Enviro Meridian owner manual Removal of Louver BAR SET

Page 31

Installation

two (2) screws under the corner lips above the door. Align top then tighten screws.

REMOVAL OF LOUVER BAR SET:

Door must be open. The three (3) arrows in Figure 45 point to three (3) of the nuts that hold the louvers on. There are three nuts on each end. Remove the six nuts by hand; if the nuts are tight, a 11/32” socket can be used. When removing the louvers, pull one end of the louver up over the stud. If it is difficult to remove the louver, push on one side from the front, then pull the other end off the second stud.

REPLACEMENT OF LOUVER BAR SET:

Place one slotted end of new louver over a stud, then slide the other slot over the corresponding stud; replace the nuts and hand tighten. Close door when all three louvers are replaced.

Figure 45: Door with louvers.

Clean all plated surfaces before starting the stove. See

CLEANING PLATED SURFACES in ROUTINE CLEANING AND MAINTENANCE.

PLATED DOOR INSTALLATION:

TO AVOID PERSONAL INJURY DO NOT REMOVE OR REPLACE COVER WHEN PELLET STOVE IS HOT!

TOOLS REQUIRED:

11/32” socket or wrench

REMOVAL OF DOOR COVER:

When stove is off and cool, open the door. Remove the four (4) #8 hex nuts around the inside of the glass retainer shown in Figure 46.

Remove door cover from door by gently sliding the studs out of the holes. If it is difficult to remove the cover, the glass retainer may be pinching the threads on the studs. Slightly loosen the four (4) screws (by each of the studs).

REPLACEMENT OF DOOR COVER:

Slide new door cover into place and hand tighten the four (4) #8 hex nuts around the inside of the glass retainer. Ensure the four screws are also hand tight and close door.

Figure 46: Inner side of Meridian door.

Clean all plated surfaces before starting the stove. See CLEANING PLATED SURFACES in ROUTINE CLEANING

AND MAINTENANCE.

31

Image 31
Contents Meridian Table of Contents I. Pellet Standards IntroductionUSE of Cordwood is Prohibited by LAW Keep ASH PAN Free of RAW Fuel Circuit Board Control Panel Decal Operating InstructionsInitial START-UP See above Thermostat / Switch ModeBurn POT and Liner 2-3 days Routine Cleaning and MaintenanceTools Required to Clean Unit Door Glass Cleaning 2-3 daysDo not Place Unburned or RAW Pellet Fuel in ASH PAN Firebox Panel Installation of firebox backingPost Season CLEAN-UP Cleaning Plated SurfacesRemoving Freestanding Stove From the Pallet Installation32 1/2 826mm 24 7/8 24 3/4 632mm 629mm Meridian on Floor Optional Hopper Cover Screw Placement Freestanding Insert ExhaustFresh AIR Intake Crawlspace, narrow Walkway Closely Installation Pipe Must Extend Least Cm away Elbow with a rodent screen may be used Inside Vertical Installation Outside Vertical Installation Hearth Mount Side View Exterior Exhaust Blower Exhaust Blower Installation Horizontal Termination To Supply Power to the Exhaust BlowerExhaust Blower Installation Vertical Termination Before starting installation Noncombustible Hearth Pad Removal Wiring harness from the bottom of the circuit board controlSurround in then down to Tools Required Removal of Louver BAR SET Clean all plated surfaces before starting the stove. SeePin Placement on Circuit Board Hole for Pressure test with Special NotesWhat to do if TroubleshootingStove will not operate when hot Do notLight # 2 on Heat output bar flashing Exhaust motor will not function normallyIgnitor- the pellets will not light 200 F 93 C high limit temperature sensor has trippedControl settings Heat Level has no effect on the fire Convection blower will not function normally5V DC Wiring DiagramReference Number Description Part Number Parts ListLouver Bar Set Gold Meridian Freestanding Steel Parts Parts Diagram Insert Steel Parts Diagram Components To the Distributor WarrantyFor the do-it-yourself Individual Name of Owner Address Installation Data Sheet