New Buck Corporation Heater Model 80 manual Open the primary air drafts and damper bypass

Page 19

3.Open the primary air drafts and damper bypass.

4.Plug the power cord into a 115 VAC outlet.

5.Place crumpled pieces of newspaper in the stove. Light and close the door. Make sure that stove draws properly through the primary drafts.

6.Check for smoke leaks around the door.

7.Open the door and check for smoke escaping from the front of the stove. Smoking usually indicates a defective or poorly positioned chimney. Some chimneys with a marginal draft can be preheated by lighting newspaper and holding it near the open damper with a poker or fire tong. Once the chimney heats up, a proper draft can usually be obtained.

If a thorough review of the Troubleshooting Guide in the rear of the manual does not reveal your problem, contact your dealer for assistance.

NOTE: The unit is painted with a specially formulated high temperature paint that cures during the first two or three firings. You may notice a slight smoking effect and an odor of burning paint when you build the first fires. This is normal and is not a cause for alarm. In some cases, these fumes will activate a smoke alarm. Opening a window near the unit will allow these fumes to escape. DO NOT build a large, roaring fire until this curing is complete or the heater finish may be damaged.

17

Image 19
Contents “MEETS PHASE II EPA STANDARDS” FEATURES PREPARATION INSTALLATIONOPERATION MAINTENANCE SAFETY SAFETY NOTICEPage SECTION TABLE OF CONTENTSSECTION SECTIONPage SECTION ROOM HEATER FEATURESModel 80 Wood Stove PROPER FUEL SELECTION CATALYST WARRANTYEPA COMPLIANCE STATUS CATALYST EQUIPPEDASH REMOVAL ACHIEVING CATALYTIC LIGHT-OFFWHEN REFUELINGCATALYST MONITORING CAUTION AGAINST OVER-FIRINGINSTALLATION PRECAUTIONS MASONRY INSERT INSTALLATIONINSTALLATIONS Fireplace Insert REQUIRED FIREPLACE DIMENSIONSFireplace POSSIBLE TOOLS NEEDED FOR INSTALLATIONINSTALLATION PREPARATION POSITIONING THE HEATERMOUNTING THE TRIM PANELS FINAL CHECK INSTALLATION PRECAUTION RESIDENTIAL FREESTANDING ROOM HEATER INSTALLATIONSECTION FLOOR PROTECTION TOOLS FOR INSTALLATIONMODEL Minimum Clearances CHIMNEY Preparing The Stove for InstallationDETERMINING THE CHIMNEY LOCATION Wall Exit Into Metal Tee-Box Wall Exit Into Masonry using single wall pipeCeiling Exit-CloseClearance Unlisted and Untested Wall Protector ALTERNATIVES FOR WALL PROTECTIONFINAL CHECK Tested and Listed Wall Protector3.Open the primary air drafts and damper bypass SECTION WOOD HEATER SAFETYOPERATION GUIDE TO THE DIFFERENT BURNING QUALITIES OF WOODSECTION Building a Fire SECTION Disassembly Inspection and Catalytic ReplacementGASKET REPLACEMENT Cold Heater PREVENTIVE MAINTENANCE / PARTS REPLACEMENTPage SECTION TROUBLESHOOTINGProblem SolutionPossible Cause ProblemSolution COMBUSTOR-RELATEDPROBLEMSNEW BUCK CORPORATION NBC