Enviro Meridian owner manual To Supply Power to the Exhaust Blower

Page 25

Installation

NOTE:

Ensure that all vent connections are installed by placing three (3) screws evenly spaced and a small bead of high temperature silicone at each chimney connection. Also ensure that all vertical vent sections are properly supported and that all clearances to combustibles are maintained in accordance with the vent manufacturer’s specifications.

Siding

 

Vent termination cap

 

(stainless steel termination

90° elbow

hood) or 45° elbow with

 

rodent screen

 

Wall strap

Wall framing

 

(recommended with

 

use of vent pipe)

 

Vent pipe or 2 foot

 

(610 mm) riser

 

Pipe adapter (if

Wall thimble

using 2 foot riser)

 

Exterior blower

 

and housing

 

Horizontal frame

 

for thimble

 

Armour cable supplying

 

power to exterior blower

 

 

ENVIRO Meridian

Figure 32: Exhaust Blower Installation; Horizontal Termination.

TO SUPPLY POWER TO THE EXHAUST BLOWER:

Install an amour coated electrical cable from the exhaust blower housing, through the wall thimble, and attach to the pre-drilled hole in the left hand rear hopper pillar. Hook up to wires from the wiring harness for the exhaust blower. All electrical connections must be in accordance with local code requirements (see

WIRING DIAGRAM).

25

Image 25
Contents Meridian Table of Contents I. Pellet Standards IntroductionUSE of Cordwood is Prohibited by LAW Keep ASH PAN Free of RAW Fuel Circuit Board Control Panel Decal Operating InstructionsInitial START-UP See above Thermostat / Switch ModeTools Required to Clean Unit Routine Cleaning and MaintenanceDoor Glass Cleaning 2-3 days Burn POT and Liner 2-3 daysDo not Place Unburned or RAW Pellet Fuel in ASH PAN Post Season CLEAN-UP Installation of firebox backingCleaning Plated Surfaces Firebox PanelRemoving Freestanding Stove From the Pallet Installation32 1/2 826mm 24 7/8 24 3/4 632mm 629mm Meridian on Floor Optional Hopper Cover Screw Placement Freestanding Insert ExhaustFresh AIR Intake Crawlspace, narrow Walkway Closely Installation Pipe Must Extend Least Cm away Elbow with a rodent screen may be used Inside Vertical Installation Outside Vertical Installation Hearth Mount Side View Exterior Exhaust Blower Exhaust Blower Installation Horizontal Termination To Supply Power to the Exhaust BlowerExhaust Blower Installation Vertical Termination Before starting installation Noncombustible Hearth Pad Removal Wiring harness from the bottom of the circuit board controlSurround in then down to Tools Required Removal of Louver BAR SET Clean all plated surfaces before starting the stove. SeePin Placement on Circuit Board Hole for Pressure test with Special NotesStove will not operate when hot TroubleshootingDo not What to do ifLight # 2 on Heat output bar flashing Exhaust motor will not function normallyControl settings Heat Level has no effect on the fire 200 F 93 C high limit temperature sensor has trippedConvection blower will not function normally Ignitor- the pellets will not light5V DC Wiring DiagramReference Number Description Part Number Parts ListLouver Bar Set Gold Meridian Freestanding Steel Parts Parts Diagram Insert Steel Parts Diagram Components To the Distributor WarrantyFor the do-it-yourself Individual Name of Owner Address Installation Data Sheet