Heat & Glo LifeStyle 6000 DVTFL manual Major U.S. Building Codes, on the outside of the building

Page 29
MAJOR U.S. BUILDING CODES

For Vertical Terminations - To locate the vent and install the vent sections:

• Locate and mark the vent centerpoint on the underside of the roof, and drive a nail through the centerpoint.

• Make the outline of the roof hole around the centerpoint nail.

• The size of the roof hole framing dimensions depend on the pitch of the roof. There MUST BE a 1-inch (25.4 mm) clearance from the vertical vent pipe to combustible materials.

• Mark the roof hole accordingly.

• Cover the opening of the installed vent pipes.

• Cut and frame the roof hole.

• Use framing lumber the same size as the roof rafters and install the frame securely. Flashing anchored to the frame must withstand heavy winds.

• Continue to install concentric vent sections up through the roof hole (for inside vent installations) or up past the roof line until you reach the appropriate distance above the roof (for outside terminations).

 

WARNING

 

MAJOR U.S. BUILDING CODES

 

SPECIFY MINIMUM CHIMNEY AND/OR

 

VENT HEIGHT ABOVE THE ROOF TOP.

 

THESE MINIMUM HEIGHTS ARE

 

NECESSARY IN THE INTEREST OF

 

SAFETY. SEE THE FOLLOWING

 

DIAGRAM FOR MINIMUM HEIGHTS,

 

PROVIDED THE TERMINATION CAP IS

 

AT LEAST EIGHT (2) FEET FROM A

 

VERTICAL WALL AND 2-FEET BELOW

 

A HORIZONTAL OVERHANG.

NOTE

 

This also pertains to vertical vent systems installed

 

on the outside of the building.

26

Image 29
Contents Installers Guide Underwriters Laboratories ListedHeat-N-GloFireplace 8000 DVTFLPROHIBITED SAFETY AND WARNING INFORMATIONTHIS UNIT IS NOT FOR USE WITH SOLID FUEL Table of Contents and Codes Approvals and CodesInstallation Codes High Altitude InstallationsIntroducing the Heat-N-Glo Gas Fireplaces Pre-installationPreparationGetting Started ANY SUCH ACTION MAY POSSIBLY CAUSE A FIRE HAZARDFigure 1. Diagram of 8000DVTFL Page Figure 3. Diagram of SL-42DVT Clearance Requirements Installing the FireplaceStep Locating the Fireplace VERIFY FRAMING METHODS AND WALL Step Framing the FireplaceCOVERING DETAILS, BEFORE FRAMING CONSTRUCTION BEGINSA. Vent System Approvals Step Installing the Vent SystemDV-45D DV-90DDV-48D DV-36D DV-12D4-inchinner pipe/6 5/8-inchouter pipe NOTE MODEL 6000 ARCH Figure 9. Vertical VentingVERTICAL VENTING V FT 40 MAX. 12.4 M FOR SL-42DVT Model 6000XLT & 8000DVTFLNOTE: IF A 90 ELBOW IS FIRST ATTACHED TO THE UNIT, THEFigure 11. Venting with two 90 elbows VENTING WITH TWO 2 90 ELBOWSNOTE MODEL 6000 ARCH H1 V HFigure 12. Venting with two 90 elbows VENTING WITH TWO 2 90 ELBOWSNOTE: MODEL 6000 ARCH H V1 VNOTE: MODEL 6000 ARCH VENTING WITH THREE 3 90 ELBOWSFigure 13. Venting with three 90 elbows Figure 14. Venting with three 90 elbows VENTING WITH THREE 3 90 ELBOWSB. Installing Vent Components ENSURE THAT THE FIBERGLASS To install support brackets for horizontal runs 3. Install Support BracketsFigure 17. Adding Venting Components •Place the pipe supports around the vent pipe4. Install Firestops Figure 18. Installing Support BracketsFor Horizontal Runs - Firestops are REQUIRED Model DVK-01TRDand SLK-01TRDdo not needFigure 19. Hole and Vent Pipe Figure 22. Ceiling Firestop Ceiling Side Figure 21. Hole and New Framing MembersFigure 23. Attic Firestop C. Vent TerminationFigure 24. Round and Trapezoid Termination Caps IF EXTERIOR WALLS ARE FINISHED WITH VINYL SIDING, IT IS NECESSARY TO INSTALLTHE VINYL PROTECTOR KIT TO THE TOP OF TERMINATION CAPSon the outside of the building MAJOR U.S. BUILDING CODESRoof Pitch Step The Gas Control Systems Step Positioning Leveling, and Securing theFireplace Figure 28. Gas Controls Systems Step The Gas Supply Line13 mm hook-upat the unit DO NOT USE AN OPEN FLAME TO CHECK FOR GAS LEAKSFigure 29. Gas Supply Line Step Gas Pressure RequirementsPressure Natural GasFor Standing Pilot Ignition Wiring Step Wiring the FireplaceLABEL ALL WIRES PRIOR TO DISCONNECTION Electrical wiring must be installed by a licensedWHEN SERVICING CONTROLS. WIRING ERRORS CAN CAUSE IMPROPER ANDStep Finishing Hearth Extensions Step Installing Trim Logs, and Ember MaterialPlacing the Ember Material Positioning the LogsSave the log instructions with this manual 1.Lift the trim door up and out of the unit Figure 35. Glass AssemblyFigure 36. Placement of the Ember Material Step Before Lighting the Fireplace Step Lighting the Fireplace After the InstallationReview safety warnings and cautions Double-checkfor faulty componentsMaintaining and Servicing Your Fireplace Fireplace MaintenanceTURN OFF THE GAS BEFORE SERVICING YOUR FIREPLACEFigure 38. Pilot/Ignitor Flame Patterns Figure 37. Burner Flame PatternsStanding Pilot Only Replacement Parts and AccessoriesPART PART DESCRIPTION8000DVTFL, 6000DVTFL, 6000ARCH, SL-42DVT DSI Ignition OnlyPART PART DESCRIPTIONBoth Standing Pilot and DSI Ignition Both Standing Pilot and DSI Ignition Cont AccessoriesACCESSORY PART