Installation
two (2) screws under the corner lips above the door. Align top then tighten screws.
REMOVAL OF LOUVER BAR SET:
Door must be open. The three (3) arrows in Figure 45 point to three (3) of the nuts that hold the louvers on. There are three nuts on each end. Remove the six nuts by hand; if the nuts are tight, a 11/32” socket can be used. When removing the louvers, pull one end of the louver up over the stud. If it is difficult to remove the louver, push on one side from the front, then pull the other end off the second stud.
REPLACEMENT OF LOUVER BAR SET:
Place one slotted end of new louver over a stud, then slide the other slot over the corresponding stud; replace the nuts and hand tighten. Close door when all three louvers are replaced.
Figure 45: Door with louvers.
Clean all plated surfaces before starting the stove. See
CLEANING PLATED SURFACES in ROUTINE CLEANING AND MAINTENANCE.
PLATED DOOR INSTALLATION:
TO AVOID PERSONAL INJURY DO NOT REMOVE OR REPLACE COVER WHEN PELLET STOVE IS HOT!
TOOLS REQUIRED:
●11/32” socket or wrench
REMOVAL OF DOOR COVER:
When stove is off and cool, open the door. Remove the four (4) #8 hex nuts around the inside of the glass retainer shown in Figure 46.
Remove door cover from door by gently sliding the studs out of the holes. If it is difficult to remove the cover, the glass retainer may be pinching the threads on the studs. Slightly loosen the four (4) screws (by each of the studs).
REPLACEMENT OF DOOR COVER:
Slide new door cover into place and hand tighten the four (4) #8 hex nuts around the inside of the glass retainer. Ensure the four screws are also hand tight and close door.
Figure 46: Inner side of Meridian door.
Clean all plated surfaces before starting the stove. See CLEANING PLATED SURFACES in ROUTINE CLEANING
AND MAINTENANCE.
31