Enviro Meridian owner manual Elbow with a rodent screen may be used

Page 20

Installation

VERTICAL RISE WITH HORIZONTAL TERMINATION INSTALLATION (RECOMMENDED) - FREESTANDING:

A 45° elbow with a rodent screen may be used in place of the termination cap (or stainless steel termination hood).

Termination cap

 

90°elbow

 

Wall framing

 

Vertical section of vent pipe

 

Horizontal frame

Wall strap

 

for thimble

 

 

Clean

 

out tee

 

Wall

 

thimble

ENVIRO Meridian

 

Figure 25: Through Wall with Horizontal Termination.

THROUGH CONCRETE WALL WITH VERTICAL RISE INSTALLATIONS - FREESTANDING:

 

A 45° elbow with a rodent screen may be used

Horizontal frame

 

in place of the termination cap (or stainless

 

for thimble

Termination cap

steel termination hood).

Wall thimble

 

 

 

This is the recommended installation to use if

90°elbow

 

 

 

there is a concrete or retaining wall in line with

Wall framing

 

exhaust vent on pellet stove.

 

 

 

 

Vertical section

 

The termination must be 12 inches (30 cm)

of vent pipe

 

 

 

from the outside wall and 12 inches (30 cm)

 

 

above the ground.

 

 

 

 

Concrete Wall

 

������ ��������

Clean out tee

Figure 26: Vertical rise with Horizontal Termination.

20

Image 20
Contents Meridian Table of Contents Introduction I. Pellet StandardsUSE of Cordwood is Prohibited by LAW Keep ASH PAN Free of RAW Fuel Operating Instructions Circuit Board Control Panel DecalThermostat / Switch Mode Initial START-UP See aboveRoutine Cleaning and Maintenance Tools Required to Clean UnitDoor Glass Cleaning 2-3 days Burn POT and Liner 2-3 daysDo not Place Unburned or RAW Pellet Fuel in ASH PAN Installation of firebox backing Post Season CLEAN-UPCleaning Plated Surfaces Firebox PanelInstallation Removing Freestanding Stove From the Pallet32 1/2 826mm 24 7/8 24 3/4 632mm 629mm Meridian on Floor Optional Hopper Cover Screw Placement Fresh AIR Intake ExhaustFreestanding Insert Crawlspace, narrow Walkway Closely Installation Pipe Must Extend Least Cm away Elbow with a rodent screen may be used Inside Vertical Installation Outside Vertical Installation Hearth Mount Side View Exterior Exhaust Blower To Supply Power to the Exhaust Blower Exhaust Blower Installation Horizontal TerminationExhaust Blower Installation Vertical Termination Before starting installation Noncombustible Hearth Pad Wiring harness from the bottom of the circuit board control RemovalSurround in then down to Tools Required Clean all plated surfaces before starting the stove. See Removal of Louver BAR SETPin Placement on Circuit Board Special Notes Hole for Pressure test withTroubleshooting Stove will not operate when hotDo not What to do ifExhaust motor will not function normally Light # 2 on Heat output bar flashing200 F 93 C high limit temperature sensor has tripped Control settings Heat Level has no effect on the fireConvection blower will not function normally Ignitor- the pellets will not lightWiring Diagram 5V DCParts List Reference Number Description Part NumberLouver Bar Set Gold Meridian Freestanding Steel Parts Parts Diagram Insert Steel Parts Diagram Components For the do-it-yourself Individual WarrantyTo the Distributor Installation Data Sheet Name of Owner Address