Heat & Glo LifeStyle 6000 XLT, 8000 DVTFL If Exterior Walls Are Finished With, Termination Caps

Page 28
V=VENT TERMINAL

25

 

 

v

G

 

 

 

 

 

 

 

D

 

A

H

 

 

 

 

 

 

 

E

 

 

 

 

 

v

 

 

 

 

 

L

C

openable

fixed closed

 

 

v B

 

 

v

 

 

 

 

 

v

 

 

 

 

 

 

 

 

 

F v

v

B

M

 

 

I

 

 

B

B

v

X

 

 

 

 

 

J or K

 

 

 

 

 

A

V=VENT TERMINAL

X =AIR SUPPLY INLET 2=AREA WHERE TERMINAL IS NOT PERMITTED

A= 12"clearances above grade, veranda, porch, deck or balcony

B= 12"clearances to window or door that may be opened

C

= 9" (U.S.A.)

clearance to permanently closed window

 

12" (Canada)

 

D= 18"vertical clearance to ventilated soffit located above the terminal within a horizontal distance of 2 feet (60 cm) from the center-line of the terminal

E= 18"clearance to unventilated soffit

F

=

9"

clearance to outside corner

G

=

6"

clearance to inside corner

H

=

3 ft. (Canada)

not to be installed above a gas meter/regulator assembly

 

 

 

within 3 feet (90 cm) horizontally from the center-line of

 

 

 

the regulator

I

=

3 ft. (U.S.A.)

clearance to service regulator vent outlet

 

 

6 ft. (Canada)

 

J

=

9" (U.S.A.)

clearance to non-mechanical air supply inlet to building

 

 

12" (Canada)

or the combustion air inlet to any other appliance

K

=

3 ft. (U.S.A.)

clearance to a mechanical air supply inlet

 

 

6 ft. (Canada)

 

*L

=

7 ft.

clearance above paved sidewalk or a paved driveway

 

 

 

located on public property

**M

=

18"

clearance under veranda, porch, deck or balcony

*a vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings.

**only permitted if veranda, porch, deck or balcony is fully open on a minimum of 2 sides beneath the floor.

NOTE: Local Codes or Regulations may require different clearances.

Figure 25. Vent Termination Minimum Clearances

CAUTION

IF EXTERIOR WALLS ARE FINISHED WITH

 

VINYL SIDING, IT IS NECESSARY TO INSTALL

 

THE VINYL PROTECTOR KIT TO THE TOP OF

 

THE EXTERIOR FIRESTOP (FOR ALL ROUND

 

TERMINATION CAPS).

Image 28
Contents Underwriters Laboratories Listed Installers GuideHeat-N-GloFireplace 8000 DVTFLTHIS UNIT IS NOT FOR USE WITH SOLID FUEL SAFETY AND WARNING INFORMATIONPROHIBITED Table of Contents Approvals and Codes and CodesInstallation Codes High Altitude InstallationsPre-installationPreparation Introducing the Heat-N-Glo Gas FireplacesGetting Started ANY SUCH ACTION MAY POSSIBLY CAUSE A FIRE HAZARDFigure 1. Diagram of 8000DVTFL Page Figure 3. Diagram of SL-42DVT Step Locating the Fireplace Installing the FireplaceClearance Requirements Step Framing the Fireplace VERIFY FRAMING METHODS AND WALLCOVERING DETAILS, BEFORE FRAMING CONSTRUCTION BEGINSStep Installing the Vent System A. Vent System ApprovalsDV-90D DV-45DDV-48D DV-36D DV-12D4-inchinner pipe/6 5/8-inchouter pipe VERTICAL VENTING V FT 40 MAX. 12.4 M Figure 9. Vertical VentingNOTE MODEL 6000 ARCH Model 6000XLT & 8000DVTFL FOR SL-42DVTNOTE: IF A 90 ELBOW IS FIRST ATTACHED TO THE UNIT, THEVENTING WITH TWO 2 90 ELBOWS Figure 11. Venting with two 90 elbowsNOTE MODEL 6000 ARCH H1 V HVENTING WITH TWO 2 90 ELBOWS Figure 12. Venting with two 90 elbowsNOTE: MODEL 6000 ARCH H V1 VFigure 13. Venting with three 90 elbows VENTING WITH THREE 3 90 ELBOWSNOTE: MODEL 6000 ARCH VENTING WITH THREE 3 90 ELBOWS Figure 14. Venting with three 90 elbowsB. Installing Vent Components ENSURE THAT THE FIBERGLASS 3. Install Support Brackets To install support brackets for horizontal runsFigure 17. Adding Venting Components •Place the pipe supports around the vent pipeFigure 18. Installing Support Brackets 4. Install FirestopsFor Horizontal Runs - Firestops are REQUIRED Model DVK-01TRDand SLK-01TRDdo not needFigure 19. Hole and Vent Pipe Figure 21. Hole and New Framing Members Figure 22. Ceiling Firestop Ceiling SideC. Vent Termination Figure 23. Attic FirestopFigure 24. Round and Trapezoid Termination Caps VINYL SIDING, IT IS NECESSARY TO INSTALL IF EXTERIOR WALLS ARE FINISHED WITHTHE VINYL PROTECTOR KIT TO THE TOP OF TERMINATION CAPSMAJOR U.S. BUILDING CODES on the outside of the buildingRoof Pitch Fireplace Step Positioning Leveling, and Securing theStep The Gas Control Systems Step The Gas Supply Line Figure 28. Gas Controls Systems13 mm hook-upat the unit DO NOT USE AN OPEN FLAME TO CHECK FOR GAS LEAKSStep Gas Pressure Requirements Figure 29. Gas Supply LinePressure Natural GasStep Wiring the Fireplace For Standing Pilot Ignition WiringElectrical wiring must be installed by a licensed LABEL ALL WIRES PRIOR TO DISCONNECTIONWHEN SERVICING CONTROLS. WIRING ERRORS CAN CAUSE IMPROPER ANDStep Finishing Step Installing Trim Logs, and Ember Material Hearth ExtensionsSave the log instructions with this manual Positioning the LogsPlacing the Ember Material Figure 36. Placement of the Ember Material Figure 35. Glass Assembly1.Lift the trim door up and out of the unit Lighting the Fireplace After the Installation Step Before Lighting the Fireplace StepReview safety warnings and cautions Double-checkfor faulty componentsFireplace Maintenance Maintaining and Servicing Your FireplaceTURN OFF THE GAS BEFORE SERVICING YOUR FIREPLACEFigure 37. Burner Flame Patterns Figure 38. Pilot/Ignitor Flame PatternsReplacement Parts and Accessories Standing Pilot OnlyPART PART DESCRIPTIONDSI Ignition Only 8000DVTFL, 6000DVTFL, 6000ARCH, SL-42DVTPART PART DESCRIPTIONBoth Standing Pilot and DSI Ignition Accessories Both Standing Pilot and DSI Ignition ContACCESSORY PART