Heat & Glo LifeStyle SL-750TV-IPI-E Electrical Information, Wiring Requirements, Code CSA C22.1

Page 28

12 Electrical Information

A. Wiring Requirements

NOTICE: This appliance must be electrically wired and grounded in accordance with local codes or, in the absence of local codes, with National Electric Code ANSI/NFPA 70-latest edition or the Canadian Electric

Code CSA C22.1.

Wire the appliance junction box to 110-120 VAC. This is required forr proper operation of the appliance.

A 110-120 VAC circuit for this product must be protected with ground-fault circuit-interrupter protection, in compli- ance with the applicable electrical codes, when it is installed in locations such as in bathrooms or near sinks.

Low voltage and 110 VAC voltage cannot be shared within the same wall box.

WARNING! Risk of Shock or Explosion! DO NOT wire 110V to the valve or to the appliance wall switch. Incorrect wiring will damage controls.

C. Optional Accessories Requirements

This appliance may be used with a wall switch, wall mounted thermostat and/or a remote control.

Wiring for optional Hearth & Home Technologies approved accessories should be done now to avoid reconstruction. Follow instructions that come with those accessories.

D. Electrical Service and Repair

WARNING! Risk of Shock! Label all wires prior to dis- connection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.

WARNING! Risk of Shock! Replace damaged wire with type 105° C rated wire. Wire must have high temperature insulation.

B. Intellifire Ignition System Wiring

Wire the appliance junction box to 110 VAC for proper operation of the appliance.

WARNING! Risk of Shock or Explosion! DO NOT wire IPI controlled appliance junction box to a switched circuit. Incorrect wiring will override IPI safety lockout.

Refer to Figures 12.1 and 12.2, Intellifire Pilot Ignition (IPI) Wiring Diagram.

This appliance is equipped with an Intellifire control valve which operates on a 3 volt system.

Plug the 3-volt AC transformer into the appliance junction box to supply power to the unit OR install two D cell batteries (not included) into the battery pack before use.

NOTICE: Batteries should not be placed in the battery pack while using the transformer. Remove batteries before using the transformer, and unplug the transformer before installing the batteries. Battery polarity must be correct or module damage will occur.

28

Heat & Glo • SL-550 / 750 / 950TV-IPI-E2119-900 Rev. J • 12/09

Image 28
Contents SL-550TV-IPI-E SL-750TV-IPI-E SL-950TV-IPI-E What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideTroubleshooting Appliance SetupReference Materials Limited Lifetime Warranty Limited Lifetime Warranty Listing and Code Approvals Appliance CertificationTempered Glass Specifications BTU SpecificationsHigh Altitude Installations Non-Combustible Materials SpecificationCombustible Materials Specification Electrical CodesOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Decorative Doors and FrontsLighting Instructions IPI Final inspection byFrequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsEither cobrahead or SIT Getting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Negative Pressure Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections Combustible MantelsTermination Locations Vent Termination Minimum ClearancesVent Guidelines Vent Information and DiagramsVent System Configuration Vent Clearances and Framing Pipe Clearances to CombustiblesWall and Ceiling Penetration Framing Vertical Penetration FramingInstalling Outside Air Kit Damper Assem- bly Appliance PreparationGas and Electrical Connections Securing and Leveling the ApplianceInstalling Vent Pipe Assembly of Vent SectionsInstall Attic Insulation Shield Securing Vent SectionsGas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Optional Accessories RequirementsElectrical Information Code CSA C22.1Ignition Module 3 VAC Transformer PLUG-IN Junction Box Installation Wall Switch Installation for Fan OptionalDimensions of Combustibles FinishingNoncombustible Facing Diagram Facing MaterialAppliance Setup Install the Log Assembly PIN Hole Install the Mesh Install Trim and/or SurroundInstall Hood Air Shutter SettingSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Ues to spark, and main Appliance Dimension Diagram Reference MaterialsLog Set Assembly Service PartsService Parts List At DepotSL-750TV-IPI-E SL-750TV-IPI-E SL-950TV-IPI-E SL-950TV-IPI-E StockedIPI Valve Assembly SL-550 / 750 / 950TV-IPI-EContact Information