Enviro DV50DX owner manual Initial Installation, Qualified Installers Only

Page 12
Initial Installation

Initial Installation

QUALIFIED INSTALLERS ONLY

INTRODUCTION:

This section of the owner’s manual is for the use of qualified technicians only. Fireplace placement, hearths, facings, mantles, and venting terminations will be covered, as well as the gas and electric systems. There are several installation safety guidelines that must be adhered to. Please carefully read the safety precautions at the front of this manual.

Warning: Clearances must be sufficient to allow access for maintenance and service.

PLACEMENT:

The location for the fireplace can be along a wall, raised or at floor level, or in a corner. There are specific framing measurements for each situation. The basic opening should have the dimensions shown below in Figure 10.

 

 

 

 

 

 

 

49"

 

 

 

 

 

 

 

(1245mm)

 

 

 

 

 

 

 

7 3/8"

 

 

 

 

 

 

(187mm)

 

 

 

 

 

 

Gas Inlet

 

 

 

 

 

 

 

2 1/8"

 

 

"

 

 

(54mm)

 

 

 

 

 

 

 

 

8

 

 

 

 

 

5/

 

)

 

 

 

1

 

 

 

 

 

 

m

 

 

 

2 m

 

 

 

 

 

9

 

 

 

 

 

 

4

 

 

 

 

 

 

5

 

 

 

 

 

 

(

 

 

 

 

 

 

 

 

 

 

 

 

 

"

)

 

 

 

 

 

 

5

m

 

 

 

 

 

4

 

 

 

 

 

 

m

 

 

 

 

 

 

3

 

Electrical Line

 

 

 

 

4

 

 

 

 

1

 

 

 

 

1

 

 

 

 

 

 

(

 

 

 

Figure 10. Dimensions for Framing the Firebox.

The fireplace must have a strong and level surface to be placed on. The surface should be made of wood or a non- combustible material, not carpet.

The 215⁄8 inches (549 mm) dimension takes into account the 1 inch (25 mm) standoff on the back of the firebox. The framing boards may touch the standoffs, but no insulating material can be placed between the frame and the standoffs.

The gas line, 3/8” NPT, should be brought to the right side of the fireplace. If this set up is inconvenient, the electrical wire and the gas line configuration can be reversed.

The location should be chosen so the fireplace will be at least 36 inches (914

mm)from drapes, doors and other combustibles. The fireplace opening should also be at least 7 inches (178

mm)from the nearest perpendicular wall (sidewall to the edge of the opening).

Firebox framing:

 

 

Depth -

215⁄8”

(549 mm)

Width -

45”

(1143 mm)

Height -

49”

(1245 mm)

Gas/Electrical Inlet:

 

 

Distance back -

73⁄8”

(187 mm)

Distance up -

 

21⁄8”

(54 mm)

12

Image 12
Contents WHAT TO DO IF YOU SMELL GAS DV50DXOpen windows/extinguish any open flame Do not try to light any applianceSafety Precautions FOR YOUR SAFETYGENERAL Table of Contents Codes And Approvals VENTED GAS FIREPLACE HEATER DV50DX NG/LPGThis ENVIRO DV50DX Fireplace Specifications INSTALLATION OPTIONSOperating Instructions FOR YOUR SAFETY READ BEFORELIGHTING INSTRUCTIONS PILOT LIGHTING INSTRUCTIONSNEVER USE AN OPEN FLAME FOR LEAK TESTING Operating InstructionsOperating Instructions TO TURN GAS FIREPLACE OFFMaintenance And Service ROUTINE MAINTENANCECLEANING THE GLASS CLEANING THE FIREBOXMaintenance And Service CLEANING DECORATIVE SURFACESGLASS DOOR REMOVAL Figure 8. Glass Removal HandleMaintenance And Service StepStep StepInitial Installation QUALIFIED INSTALLERS ONLYInitial Installation QUALIFIED INSTALLERS ONLYCORNER INSTALLATION Figure 11. Dimensions for a corner installationInitial Installation QUALIFIED INSTALLERS ONLYFIREPLACE SURROUND Figure 14. Raised Fireplace with Raised HearthInitial Installation QUALIFIED INSTALLERS ONLYTop of unit to horizontal framing 12 5/16” 313 mm Initial Installation QUALIFIED INSTALLERS ONLYInitial Installation QUALIFIED INSTALLERS ONLYmm of clearance are necessary. See Figure Initial Installation QUALIFIED INSTALLERS ONLYVENT CONFIGURATIONS AND RESTRICTOR SETTINGS Figure 20. Possible Vent ConfigurationsInitial Installation QUALIFIED INSTALLERS ONLYthe possibility of a fire Initial Installation QUALIFIED INSTALLERS ONLYStep 4. Assemble Initial Installation QUALIFIED INSTALLERS ONLYSTEP 10. Twist-lockthe vent cap Initial Installation QUALIFIED INSTALLERS ONLYFigure 26 Multi-StoryVent Pipe Installation Figure 25 Use of Wall StrapsInitial Installation QUALIFIED INSTALLERS ONLYDUCTING Figure 27. Heat Dumping OptionsInitial Installation QUALIFIED INSTALLERS ONLYELECTRICAL REQUIREMENTS NEVER USE AN OPEN FLAME FOR LEAK TESTING Initial InstallationGAS LINE CONNECTION TO TEST VALVE PRESSURESSecondary Installation WARNING DO NOT INSTALL LINER IF UNIT IS HOTImportant installation notes Secondary Installation LOG SET ASSEMBLYFigure 35. First Stage Log Set Installation Figure 36. Second Stage Log Set InstallationSecondary Installation Figure 38. Fourth Stage Log Set InstallationFigure 39. Fifth Stage Log Set Installation Figure 40. Final Log Set ArrangementSecondary Installation Figure 42 The DV50DX burning with a good flameSecondary Installation screws and the control panelTroubleshooting ProblemSolution Possible CauseParts List - Components ReferenceDescription PartParts Diagram DV50DX - ComponentsNovember Parts List- Options OptionsPart Number Warranty TO THE DEALERTO THE DISTRIBUTOR Installation Data Sheet