New Buck Corporation 34 manual

Page 29

B.Set the top (long) trim panel in place on top of unit. The panel should be flat against the outside face of the fireplace, and standing vertically. Mark along the lower edge of the trim panel with a pencil to make reference line for mounting.

NOTE: If used in installation trim panels or surrounds shall not seal ventilation openings in the fireplace.

Also provide adequate clearances around air openings.

(4)Slide the unit out of the fireplace far enough to work behind the trim panel reference lines with a screw gun.

NOTE: You need to make sure the supply gas line is hooked up at this time. Be sure to check for leaks at the connection using soap and water. DO NOT USE OPEN FLAME TEST FOR LEAKS.

(5)With screws provided with fireplace kit, attach both side trim panels. Next, attach top trim panels.

(6)Slide the heater back into the fireplace with the trim panels flat against the face of the fireplace.

(7)After hooking up gas line, checking for leaks, and mounting trim panels slide heater into fireplace.

(8)Place logs on burner base as shown on page’s 8 or 9.

(9)For gas hook-up and pressure tap test, see instruction in Section II.

NOTE: Smoke shelves, shields and baffles may be removed if attached by mechanical fasteners.

27

Image 29
Contents Model Page Table of Contents Model Page Section I Safety Information Warnings Page Page Fireplace Preparation SectionGAS Connection Installation and ClearancesPage Millivolt only Millivolt SIT MANUAL-MODULATING GAS Pressure CheckWhat to do if YOU Smell GAS Rocker Switch ITT Valve Shutting OFF Unit To Turn OFF GAS to ApplianceThermostat Control Operation Manual Lighting ProcedureLighting Instruction Modulating Valve SIT Manual Valve SIT For Your Safety Read Before LightingLighting Instruction Page Thermostat Control Operation Operating Instructions Page Page Manual Lighting Procedure Flame Check When Used AS a Heating Appliance Heat OutputCR3329 LOG SET B. LOG SETWiring Diagram Room Blower Installation and Operation Instructions Ceiling Page Page Page Choosing the Location for Your Fireplace Section V Model 34 ZC Zero Clearance InstallationGAS Line DraftsGAS Line Fireplace Clearances ZC Installing the Firebox ZCClearances ZC Finishing Your Fireplace ZCSection After Market Mobile Home Installation Determine if YOU have a Confined or Unconfined Space Producing Adequate VentilationDetermining FRESH-AIR Flow for Heater Location Determine the volume of the space length x width x height Ventilation AIR from Inside Building Ventilation AIRVentilation AIR from Outdoors Cleaning Important SafeguardsSolution Observed Possible Problem CauseObserved Possible Problem Solution Observed Possible Problem Cause Solution Observed Possible Problem Cause Solution Servicing Repair PartsReplacement Parts OFF PE RV20LF35 PE RV20LF90PO 382BINIP PO 385BINIPTSi S Pilot NAT. O.P. Assembly Replacement PartsMF 31621ALMTUB Orifice PO Orifice Orifice Holder PO 54ORFHLD NUT & SleeveSIT Millivolt Replacement Parts for Ember Stove Base ESB ESB Warranty does not Cover Limited Warranty VENT-FREE GAS LOG Heater