Heat & Glo LifeStyle SL-42 DVT manual Step Installing the Vent System, A. Vent System Approvals

Page 11
Step 3

Step 3

Installing the

Vent System

A. Vent System Approvals

Models 8000DVTFL, 6000DVTFL, 6000XLT, and 6000ARCH are approved to use D-series direct vent pipe components and terminations. Model SL- 42DVT is approved to us SL-D-series components and terminations. Approved vent system components are labeled for identification. NO OTHER VENTING SYSTEMS OR COMPONENTS MAY BE USED. Detailed installation instructions are included with each vent termination kit and should be used in conjunction with this Installers Guide. The drawing below shows vent system components and terminations.

Identifying Vent Components

The vent systems installed on this gas fireplace may include one, two, or three 90° elbow assemblies. The relationships of vertical rise to horizontal run in vent configurations using 90° elbows MUST BE strictly adhered to. The rise to run relationships are shown in the venting drawings and tables. Refer to the diagrams on the next several pages.

Vent system

 

 

Vent system components

 

 

 

 

termination kits

 

VERTICAL

 

 

 

TERMINATION

 

STORM COLLAR

 

 

 

 

 

 

D-SERIES

 

 

ROOF FLASHING

 

 

 

 

 

 

 

 

HORIZONTAL

 

HORIZONTAL PIPE

 

 

 

TERMINATION

 

 

 

 

 

SUPPORT

 

 

 

 

 

DVK-01D

DVK-TVCD

 

 

 

 

 

 

 

DVK-02D

 

 

 

 

 

 

 

 

 

PIPE LENGTH

 

 

 

WALL FIRESTOP

 

 

 

 

DVK-01TRD

 

CEILING

WALL BRACKET

 

 

90 DEGREE

FIRESTOP

DVK-01SD

DVK-02TRD

 

 

 

DVK-02SD

 

ELBOW

 

 

SL-D-SERIES

 

 

 

SLK-01D

SLK-TVCD

 

 

 

SLK-991D

 

 

 

 

 

 

 

 

 

SLK-01TRD

 

 

 

 

Figure 6.

Vent Components and Terminations

 

 

8

Image 11
Contents 8000 DVTFL Underwriters Laboratories ListedInstallers Guide Heat-N-GloFireplacePROHIBITED SAFETY AND WARNING INFORMATIONTHIS UNIT IS NOT FOR USE WITH SOLID FUEL Table of Contents High Altitude Installations Approvals and Codesand Codes Installation CodesANY SUCH ACTION MAY POSSIBLY CAUSE A FIRE HAZARD Pre-installationPreparationIntroducing the Heat-N-Glo Gas Fireplaces Getting StartedFigure 1. Diagram of 8000DVTFL Page Figure 3. Diagram of SL-42DVT Clearance Requirements Installing the FireplaceStep Locating the Fireplace CONSTRUCTION BEGINS Step Framing the FireplaceVERIFY FRAMING METHODS AND WALL COVERING DETAILS, BEFORE FRAMINGA. Vent System Approvals Step Installing the Vent SystemDV-12D DV-90DDV-45D DV-48D DV-36D4-inchinner pipe/6 5/8-inchouter pipe NOTE MODEL 6000 ARCH Figure 9. Vertical VentingVERTICAL VENTING V FT 40 MAX. 12.4 M ATTACHED TO THE UNIT, THE Model 6000XLT & 8000DVTFLFOR SL-42DVT NOTE: IF A 90 ELBOW IS FIRSTH1 V H VENTING WITH TWO 2 90 ELBOWSFigure 11. Venting with two 90 elbows NOTE MODEL 6000 ARCHH V1 V VENTING WITH TWO 2 90 ELBOWSFigure 12. Venting with two 90 elbows NOTE: MODEL 6000 ARCHNOTE: MODEL 6000 ARCH VENTING WITH THREE 3 90 ELBOWSFigure 13. Venting with three 90 elbows Figure 14. Venting with three 90 elbows VENTING WITH THREE 3 90 ELBOWSB. Installing Vent Components ENSURE THAT THE FIBERGLASS •Place the pipe supports around the vent pipe 3. Install Support BracketsTo install support brackets for horizontal runs Figure 17. Adding Venting ComponentsModel DVK-01TRDand SLK-01TRDdo not need Figure 18. Installing Support Brackets4. Install Firestops For Horizontal Runs - Firestops are REQUIREDFigure 19. Hole and Vent Pipe Figure 22. Ceiling Firestop Ceiling Side Figure 21. Hole and New Framing MembersFigure 23. Attic Firestop C. Vent TerminationFigure 24. Round and Trapezoid Termination Caps TERMINATION CAPS VINYL SIDING, IT IS NECESSARY TO INSTALLIF EXTERIOR WALLS ARE FINISHED WITH THE VINYL PROTECTOR KIT TO THE TOP OFon the outside of the building MAJOR U.S. BUILDING CODESRoof Pitch Step The Gas Control Systems Step Positioning Leveling, and Securing theFireplace DO NOT USE AN OPEN FLAME TO CHECK FOR GAS LEAKS Step The Gas Supply LineFigure 28. Gas Controls Systems 13 mm hook-upat the unitNatural Gas Step Gas Pressure RequirementsFigure 29. Gas Supply Line PressureFor Standing Pilot Ignition Wiring Step Wiring the FireplaceERRORS CAN CAUSE IMPROPER AND Electrical wiring must be installed by a licensedLABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING CONTROLS. WIRINGStep Finishing Hearth Extensions Step Installing Trim Logs, and Ember MaterialPlacing the Ember Material Positioning the LogsSave the log instructions with this manual 1.Lift the trim door up and out of the unit Figure 35. Glass AssemblyFigure 36. Placement of the Ember Material Double-checkfor faulty components Lighting the Fireplace After the InstallationStep Before Lighting the Fireplace Step Review safety warnings and cautionsYOUR FIREPLACE Fireplace MaintenanceMaintaining and Servicing Your Fireplace TURN OFF THE GAS BEFORE SERVICINGFigure 38. Pilot/Ignitor Flame Patterns Figure 37. Burner Flame PatternsPART DESCRIPTION Replacement Parts and AccessoriesStanding Pilot Only PARTPART DESCRIPTION DSI Ignition Only8000DVTFL, 6000DVTFL, 6000ARCH, SL-42DVT PARTBoth Standing Pilot and DSI Ignition PART AccessoriesBoth Standing Pilot and DSI Ignition Cont ACCESSORY