Enviro DV50DX Initial Installation, Qualified Installers Only, the possibility of a fire

Page 19
NOTES:

Initial Installation

QUALIFIED INSTALLERS ONLY

HORIZONTAL TERMINATION:

NOTES:

 

 

 

 

 

 

 

 

 

1. Horizontal pipes must not be level. For every 12 inches (305 mm) of horizontal travel

(away from the stove), there should be at least 1⁄4 inch (6.4 mm) of vertical travel. Never

allow the vent to run downward, as this could cause high temperatures or even present

the possibility of a fire.

 

 

 

 

2. The exterior of the horizontal

 

 

vent termination must not be

 

 

blocked or obstructed.

 

 

 

 

3. If the vent termination is not

 

 

being

attached to

wood,

 

the

Wall thimble

 

four

wood

screws

provided

 

fire stop

Horizontal wall

should

be

replaced

with

 

termination

material appropriate fasteners.

 

 

4. For buildings with vinyl siding,

 

Wall framing

a vinyl standoff should be

 

 

installed between the vent cap

Elbow

 

and the exterior wall. Attach

 

 

the

vinyl

siding

standoff

to

 

 

the

horizontal

termination.

 

 

Note

 

that

 

the

termination

Exhaust

 

bolts onto the flat portion of

flex pipe

 

 

 

the standoff, providing an

air

Combustion air

 

space between the wall and

outer pipe

 

 

 

the vent termination. The air

 

 

gap

prevents excessive

heat

 

 

from possibly melting the vinyl

 

 

siding.

 

 

 

 

 

 

 

 

 

5. Horizontal

 

pipes

 

must

 

be

Figure 22. Horizontal Vent Termination

 

supported

every

3

feet

(914

 

mm). Plumber’s all round strap will suffice.

6.When running horizontal pipe, clearances to combustibles must be maintained 11⁄2 inches (38 mm) sides, 11⁄2 inches (38 mm) bottom, and 2 inches (51 mm) top.

Step 1. Set the fireplace in the desired location. Check to determine if wall studs will be in the way when the venting system is attached. If this is the case, the location of the fireplace may have to be adjusted or the venting may have to be offset.

Step 2. Direct vent pipe sections are designed with special twist-lock connections. Dry fit the desired combination of pipe and elbows to the appliance adaptor.

Step 3. With the pipe in the correct position and attached to the fireplace, mark the wall for a 10 inches (25.4 cm) x 10 inches (25.4 cm) square hole (see Figure 19). The center of the hole should match the center line of the horizontal pipe. Cut and frame the hole in the exterior wall where the vent will be terminated. If the wall being penetrated is made of a non-combustible material (i.e. masonry or concrete) a 7 inches (17.8 cm) hole is acceptable.

19

Image 19
Contents Do not try to light any appliance WHAT TO DO IF YOU SMELL GASDV50DX Open windows/extinguish any open flameFOR YOUR SAFETY Safety PrecautionsGENERAL Table of Contents VENTED GAS FIREPLACE HEATER DV50DX NG/LPG Codes And ApprovalsThis ENVIRO DV50DX Fireplace INSTALLATION OPTIONS SpecificationsPILOT LIGHTING INSTRUCTIONS Operating InstructionsFOR YOUR SAFETY READ BEFORE LIGHTING INSTRUCTIONSOperating Instructions NEVER USE AN OPEN FLAME FOR LEAK TESTINGTO TURN GAS FIREPLACE OFF Operating InstructionsCLEANING THE FIREBOX Maintenance And ServiceROUTINE MAINTENANCE CLEANING THE GLASSFigure 8. Glass Removal Handle Maintenance And ServiceCLEANING DECORATIVE SURFACES GLASS DOOR REMOVALStep Maintenance And ServiceStep StepQUALIFIED INSTALLERS ONLY Initial InstallationFigure 11. Dimensions for a corner installation Initial InstallationQUALIFIED INSTALLERS ONLY CORNER INSTALLATIONFigure 14. Raised Fireplace with Raised Hearth Initial InstallationQUALIFIED INSTALLERS ONLY FIREPLACE SURROUNDQUALIFIED INSTALLERS ONLY Initial InstallationTop of unit to horizontal framing 12 5/16” 313 mm QUALIFIED INSTALLERS ONLY Initial InstallationQUALIFIED INSTALLERS ONLY Initial Installationmm of clearance are necessary. See Figure Figure 20. Possible Vent Configurations Initial InstallationQUALIFIED INSTALLERS ONLY VENT CONFIGURATIONS AND RESTRICTOR SETTINGSQUALIFIED INSTALLERS ONLY Initial Installationthe possibility of a fire QUALIFIED INSTALLERS ONLY Initial InstallationStep 4. Assemble QUALIFIED INSTALLERS ONLY Initial InstallationSTEP 10. Twist-lockthe vent cap Figure 25 Use of Wall Straps Initial InstallationQUALIFIED INSTALLERS ONLY Figure 26 Multi-StoryVent Pipe InstallationFigure 27. Heat Dumping Options Initial InstallationQUALIFIED INSTALLERS ONLY DUCTINGQUALIFIED INSTALLERS ONLY Initial InstallationELECTRICAL REQUIREMENTS TO TEST VALVE PRESSURES NEVER USE AN OPEN FLAME FOR LEAK TESTINGInitial Installation GAS LINE CONNECTIONWARNING DO NOT INSTALL LINER IF UNIT IS HOT Secondary InstallationImportant installation notes Figure 36. Second Stage Log Set Installation Secondary InstallationLOG SET ASSEMBLY Figure 35. First Stage Log Set InstallationFigure 40. Final Log Set Arrangement Secondary InstallationFigure 38. Fourth Stage Log Set Installation Figure 39. Fifth Stage Log Set InstallationFigure 42 The DV50DX burning with a good flame Secondary Installationscrews and the control panel Secondary InstallationPossible Cause TroubleshootingProblem SolutionPart Parts List - ComponentsReference DescriptionDV50DX - Components Parts DiagramNovember Options Parts List- OptionsPart Number TO THE DEALER WarrantyTO THE DISTRIBUTOR Installation Data Sheet