Heat & Glo LifeStyle SL-950TV-IPI-E owner manual Mantel and Wall Projections, Combustible Mantels

Page 21

D. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances as specified. Framing or finishing material closer than the minimums listed must be constructed entirely of noncom- bustible materials (i.e., steel studs, concrete board, etc).

Combustible Mantels

 

 

 

 

 

 

 

 

 

 

 

 

CEILING

 

 

 

 

 

12

 

 

 

 

 

 

 

 

 

 

 

 

10

11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

8

9

 

 

 

 

 

 

 

 

 

 

32

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12 13

 

4

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

10 11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

 

 

 

 

 

 

 

 

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOP OF HOOD OR FIREPLACE OPENING

Note: All measurements are in inches.

 

 

 

 

 

 

 

 

 

 

 

1/2 IN.

TOP VIEW

 

 

 

 

 

 

 

 

 

 

 

 

MINIMUM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2-7/8 IN.

 

 

 

 

 

 

 

 

MINIMUM

 

 

 

3 FT.

Note: Clearance from

 

 

 

MAXIMUM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

opening Alcove/Mantel leg.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 5.5 Combustible Mantel Leg or Wall Projections (Acceptable on both sides of opening)

Figure 5.3 Minimum Vertical and Maximum Horizontal Dimensions of Combustibles

 

1/2 in.

3-1/2 in.

SHEETROCK

NON-COMBUSTIBLE

BOARD SHIPPED

WITH APPLIANCE

TOP VIEW

5-3/8 IN.

MINIMUM

Note: Clearance from opening Alcove/Mantel leg.

3 IN.

MINIMUM

UNLIMITED

1/2 in.

Figure 5.6 Clearance to Wall Projection (Acceptable on one side of opening.)

NON-COMBUSTIBLE ZONE

Figure 5.4 Non-Combustible Zone

Heat & Glo • SL-550 / 750 / 950TV-IPI-E2119-900 Rev. J • 12/09

21

Image 21
Contents What to do if you smell gas SL-550TV-IPI-E SL-750TV-IPI-E SL-950TV-IPI-EHomeowner Reference Information CongratulationsUser Guide Table of ContentsAppliance Setup TroubleshootingReference Materials Limited Lifetime Warranty Limited Lifetime Warranty Appliance Certification Listing and Code ApprovalsTempered Glass Specifications BTU SpecificationsNon-Combustible Materials Specification High Altitude InstallationsCombustible Materials Specification Electrical CodesGas Fireplace Safety Operating Instructions User GuideYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Decorative Doors and FrontsFinal inspection by Lighting Instructions IPIAfter Fireplace is Lit Frequently Asked QuestionsMaintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianVenting LogsEither cobrahead or SIT Typical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Negative Pressure Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseCombustible Mantels Mantel and Wall ProjectionsVent Termination Minimum Clearances Termination LocationsVent Information and Diagrams Vent GuidelinesVent System Configuration Pipe Clearances to Combustibles Vent Clearances and FramingWall and Ceiling Penetration Framing Vertical Penetration FramingAppliance Preparation Installing Outside Air Kit Damper Assem- blyGas and Electrical Connections Securing and Leveling the ApplianceAssembly of Vent Sections Installing Vent PipeInstall Attic Insulation Shield Securing Vent SectionsFuel Conversion Gas InformationGas Pressure Gas ConnectionOptional Accessories Requirements Wiring RequirementsElectrical Information Code CSA C22.1Ignition Module 3 VAC Transformer PLUG-IN Wall Switch Installation for Fan Optional Junction Box InstallationFinishing Dimensions of CombustiblesFacing Material Noncombustible Facing DiagramAppliance Setup Install the Log Assembly PIN Hole Install Trim and/or Surround Install the MeshInstall Hood Air Shutter SettingTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Ues to spark, and main Reference Materials Appliance Dimension DiagramService Parts Log Set AssemblyAt Depot Service Parts ListSL-750TV-IPI-E SL-750TV-IPI-E SL-950TV-IPI-E Stocked SL-950TV-IPI-ESL-550 / 750 / 950TV-IPI-E IPI Valve AssemblyContact Information