New Buck Corporation
Heater Model 80
manual
Section, Room Heater Features
Troubleshooting
Install
Warranty
Problem
“Meets Phase Ii Epa Standards”
GASKET REPLACEMENT Cold Heater
Installation Precaution
Safety
Room Heater Features
Page 5
Page 4
Page 6
Image 5
Page 4
Page 6
Contents
OPERATION MAINTENANCE SAFETY
FEATURES PREPARATION INSTALLATION
SAFETY NOTICE
“MEETS PHASE II EPA STANDARDS”
Page
SECTION
TABLE OF CONTENTS
SECTION
SECTION
Page
SECTION
ROOM HEATER FEATURES
Model 80 Wood Stove
EPA COMPLIANCE STATUS
CATALYST WARRANTY
CATALYST EQUIPPED
PROPER FUEL SELECTION
CATALYST MONITORING
ACHIEVING CATALYTIC LIGHT-OFFWHEN REFUELING
CAUTION AGAINST OVER-FIRING
ASH REMOVAL
INSTALLATIONS Fireplace Insert
MASONRY INSERT INSTALLATION
REQUIRED FIREPLACE DIMENSIONS
INSTALLATION PRECAUTIONS
INSTALLATION PREPARATION
POSSIBLE TOOLS NEEDED FOR INSTALLATION
POSITIONING THE HEATER
Fireplace
MOUNTING THE TRIM PANELS
FINAL CHECK
SECTION
RESIDENTIAL FREESTANDING ROOM HEATER INSTALLATION
INSTALLATION PRECAUTION
MODEL Minimum Clearances
TOOLS FOR INSTALLATION
FLOOR PROTECTION
DETERMINING THE CHIMNEY LOCATION
Preparing The Stove for Installation
CHIMNEY
Wall Exit Into Metal Tee-Box
Wall Exit Into Masonry using single wall pipe
Ceiling Exit-CloseClearance
FINAL CHECK
ALTERNATIVES FOR WALL PROTECTION
Tested and Listed Wall Protector
Unlisted and Untested Wall Protector
3.Open the primary air drafts and damper bypass
SECTION
WOOD HEATER SAFETY
SECTION
GUIDE TO THE DIFFERENT BURNING QUALITIES OF WOOD
OPERATION
Building a Fire
GASKET REPLACEMENT Cold Heater
Disassembly Inspection and Catalytic Replacement
PREVENTIVE MAINTENANCE / PARTS REPLACEMENT
SECTION
Page
Problem
TROUBLESHOOTING
Solution
SECTION
Solution
Problem
COMBUSTOR-RELATEDPROBLEMS
Possible Cause
NEW BUCK CORPORATION NBC
Related pages
All Feature page
What are the features of the Intel Desktop Board DG965RY?
Learn more
Top
Page
Image
Contents