Desa TPNEA-A, (V)DVF36, TSTPA-A, TSTEA-A, TSTPEA-A, TPNPEA-A, TPNPA-A, TSTA-A(-HA) GAS Line HOOK-UP

Page 23

Installation

Continued

 

 

 

 

Optional Fan

Outlet Box

Extension

Kit Plug

Gas

Cord

 

 

Receiver

 

 

 

 

 

 

 

 

 

Valve

 

 

 

 

 

 

 

 

 

 

ILOT

 

 

 

 

 

 

P

 

 

 

O

N

 

16AI

 

 

 

 

 

 

 

 

T

 

 

 

 

 

 

O

 

 

7

TH

 

 

L

 

 

 

 

I

 

 

 

 

 

 

P

 

 

 

 

 

 

FFO

L

I

TP

 

 

 

 

O

White

 

 

 

H

 

 

E

 

A

 

TPTH

Red

To Thermopoile

Figure 40 - Installing Remote Receiver

(SKYTECH Model)

Battery

Cover

12Volt Battery

Pull to Remove

Insulation Tab

IMPORTANT: The appliance and its individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig. (3.5 kPa). The appliance must be isolated from the gas supply piping system by closing its individual equipment shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 psig. (3.5 kPa).

CAUTION: Do not kink flex- ible gas line.

CAUTION: Compounds used on threaded joints of gas piping shall be resistant to the action of Liquefied Petroleum (LP or propane), and should be applied lightly to ensure excess sealant does not enter the gas line.

1.Install a sediment trap between the incoming gas line and the gas control valve (see Figure 43). The sediment trap should extend down the center of the pipe. Refer to your local codes.

Figure 41 - Installing Battery in Hand-

Held Remote Control Unit (SKYTECH)

GAS LINE HOOK-UP

WARNING: Before you pro- ceed, make sure your gas supply is OFF.

Key

Shutoff Valve

Extension

WARNING: Gas line hookup should be done by your gas supplier or a qualified service person.

An equipment shutoff valve has been included in the appliance’s gas supply system. You may con- sider installing an extra gas shutoff valve outside the appliance’s enclosure (check with local codes) where it can be accessed more conveniently with a key through a wall as shown in Figure 42.

Route a 1/2" NPT black iron gas line towards the appliance coming in from the left. It is recom- mended to route the pipe between the stand of the firebox and the surround of the fireplace (see Figure 43).

Figure 42 - Typical Exterior Wall Gas

Shutoff Installation

Incoming 1/2" Gas

Line Permitted by

Local Codes

Sediment

 

all

Trap (Not

 

 

W

Supplied)

Side

 

Appliance

3" Min.

Of

 

Figure 43 - Sediment Trap

56131-F

www.desatech.com

23

Image 23
Contents Peninsula Model Shown Peninsula Models VDVF36Safety Information Table of ContentsSafety Information High traffic areas Right Side Front View DimensionsMantel Clearances Pre-Installation PreparationLocation and space requirements ClearancesFraming Rough Opening for Installing Vent Termination Clearances General VentingMinimum Clearances for Vent Terminations Installation Planning Venting Installation InstructionsInstallation Precautions Snorkel Installation for horizontal terminationInstalling Vent System in a Chase Snorkel 90º Minimum 12 Minimum 45ºVent Cap Wood Screw Male Slots Female Locking Lugs Rigid Vent PipeConnecting Vent Cap with Horizontal Vent Pipe Horizontal Venting Installation for vertical TerminationVenting with Two 90 Elbows Min. Height from Roof Flat Ceiling InstallationLowest Listed Discharge Vent Cap Opening Minimum Gas ClearanceCathedral Ceiling Support Box Installation Cathedral Ceiling InstallationVertical V Horizontal H Min Max 20 max Starter Elbow Vertical V Horizontal H 1 +Min Max 20 max Starter Elbow Venting with One 90 ElbowDesa 5/8 Pipe & Vent Kits Number Description High altitude installationParts list for Desa venting kits and components Vertical VentingScrews Dura Vent 5/8 Pipe & Vent Kits Number Description01492 Electrical Hookup for optional blower accessory InstallationWall Switch Installation To Thermopoile Optional Wireless hand-held Remote Control InstallationFor Optional Fan Kit From Blower Assembly Red WhiteGAS Line HOOK-UP Installing Log Set Gas Supply TestingLeft Back Front Right Open CloseBurner Removal Pilot/Electrode Assembly AdjustmentBurner Flame Adjustment Decorative FacingLogs Operating Guidlines Maintenance InstructionsLouver Assembly Glass Door Hearth PanOperating Fireplace Cleaning and Replacing Glass DoorFor Your Safety Read Before Lighting Glass Assembly Frame Retainer Screws Louver AssemblyGas Control Knob Position Indicator Flame Adjustment KnobLighting Instructions To Turn OFF GAS To ApplianceParts Under Warranty SpecificationsService Hints Technical ServiceMillivolt system TroubleshootingParts Not Under Warranty Problem Possible Cause RemedyElectronic ignition system TroubleshootingGAS Valve Wiring DiagramsReceiver and HAND-HELD Pilot AssemblySkytech Remote Control KIT High Voltage Cable Replacement Parts AccessoriesLimited Warranty DIRECT-VENT Fireplace Warranty InformationKeep this Warranty