3
PIN HOLE
Figure 6
Figure 7
3
Mate shoulder screw with pin hole
Log #3: Locate the pin hole on the underside of log #3. Mate the pin hole with the shoulder screw located on the burner top. Push the left end of log # 3 toward the back of the firebox until it touches the lava rock retainer.
Bump
Swing knot towards log #3
4
Figure 8 | Mate notch with grate tine |
|
Log #4: Locate the notch at the end of log # 4. Mate the notch with the tine as shown above. The top end of log #4 should rest between the end of log #2, and the bump located on log #1. Swing the knot on log # 4 towards log #3.
Figure 10 | Lava Rock |
| |
|
|
Step #6: Apply the supplied lava rock as shown above. Take care to ensure that no lava rock is placed past the line indicated in Figure 1.
Bump
5
Figure 9 | Mate notch with grate tine |
Log #5: Locate the notch at the end of log # 5. Mate the notch with the far right grate tine. The top end of log # 5 should rest on the right side of the “bump” as shown above. You may need to move log #4 slightly.
| |||
| |||
|
|
|
|
Log 1 | |||
|
|
|
|
Log 2 | |||
Log 3 | |||
Log 4 | |||
Log 5 |
Heat & Glo • | 35 |