Continental BCDV42N, BCDV42P Installation Wall And Ceiling Protection, Horizontal Installation

Page 13
INSTALLATION
FIGURE 17

13

INSTALLATION

WALL AND CEILING PROTECTION

FOR SAFE AND PROPER OPERATION OF THE FIREPLACE, FOLLOW THE VENTING INSTRUCTIONS EXACTLY.

NOTE: Only a clearance to combustibles of 1" all around the vent pipe is required.

HORIZONTAL INSTALLATION

This application occurs when vent- ing through an exterior wall. Having determined the air terminal loca- tion, cut and frame a hole in an ex- terior wall with a minimum open- ing as required. See Note above. HORIZONTAL INSTALLATIONVERTICAL INSTALLATION (As an alternative to framing, a vent Manual backgroundManual background pipe shield may be installed, en- suring a 1" clearance toManual background combustibles. See Figure 16.) FIGURE 14

1.Mark and cut the vent pipe shield to the determined depth of the combustible wall. Apply a bead of caulking (not supplied) to the framework or to the shield plate (in the case of a finished wall) and secure the shield through the opening to the interior wall. The final location of the vent pipe shield should maintain the required clearance to the 8" vent pipe / liner. (See note above). Do not fill this cavity with any type of material. Apply a bead of caulking all around and place a firestop spacer over the vent shield to restrict cold air from being drawn into the room or around the fire- place. Ensure that both spacer and shield maintain the required clearance to combustibles. Once the vent pipe / liner is installed in its final position, apply sealant between the pipe / liner and the firestop spacer.

OR

FIGURE 15

VERTICAL INSTALLATION

FIGURE 16

This application occurs when venting through a roof. Installation kits for various roof pitches are available from your Con- tinental dealer. See Ac- cessories to order the specific kit required.

1.Determine the air terminal location, cut and frame 10 inch openings in the ceiling and the roof to provide the minimum 1 inch clearance between the fireplace pipe / liner and any combustible material. Try to center the ex- haust pipe location midway between two joist to prevent having to cut them. Use a plumb bob to line up the center of the openings. DO NOT FILL THIS SPACE WITH ANY TYPE OF MATERIAL. A vent pipe shield will prevent any materials such as insulation, from filling up the 1" air space around the pipe. Nail head-

ers between the joist for extra support.

2. Apply a bead of caulking (not sup- plied) to the frame- work or to the Wolf Steel vent pipe shield

plate or equivalent (in the case of a finished ceiling), and secure over the opening in the ceiling. FIGURE 18. A firestop must be placed on the bottom of each framed opening in a roof or ceiling that the venting system passes through. Ap- ply a bead of caulking all around and place a firestop spacer over the vent shield to restrict cold air from being drawn into the room or around the fireplace. Ensure that both spacer and shield maintain the required clearance to combustibles. Once the vent pipe / liner is installed in its final position, apply sealant between the pipe / liner and the firestop spacer.

W415-0385 / A / 10.02.03

Image 13
Contents DIRECT VENT MILLIVOLT SYSTEM PLEASE RETAIN THIS MANUAL FOR FUTURE REFERENCE TABLE of CONTENTS13 - 18 INSTALLATION 21 OPTIONAL BLOWER INSTALLATIONAny labour related to warranty repair is not covered CONTINENTAL GAS FIREPLACE PRESIDENTS LIFETIME LIMITED WARRANTYISO 9001 2000 Quality Assurance Certificate CONDITIONS AND LIMITATIONSGENERAL INFORMATION GENERAL INSTRUCTIONSCARE OF GLASS, AND PLATED PARTS VENTING LENGTHS VENTINGINSTALLATIONS AIR TERMINAL INSTALLATIONSA B C D E F G H I J K L M N O CANADIAN 12 INCHES 12 INCHES 12 INCHES 32 INCHES 32 INCHES 0 INCHESSPECIAL VENT INSTALLATIONS TYPICAL VENT INSTALLATIONSPERISCOPE TERMINATION FIGURES 3 a-cHORIZONTAL TERMINATION VENTING APPLICATION FLOW CHARTVERTICAL TERMINATION DEFINITIONS HORIZONTAL TERMINATIONELBOW VENT LENGTH VALUES Formula 1 HT VT Formula 2 HT + VT 40 feet ExampleFormula 1 HT 4.2 VT ExampleFormula 2 HT + VT 24.75 feet Formula 1 HT 4.2 VT Formula 2 HT + VT 24.75 feetFormula 1 HT VT Formula 2 HT + VT 40 feet VERTICAL TERMINATIONFIGURE10 REQUIRED VERTICAL RISE IN FEET VT Formula 1 HT 3VT Formula 2 HT + VT 40 feet ExampleHORIZONTAL VENT RUN PLUS OFFSET IN FEET HT HORIZONTAL INSTALLATION INSTALLATION WALL AND CEILING PROTECTIONVERTICAL INSTALLATION HORIZONTAL AIR TERMINAL INSTALLATION USING FLEXIBLE VENT COMPONENTSVERTICAL AIR TERMINAL INSTALLATION Use only approved aluminum flexible liner kits markedEXTENDED HORIZONTAL AIR TERMINAL INSTALLATION USING RIGID VENT COMPONENTSFIREPLACE VENT CONNECTION GAS INSTALLATION VERTICAL VENTING INSTALLATIONProceed once the vent installation is complete 1. Move the fireplace into position and secure using theFRAMING MOBILE HOME INSTALLATIONFIGURES MANTLE INSTALLATION NAILING TAB INSTALLATIONAdditional set screws may be installed NAILINGL42 LOUVRE INSTALLATION FINISHINGLOGO PLACEMENT PORCELAIN REFLECTIVE PANELSLOG PLACEMENT #2#3CHARCOAL EMBERS VERMICULITEB AC OPTIONAL BLOWER INSTALLATIONGD36 THERMOSTATIC SENSOR CONTROL OPTIONAL FAN INSTALLATIONTo safely install the fan, turn off the electricity first MAINTENANCE OPERATION / MAINTENANCEFOR YOUR SAFETY READ BEFORE LIGHTING Turn off the gas and electrical power before servicing the fireplacePILOT BURNER ADJUSTMENT ADJUSTMENTSVENTURI ADJUSTMENT Air shutter adjustment must only be done by a qualified installerACCESSORIES REPLACEMENTSREPLACEMENT PARTS GD420 5 FTW415-0385 / A SYMPTOM TROUBLE SHOOTING GUIDEPROBLEM TEST SOLUTIONTOLI