is a minimum of 18" from the ceiling. If the connector thimble does not meet these codes, the pass-through connector must be modified. Connectors may pass through walls or partitions constructed of combustible material if the connector is:

(a)either listed for wall pass-through or is routed through a device listed for wall pass-through and is installed in accordance with the conditions of the listing.

(b)selected or fabricated in accordance with the conditions and clearances as stated in tables 5-7 of the 1988 NFPA 211 Code. Any unexposed metal that is used as part of a wall pass-through system and is exposed to flue gases shall be constructed of stainless steel or other equivalent material that will resist corrosion, softening, or cracking from flue gases at temperatures up to 1800o F.

In addition, a connector to a masonry chimney shall extend through the wall to the inner face or liner but not beyond, and shall be firmly cemented to masonry.

EXCEPTION: A thimble may be used to facilitate removal of the chimney connector for cleaning, in which case the thimble shall be permanently cemented in place with high-temperature cement.

14

Image 16
Contents FEATURES PREPARATION INSTALLATION OPERATION MAINTENANCE SAFETYSAFETY NOTICE “MEETS PHASE II EPA STANDARDS”Page TABLE OF CONTENTS SECTIONSECTION SECTIONPage ROOM HEATER FEATURES SECTIONModel 80 Wood Stove CATALYST WARRANTY EPA COMPLIANCE STATUSCATALYST EQUIPPED PROPER FUEL SELECTIONACHIEVING CATALYTIC LIGHT-OFFWHEN REFUELING CATALYST MONITORINGCAUTION AGAINST OVER-FIRING ASH REMOVALMASONRY INSERT INSTALLATION INSTALLATIONS Fireplace InsertREQUIRED FIREPLACE DIMENSIONS INSTALLATION PRECAUTIONSPOSSIBLE TOOLS NEEDED FOR INSTALLATION INSTALLATION PREPARATIONPOSITIONING THE HEATER FireplaceMOUNTING THE TRIM PANELS FINAL CHECK INSTALLATION PRECAUTION RESIDENTIAL FREESTANDING ROOM HEATER INSTALLATIONSECTION FLOOR PROTECTION TOOLS FOR INSTALLATIONMODEL Minimum Clearances CHIMNEY Preparing The Stove for InstallationDETERMINING THE CHIMNEY LOCATION Wall Exit Into Masonry using single wall pipe Wall Exit Into Metal Tee-BoxCeiling Exit-CloseClearance ALTERNATIVES FOR WALL PROTECTION FINAL CHECKTested and Listed Wall Protector Unlisted and Untested Wall Protector3.Open the primary air drafts and damper bypass WOOD HEATER SAFETY SECTIONOPERATION GUIDE TO THE DIFFERENT BURNING QUALITIES OF WOODSECTION Building a Fire Disassembly Inspection and Catalytic Replacement GASKET REPLACEMENT Cold HeaterPREVENTIVE MAINTENANCE / PARTS REPLACEMENT SECTIONPage TROUBLESHOOTING ProblemSolution SECTIONProblem SolutionCOMBUSTOR-RELATEDPROBLEMS Possible CauseNEW BUCK CORPORATION NBC