New Buck Corporation
Heater Model 80 Disassembly Inspection and Catalytic Replacement, Section
Troubleshooting
Install
Warranty
Problem
“Meets Phase Ii Epa Standards”
GASKET REPLACEMENT Cold Heater
Installation Precaution
Safety
Room Heater Features
Page 23
Page 22
Page 24
Image 23
Page 22
Page 24
Contents
“MEETS PHASE II EPA STANDARDS”
FEATURES PREPARATION INSTALLATION
OPERATION MAINTENANCE SAFETY
SAFETY NOTICE
Page
SECTION
TABLE OF CONTENTS
SECTION
SECTION
Page
SECTION
ROOM HEATER FEATURES
Model 80 Wood Stove
PROPER FUEL SELECTION
CATALYST WARRANTY
EPA COMPLIANCE STATUS
CATALYST EQUIPPED
ASH REMOVAL
ACHIEVING CATALYTIC LIGHT-OFFWHEN REFUELING
CATALYST MONITORING
CAUTION AGAINST OVER-FIRING
INSTALLATION PRECAUTIONS
MASONRY INSERT INSTALLATION
INSTALLATIONS Fireplace Insert
REQUIRED FIREPLACE DIMENSIONS
Fireplace
POSSIBLE TOOLS NEEDED FOR INSTALLATION
INSTALLATION PREPARATION
POSITIONING THE HEATER
MOUNTING THE TRIM PANELS
FINAL CHECK
SECTION
RESIDENTIAL FREESTANDING ROOM HEATER INSTALLATION
INSTALLATION PRECAUTION
MODEL Minimum Clearances
TOOLS FOR INSTALLATION
FLOOR PROTECTION
DETERMINING THE CHIMNEY LOCATION
Preparing The Stove for Installation
CHIMNEY
Wall Exit Into Metal Tee-Box
Wall Exit Into Masonry using single wall pipe
Ceiling Exit-CloseClearance
Unlisted and Untested Wall Protector
ALTERNATIVES FOR WALL PROTECTION
FINAL CHECK
Tested and Listed Wall Protector
3.Open the primary air drafts and damper bypass
SECTION
WOOD HEATER SAFETY
SECTION
GUIDE TO THE DIFFERENT BURNING QUALITIES OF WOOD
OPERATION
Building a Fire
SECTION
Disassembly Inspection and Catalytic Replacement
GASKET REPLACEMENT Cold Heater
PREVENTIVE MAINTENANCE / PARTS REPLACEMENT
Page
SECTION
TROUBLESHOOTING
Problem
Solution
Possible Cause
Problem
Solution
COMBUSTOR-RELATEDPROBLEMS
NEW BUCK CORPORATION NBC
Related pages
All Placement page
Is there a difference between installing the fence on the G1018 and G0500?
Fence Installation Comparison
Top
Page
Image
Contents