Installation

INSTALLATION AND REMOVAL OF CONTROL PANEL IN THE SURROUND PANEL - FIREPLACE INSERT:

When installing the circuit board control panel into the surround panel, the surround does not need to be assembled. The circuit board will be found in the firebox.

 

Place the circuit board control panel on the backside of the right

 

surround panel so the hinge is on the outside and the top and

 

bottom holes on the control panel line up with those on the

 

surround. Attach using two (2) T-20 screws through the front of the

 

surround into the circuit board control panel.

 

After the surround has been assembled and is ready to be installed

 

on the unit plug the wiring harness into the control panel (see

����

Figure 35).

REMOVAL:

 

When maintenance is required on the unit the surround must be removed. Pull the surround straight up till it stops then pull it out about 4” (10 cm) and rest the surround on top of the unit while the control panel is removed or disconnected.

If electrical connection is required for the maintenance remove the circuit board control panel from the surround.

 

If electrical connection is not required for the maintenance remove

Figure 35: Right

the wiring harness from the bottom of the circuit board control.

Panel - Back.

 

Figure 36: Right

Panel - Front.

ASSEMBLY AND INSTALLATION OF INSERT SURROUND PANELS - FIREPLACE INSERT:

The trim set for your surround panel must be installed before installing the surround panel onto the unit, if not already done.

1.

To assemble the surround panels, lay the panels face

 

 

 

 

 

 

 

 

 

 

 

down on a soft flat surface and align the outer edges of

 

 

 

 

 

 

 

 

 

 

 

the sides with the top panel. Using four (4) T-20 screws

 

 

 

 

 

 

 

 

 

 

 

up through the side panels into the top (see Figure 37).

 

 

 

 

 

 

 

 

 

 

2.

Remove the backing off the magnets and stick them

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

inside the trim pieces as shown in Figure 38.

 

 

 

 

 

 

 

 

 

 

3.

Attach one side trim to the top trim, using a corner bracket

 

 

 

 

 

 

 

 

 

 

 

(see Figure 39) to secure pieces together. There are two

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(2) main pieces to each corner bracket (see Figure 40).

 

 

 

 

 

 

 

 

 

 

 

When installing the corner pieces into the trim, the “B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FACE” sides must face each other and the screw heads

 

 

 

 

 

 

 

 

 

 

 

are to face out. With the bracket in place and the top and

 

 

 

 

 

 

 

 

 

 

 

a side trim snug together, use a flat head screwdriver to

 

 

 

 

 

 

 

 

 

 

 

turn the two (2) screws in the bracket to tighten it into

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the trim.

 

 

 

 

 

 

 

 

 

 

4.

Slide the two (2) attached trim pieces onto the surround

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

panel.

 

 

 

 

 

 

 

 

 

 

5.

Attach the other side trim piece to the top trim, using the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 37: Assembled Surround Panel.

 

same method used in Step 3.

 

 

 

 

 

 

 

 

 

 

 

 

28

Image 28
Contents Meridian Table of Contents Introduction I. Pellet StandardsUSE of Cordwood is Prohibited by LAW Keep ASH PAN Free of RAW Fuel Operating Instructions Circuit Board Control Panel DecalThermostat / Switch Mode Initial START-UP See aboveRoutine Cleaning and Maintenance Tools Required to Clean UnitDoor Glass Cleaning 2-3 days Burn POT and Liner 2-3 daysDo not Place Unburned or RAW Pellet Fuel in ASH PAN Installation of firebox backing Post Season CLEAN-UPCleaning Plated Surfaces Firebox PanelInstallation Removing Freestanding Stove From the Pallet32 1/2 826mm 24 7/8 24 3/4 632mm 629mm Meridian on Floor Optional Hopper Cover Screw Placement Freestanding Insert ExhaustFresh AIR Intake Crawlspace, narrow Walkway Closely Installation Pipe Must Extend Least Cm away Elbow with a rodent screen may be used Inside Vertical Installation Outside Vertical Installation Hearth Mount Side View Exterior Exhaust Blower To Supply Power to the Exhaust Blower Exhaust Blower Installation Horizontal TerminationExhaust Blower Installation Vertical Termination Before starting installation Noncombustible Hearth Pad Wiring harness from the bottom of the circuit board control RemovalSurround in then down to Tools Required Clean all plated surfaces before starting the stove. See Removal of Louver BAR SETPin Placement on Circuit Board Special Notes Hole for Pressure test withTroubleshooting Stove will not operate when hotDo not What to do ifExhaust motor will not function normally Light # 2 on Heat output bar flashing200 F 93 C high limit temperature sensor has tripped Control settings Heat Level has no effect on the fireConvection blower will not function normally Ignitor- the pellets will not lightWiring Diagram 5V DCParts List Reference Number Description Part NumberLouver Bar Set Gold Meridian Freestanding Steel Parts Parts Diagram Insert Steel Parts Diagram Components To the Distributor WarrantyFor the do-it-yourself Individual Installation Data Sheet Name of Owner Address