New Buck Corporation Heater Model 80 manual Open the primary air drafts and damper bypass

Page 19
Image 19
Contents “MEETS PHASE II EPA STANDARDS” FEATURES PREPARATION INSTALLATIONOPERATION MAINTENANCE SAFETY SAFETY NOTICEPage SECTION TABLE OF CONTENTSSECTION SECTIONPage SECTION ROOM HEATER FEATURESModel 80 Wood Stove PROPER FUEL SELECTION CATALYST WARRANTYEPA COMPLIANCE STATUS CATALYST EQUIPPEDASH REMOVAL ACHIEVING CATALYTIC LIGHT-OFFWHEN REFUELINGCATALYST MONITORING CAUTION AGAINST OVER-FIRINGINSTALLATION PRECAUTIONS MASONRY INSERT INSTALLATIONINSTALLATIONS Fireplace Insert REQUIRED FIREPLACE DIMENSIONSFireplace POSSIBLE TOOLS NEEDED FOR INSTALLATIONINSTALLATION PREPARATION POSITIONING THE HEATERMOUNTING THE TRIM PANELS FINAL CHECK INSTALLATION PRECAUTION RESIDENTIAL FREESTANDING ROOM HEATER INSTALLATIONSECTION FLOOR PROTECTION TOOLS FOR INSTALLATIONMODEL Minimum Clearances CHIMNEY Preparing The Stove for InstallationDETERMINING THE CHIMNEY LOCATION Wall Exit Into Metal Tee-Box Wall Exit Into Masonry using single wall pipeCeiling Exit-CloseClearance Unlisted and Untested Wall Protector ALTERNATIVES FOR WALL PROTECTIONFINAL CHECK Tested and Listed Wall Protector3.Open the primary air drafts and damper bypass SECTION WOOD HEATER SAFETYOPERATION GUIDE TO THE DIFFERENT BURNING QUALITIES OF WOODSECTION Building a Fire SECTION Disassembly Inspection and Catalytic ReplacementGASKET REPLACEMENT Cold Heater PREVENTIVE MAINTENANCE / PARTS REPLACEMENTPage SECTION TROUBLESHOOTINGProblem SolutionPossible Cause ProblemSolution COMBUSTOR-RELATEDPROBLEMSNEW BUCK CORPORATION NBC