Desa TPNA-A(-HA) Cathedral Ceiling Installation, Cathedral Ceiling Support Box Installation

Page 17

Venting Installation

Instructions

Continued

5.Place the flashing over the pipe section(s) extending through the roof. Apply a bead of silicone or roof sealer to the bottom flange of flashing and secure the base of the flashing to the roof and framing with roofing nails. Be sure roofing material overlaps the top edge of the flashing as shown in Figure 24, page 15.

There must be a 1" clearance from the vent pipe to combustible materials.

6.Continue to add pipe sections until the height of the vent cap meets the minimum building code requirements described in Figure 14, page 10. Note: You must increase vent height for steep roof pitches. Nearby trees, adjoining rooflines, steep pitched roofs, and other simi- lar factors may cause poor draft or down-draft condition (see Figure 24, page 15). Increasing the vent height may solve this problem.

7.Apply a bead of sealer to the upper edge of flashing collar. Slide storm collar over pipe and down to top edge of flashing. Apply a second bead of silicone or roof sealer around remaining seam of storm collar. Twist-lock vent cap onto last section of vent pipe and seal with high temperature silicone sealant as specified in the second warning statement on page 11. Finish sealing flange around roofing material with roofing sealer.

Note: If the vent pipe passes through any occupied areas above the first floor, including storage spaces and closets, you must enclose pipe. You may frame and sheetrock the enclosure with standard construc- tion material. Make sure and meet the minimum allowable clearances to combustibles. Do not fill any of the required air spaces with insulation.

Cathedral Ceiling Installation

1. Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Mark the outline of the cathedral ceiling support box on the roof sheathing using the locating hole as a center point.

2. Cut the hole 1/8" larger than the support box outline (see Figure 27).

3. Lower the support box through the hole in the roof until the bottom of the box extends at least 2" below the ceiling (see Figure 27). Align the sup- port box vertically and horizontally using a level. Temporarily tack the support box in place through the inside walls and into the roof sheathing.

4. Using tin snips, cut the support box from the top corners down to the roofline and fold the resulting flaps over the roof sheathing (see Figure 28). Apply a bead of non-hardening mastic around the top edges of the support box to make a seal between the box and the roof. Nail in place with roofing nails. Remove any combustible material that might be inside of the support box.

5. Complete the cathedral ceiling installation by following the same procedures outlined in steps 2 through 7 for Flat Ceiling Installation, page 16.

Level

Cathedral ceiling support box

2" minimum below finished ceiling

Cut hole 1/8" larger than support box when projected onto roofline

Figure 27 - Cathedral Ceiling Support

Box Installation

Non-hardening Mastic under all edges of support box before nailing

Figure 28 - Installed Cathedral Ceiling

Support Box

56131-F

www.desatech.com

17

Image 17
Contents Peninsula Model Shown Peninsula Models VDVF36Safety Information Table of ContentsSafety Information High traffic areas Right Side Front View DimensionsLocation and space requirements Pre-Installation PreparationClearances Mantel ClearancesFraming Rough Opening for Installing Vent Termination Clearances General VentingMinimum Clearances for Vent Terminations Installation Planning Venting Installation InstructionsInstallation Precautions Installing Vent System in a Chase Installation for horizontal terminationSnorkel 90º Minimum 12 Minimum 45º SnorkelVent Cap Wood Screw Male Slots Female Locking Lugs Rigid Vent PipeConnecting Vent Cap with Horizontal Vent Pipe Horizontal Venting Installation for vertical TerminationVenting with Two 90 Elbows Lowest Listed Discharge Vent Cap Opening Minimum Gas Flat Ceiling InstallationClearance Min. Height from RoofCathedral Ceiling Support Box Installation Cathedral Ceiling InstallationMin Max 20 max Starter Elbow Vertical V Horizontal H 1 +Venting with One 90 Elbow Vertical V Horizontal H Min Max 20 max Starter ElbowParts list for Desa venting kits and components High altitude installationVertical Venting Desa 5/8 Pipe & Vent Kits Number DescriptionScrews Dura Vent 5/8 Pipe & Vent Kits Number Description01492 Electrical Hookup for optional blower accessory InstallationWall Switch Installation For Optional Fan Kit From Blower Assembly Optional Wireless hand-held Remote Control InstallationRed White To ThermopoileGAS Line HOOK-UP Installing Log Set Gas Supply TestingLeft Back Front Right Open CloseBurner Flame Adjustment Pilot/Electrode Assembly AdjustmentDecorative Facing Burner RemovalLouver Assembly Operating Guidlines Maintenance InstructionsGlass Door Hearth Pan LogsFor Your Safety Read Before Lighting Cleaning and Replacing Glass DoorGlass Assembly Frame Retainer Screws Louver Assembly Operating FireplaceLighting Instructions Position Indicator Flame Adjustment KnobTo Turn OFF GAS To Appliance Gas Control KnobService Hints SpecificationsTechnical Service Parts Under WarrantyParts Not Under Warranty TroubleshootingProblem Possible Cause Remedy Millivolt systemElectronic ignition system TroubleshootingGAS Valve Wiring DiagramsReceiver and HAND-HELD Pilot AssemblySkytech Remote Control KIT High Voltage Cable Replacement Parts AccessoriesLimited Warranty DIRECT-VENT Fireplace Warranty InformationKeep this Warranty