Enviro DV50DX owner manual Initial Installation, Qualified Installers Only

Page 15
Top of unit to horizontal framing:

Initial Installation

QUALIFIED INSTALLERS ONLY

MANTLE CLEARANCES:

It is not necessary to install a mantle, but if one is desired it is important to follow the guidelines shown in Figure 16.

Top of unit to horizontal framing:

12 5/16” (313 mm)

Top of flange to top of cement board: 15 1⁄2” (394 mm)

Top of flange to bottom of 31⁄2” mantle: 24 1⁄2” (622 mm)

Top of flange to bottom of 8” mantle: 27 1⁄2” (699 mm)

VENT PARTS AND TERMINAL CLEARANCES:

Combustibles

8" (203mm) mantle

 

31⁄2" (89mm)

 

27 1⁄2”

 

(699mm)

 

24 1⁄2”

12 5/16

(622mm)

 

(313mm)

15 1⁄2”

 

(394mm)

DV50DX

 

 

Cement Board

Figure 16. Combustible Mantle Clearances.

Table 1: Vent part numbers.

Simpson Duravent (SD), Selkirk (SEL), and Security Chimneys (SC), must state if galvanized or black wanted, PART NUMBERS:

SD

SEL

SC

Description

SD

SEL

SC

Description

 

 

 

 

 

 

 

 

908

4DT-6

SV4L6

6” pipe length

911

 

 

11” to 14 5/8” pipe, adjustable

907

4DT-9

 

9” pipe length

 

4DT-AJ

 

4” to 10” pipe , adjustable

 

 

 

 

 

 

 

 

906

4DT-12

SV4L12

12” pipe length

 

 

SV4LA12

11⁄2” to 12” pipe , adjustable

 

 

 

 

 

 

 

 

904

4DT-24

SV4L24

24” pipe length

943

4DT-AF6

 

Flashing, 0/12 to 6/12 roof pitch

 

 

 

 

 

 

 

 

903

4DT-36

SV4L36

36” pipe length

943S

4DT-AF12

 

Flashing, 7/12 to 12/12 roof pitch

 

 

 

 

 

 

 

 

902

4DT-48

SV4L48

48” pipe length

 

 

SV4FA

Flashing, 1/12 to 7/12 roof pitch

 

 

 

 

 

 

 

 

945

4DT-EL45

SV4EBR45

45° elbow, black

 

 

SV4FB

Flashing, 8/12 to 12/12 roof pitch

 

 

 

 

 

 

 

 

990

4DT-EL90

SV4EBR90

90° elbow, black

943F

 

SV4F

Flat flashing

 

 

 

 

 

 

 

 

950

4DT-VS

SV4VS

Vinyl siding standoff/sheild

980

4DT-VC

SV4CGV

Vertical termination

 

 

 

 

 

 

 

 

942

4DT-WT

SV4RSN

Wall thimble

991

4DT-HVC

 

High wind vertical termination

 

 

 

 

 

 

 

 

953

4DT-SC

SV4FC

Storm collar

984

4DT-HC

SV4CHC

Horizontal square termination

 

 

 

 

 

 

 

 

963

4DT-FS

SV4BF

Fire stop

985

4DT-HHC

 

High wind horizontal termination

 

 

 

 

 

 

 

 

988

4DT-WS/B

SV4BM

Wall strap/support/band

978

4DT-VKC

SV0FAK

Vertical termination kit

 

 

 

 

 

 

 

 

970

4DT-HKA

SV0SHK

Horizontal termination kit (SD: Basic

971

4DT-HKB

SV0SHK2

Horizontal termination kit

 

 

 

Kit, SEL: Kit A, SC: Standard Kit)

 

 

 

(SD: Kit A, SEL: Kit B, SC: Kit)

 

 

 

 

 

 

 

 

The Sherwood Home Collection of fireplaces have been tested and certified for use with SIMPSON DURAVENT TYPE GS PIPE FOR GAS STOVES. SECURITY CHIMNEY’S “SECURE VENT DIRECT VENT SYSTEM” and SELKIRK “METALBESTOS MDV VENT SYSTEM” kits are available for horizontal venting. When using Simpson Duravent, it is recommended that, before installation, a bead of RTV High Temperature Silicone should be applied to each outer vent joint, and Mil-Pac to each inner joint. When planning an installation, it will be necessary to select the proper length of vent pipe for the particular requirements.

15

Image 15
Contents Do not try to light any appliance WHAT TO DO IF YOU SMELL GASDV50DX Open windows/extinguish any open flameSafety Precautions FOR YOUR SAFETYGENERAL Table of Contents Codes And Approvals VENTED GAS FIREPLACE HEATER DV50DX NG/LPGThis ENVIRO DV50DX Fireplace INSTALLATION OPTIONS SpecificationsPILOT LIGHTING INSTRUCTIONS Operating InstructionsFOR YOUR SAFETY READ BEFORE LIGHTING INSTRUCTIONSOperating Instructions NEVER USE AN OPEN FLAME FOR LEAK TESTINGTO TURN GAS FIREPLACE OFF Operating InstructionsCLEANING THE FIREBOX Maintenance And ServiceROUTINE MAINTENANCE CLEANING THE GLASSFigure 8. Glass Removal Handle Maintenance And ServiceCLEANING DECORATIVE SURFACES GLASS DOOR REMOVALStep Maintenance And ServiceStep StepQUALIFIED INSTALLERS ONLY Initial InstallationFigure 11. Dimensions for a corner installation Initial InstallationQUALIFIED INSTALLERS ONLY CORNER INSTALLATIONFigure 14. Raised Fireplace with Raised Hearth Initial InstallationQUALIFIED INSTALLERS ONLY FIREPLACE SURROUNDInitial Installation QUALIFIED INSTALLERS ONLYTop of unit to horizontal framing 12 5/16” 313 mm QUALIFIED INSTALLERS ONLY Initial InstallationInitial Installation QUALIFIED INSTALLERS ONLYmm of clearance are necessary. See Figure Figure 20. Possible Vent Configurations Initial InstallationQUALIFIED INSTALLERS ONLY VENT CONFIGURATIONS AND RESTRICTOR SETTINGSInitial Installation QUALIFIED INSTALLERS ONLYthe possibility of a fire Initial Installation QUALIFIED INSTALLERS ONLYStep 4. Assemble Initial Installation QUALIFIED INSTALLERS ONLYSTEP 10. Twist-lockthe vent cap Figure 25 Use of Wall Straps Initial InstallationQUALIFIED INSTALLERS ONLY Figure 26 Multi-StoryVent Pipe InstallationFigure 27. Heat Dumping Options Initial InstallationQUALIFIED INSTALLERS ONLY DUCTINGInitial Installation QUALIFIED INSTALLERS ONLYELECTRICAL REQUIREMENTS TO TEST VALVE PRESSURES NEVER USE AN OPEN FLAME FOR LEAK TESTINGInitial Installation GAS LINE CONNECTIONSecondary Installation WARNING DO NOT INSTALL LINER IF UNIT IS HOTImportant installation notes Figure 36. Second Stage Log Set Installation Secondary InstallationLOG SET ASSEMBLY Figure 35. First Stage Log Set InstallationFigure 40. Final Log Set Arrangement Secondary InstallationFigure 38. Fourth Stage Log Set Installation Figure 39. Fifth Stage Log Set InstallationFigure 42 The DV50DX burning with a good flame Secondary Installationscrews and the control panel Secondary InstallationPossible Cause TroubleshootingProblem SolutionPart Parts List - ComponentsReference DescriptionParts Diagram DV50DX - ComponentsNovember Parts List- Options OptionsPart Number Warranty TO THE DEALERTO THE DISTRIBUTOR Installation Data Sheet