Heat & Glo LifeStyle SL-750TV-IPI-E, SL-950TV-IPI-E, SL-550TV-IPI-E Install the Log Assembly

Page 34

F. Install the Log Assembly

If the gas logs have been factory installed they should not need to be positioned. If the logs have been packaged separately, refer to the following instructions.

Note: Figure 1 illustrates the recommended gap between the burner and the lava rock retainer.

Carefully remove the logs from the packaging. CAUTION: Logs are fragile!

Log Set Assembly: LOGS-550-E, 750-E, 950-E

Model: SL-550TR-E, 750TR-E, 950TR-E,

SL-550TV-E, SL-750TV-E, SL-950TV-E

3/8 in.

Burner

Lava Rock

retainer

No lava rock may be placed past this edge.

Figure 1

Indentation

1

Slot

Figure 2

Left rear log tab

Indentation

1

Mate slot with tab

Figure 4

Log #1 : Locate the slot on the bottom right side of log 1. Mate the slot with the right rear log tab. Pull the left end of log #1 forward until it touches the left rear log tab.

Left rear log tabRight rear log tab

Shoulder screw

Lava Rock retainer

Grate tine (4)

Figure 3

Log # 2 should touch firebox

2

Figure 5

Mate notch with grate tine

 

Log #2 : Mate the left grate tine with the notch located on the left end of log #2. The right end of log #2 should rest on log #1 as shown. Be sure that the top of log # 2 touches the back of the firebox.

2118-935D 6/07

34

Heat & Glo • SL-550 / 750 / 950TV-IPI-E2119-900 Rev. J • 12/09

Image 34
Contents SL-550TV-IPI-E SL-750TV-IPI-E SL-950TV-IPI-E What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideTroubleshooting Appliance SetupReference Materials Limited Lifetime Warranty Limited Lifetime Warranty Tempered Glass Specifications Listing and Code ApprovalsAppliance Certification BTU SpecificationsCombustible Materials Specification High Altitude InstallationsNon-Combustible Materials Specification Electrical CodesOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Decorative Doors and FrontsLighting Instructions IPI Final inspection byFrequently Asked Questions After Fireplace is LitGlass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlVenting Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsEither cobrahead or SIT Getting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Negative Pressure Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections Combustible MantelsTermination Locations Vent Termination Minimum ClearancesVent Guidelines Vent Information and DiagramsVent System Configuration Wall and Ceiling Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Vertical Penetration FramingGas and Electrical Connections Installing Outside Air Kit Damper Assem- blyAppliance Preparation Securing and Leveling the ApplianceInstall Attic Insulation Shield Installing Vent PipeAssembly of Vent Sections Securing Vent SectionsGas Pressure Gas InformationFuel Conversion Gas ConnectionElectrical Information Wiring RequirementsOptional Accessories Requirements Code CSA C22.1Ignition Module 3 VAC Transformer PLUG-IN Junction Box Installation Wall Switch Installation for Fan OptionalDimensions of Combustibles FinishingNoncombustible Facing Diagram Facing MaterialAppliance Setup Install the Log Assembly PIN Hole Install Hood Install the MeshInstall Trim and/or Surround Air Shutter SettingSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Ues to spark, and main Appliance Dimension Diagram Reference MaterialsLog Set Assembly Service PartsService Parts List At DepotSL-750TV-IPI-E SL-750TV-IPI-E SL-950TV-IPI-E SL-950TV-IPI-E StockedIPI Valve Assembly SL-550 / 750 / 950TV-IPI-EContact Information