Desa TSTPA-A, TSTEA-A High altitude installation, Parts list for Desa venting kits and components

Page 19

Venting Installation

Instructions

45° Starter Elbow

Continued

12" Extension

Vertical Venting

V = 40' max.

45° Starter

Elbow

Note: Install restrictor into inner collar of fireplace as shown.

Figure 32 - Vertical Rigid Venting

Configuration With No Horizontal Run

High altitude installation

Your DESA direct-vent fireplace has been tested and approved for elevations from 0-2,000 feet (USA) and elevations from 0-4,500 feet (Canada)

Fireplaces for High Altitude (models ending in -HA) are for installation above 4,000 feet only. These fireplaces are equipped with parts specific for higher altitudes. IMPORTANT: These fire- places can NOT be converted to propane/LP gas. When installing a non-high altitude fireplace at an elevation above 2,000 feet (USA), you may need to decrease the input rating by changing the existing burner orifice to a smaller size. Reduce input 4% for each 1,000 feet above sea level. Check with your local gas company for proper orifice size identification.

When installing this fireplace at an elevation above 4,500 feet (Canada), check with local authorities.

IMPORTANT: For horizontal installations above 2,000 feet, it is recommened that a 12" extension pipe be added before starter elbow (see Figure 33).

Figure 33 - Recommended 12" Extension

for High Altitude Installation

parts list for DESA venting kits and components

DESA (5"/8") Pipe & Vent Kits

Number Description

VKR-58 Roof Vent Kit, Galvanized

(Includes: 45° Elbow, 7"-12"

Adjustable Pipe, Flue Restrictor,

Vertical High Wind Termination,

2' Pipe, 4' Pipe, Wall Firestop,

Storm Collar, Roof Flashing

[0/12 - 6/12], 26 Screws)

VKB-58 Basement Vent Kit, Galvanized

(Includes: 45° Elbow, 7"-12"

Adjustable Pipe, Wall Firestop,

Horizontal Square Termination,

4' Pipe, 90° Elbow, 20 Screws)

VKS-58 Snorkel Vent Kit, Galvanized

(Includes: 45° Elbow, 7"-12"

Adjustable Pipe, Wall Firestop,

36" Snorkel Termination, 4' Pipe,

1' Pipe, 90° Elbow, 26 Screws)

VKG-58 Ground Floor Vent Kit, Galvanized

(Includes: 45° Elbow, 7"-12"

Adjustable Pipe, Wall Firestop,

Horizontal Square Termination,

16 Screws)

P58-48 48" Section Double Wall Pipe,

Galvanized

P58-36 36" Section Double Wall Pipe,

Galvanized

P58-24 24" Section Double Wall Pipe,

Galvanized

P58-12 12" Section Double Wall Pipe,

Galvanized

P58-6 6" Section Double Wall Pipe,

Galvanized

56131-F

www.desatech.com

19

Image 19
Contents Peninsula Model Shown Peninsula Models VDVF36Safety Information Table of ContentsSafety Information High traffic areas Right Side Front View DimensionsMantel Clearances Pre-Installation PreparationLocation and space requirements ClearancesFraming Rough Opening for Installing Vent Termination Clearances General VentingMinimum Clearances for Vent Terminations Installation Precautions Venting Installation InstructionsInstallation Planning Snorkel Installation for horizontal terminationInstalling Vent System in a Chase Snorkel 90º Minimum 12 Minimum 45ºVent Cap Wood Screw Male Slots Female Locking Lugs Rigid Vent PipeConnecting Vent Cap with Horizontal Vent Pipe Venting with Two 90 Elbows Installation for vertical TerminationHorizontal Venting Min. Height from Roof Flat Ceiling InstallationLowest Listed Discharge Vent Cap Opening Minimum Gas ClearanceCathedral Ceiling Support Box Installation Cathedral Ceiling InstallationVertical V Horizontal H Min Max 20 max Starter Elbow Vertical V Horizontal H 1 +Min Max 20 max Starter Elbow Venting with One 90 ElbowDesa 5/8 Pipe & Vent Kits Number Description High altitude installationParts list for Desa venting kits and components Vertical Venting01492 Dura Vent 5/8 Pipe & Vent Kits Number DescriptionScrews Wall Switch Installation InstallationElectrical Hookup for optional blower accessory To Thermopoile Optional Wireless hand-held Remote Control InstallationFor Optional Fan Kit From Blower Assembly Red WhiteGAS Line HOOK-UP Installing Log Set Gas Supply TestingLeft Back Front Right Open CloseBurner Removal Pilot/Electrode Assembly AdjustmentBurner Flame Adjustment Decorative FacingLogs Operating Guidlines Maintenance InstructionsLouver Assembly Glass Door Hearth PanOperating Fireplace Cleaning and Replacing Glass DoorFor Your Safety Read Before Lighting Glass Assembly Frame Retainer Screws Louver AssemblyGas Control Knob Position Indicator Flame Adjustment KnobLighting Instructions To Turn OFF GAS To ApplianceParts Under Warranty SpecificationsService Hints Technical ServiceMillivolt system TroubleshootingParts Not Under Warranty Problem Possible Cause RemedyElectronic ignition system TroubleshootingGAS Valve Wiring DiagramsSkytech Remote Control KIT Pilot AssemblyReceiver and HAND-HELD High Voltage Cable Replacement Parts AccessoriesKeep this Warranty Warranty InformationLimited Warranty DIRECT-VENT Fireplace