Enviro Meridian owner manual Inside Vertical Installation

Page 21

Installation

INSIDE VERTICAL INSTALLATIONS - FREESTANDING:

1.Choose a stove location that is ideal. See the section “INSTALLATION - DECIDING WHERE TO LOCATE YOUR PELLET

APPLIANCE.”

2.Place the unit on the hearth pad (if installed on a carpeted surface) and space the unit in a manner so when the pellet vent is installed vertically, it will be 3” (76 mm) away from a combustible wall.

3.Locate the center of the fresh air intake pipe on the unit. Match that center with the same point on the wall and cut a hole about 2” (51 mm) in diameter.

4.Install the fresh air intake pipe.

5.Install the tee with clean out.

6.Install the pellet vent upward from there. When you reach the ceiling, make sure that the vent goes through the ceiling fire stop. Maintain a 3” (76 mm) distance to combustibles and keep attic insulation away from the vent pipe. Maintain an effective vapor barrier.

7.Finally, extend the pellet vent to go through the roof flashing.

8.Ensure that the rain cap is approximately 24” (610 mm) above the roof.

Rain cap - ensure cap is at least 2 feet (610mm) above the roof at the lowest point

Storm collar

Roof flashing

Roof rafter

Fire stop with

Support Collar

Ceiling joist

Vertical vent pipe

Clean out tee with

Pipe adapter

ENVIRO Meridian

NOTE:

All vent sections must maintian 3" (76 mm) clearances to combustibles.

Figure 27: Inside Vertical Installation.

21

Image 21
Contents Meridian Table of Contents I. Pellet Standards IntroductionUSE of Cordwood is Prohibited by LAW Keep ASH PAN Free of RAW Fuel Circuit Board Control Panel Decal Operating InstructionsInitial START-UP See above Thermostat / Switch ModeTools Required to Clean Unit Routine Cleaning and MaintenanceDoor Glass Cleaning 2-3 days Burn POT and Liner 2-3 daysDo not Place Unburned or RAW Pellet Fuel in ASH PAN Post Season CLEAN-UP Installation of firebox backingCleaning Plated Surfaces Firebox PanelRemoving Freestanding Stove From the Pallet Installation32 1/2 826mm 24 7/8 24 3/4 632mm 629mm Meridian on Floor Optional Hopper Cover Screw Placement Exhaust Freestanding InsertFresh AIR Intake Crawlspace, narrow Walkway Closely Installation Pipe Must Extend Least Cm away Elbow with a rodent screen may be used Inside Vertical Installation Outside Vertical Installation Hearth Mount Side View Exterior Exhaust Blower Exhaust Blower Installation Horizontal Termination To Supply Power to the Exhaust BlowerExhaust Blower Installation Vertical Termination Before starting installation Noncombustible Hearth Pad Removal Wiring harness from the bottom of the circuit board controlSurround in then down to Tools Required Removal of Louver BAR SET Clean all plated surfaces before starting the stove. SeePin Placement on Circuit Board Hole for Pressure test with Special NotesStove will not operate when hot TroubleshootingDo not What to do ifLight # 2 on Heat output bar flashing Exhaust motor will not function normallyControl settings Heat Level has no effect on the fire 200 F 93 C high limit temperature sensor has trippedConvection blower will not function normally Ignitor- the pellets will not light5V DC Wiring DiagramReference Number Description Part Number Parts ListLouver Bar Set Gold Meridian Freestanding Steel Parts Parts Diagram Insert Steel Parts Diagram Components Warranty To the DistributorFor the do-it-yourself Individual Name of Owner Address Installation Data Sheet