Enviro DV50DX owner manual Secondary Installation, screws and the control panel

Page 30
screws and the control panel.

Secondary Installation

BURNER AND FAN REMOVAL:

1.Remove brick liners, see steps 1 to 4 in SECONDARY INSTALLATION - CERAMIC BRICK LINER REMOVAL.

2.The control panel is held in place with a T-20 screw on each end of the panel. Remove the two (2)

screws and the control panel.

3.Undo the six (6) screws holding the burner down, the andirons and grate can be removed from the burner or left on. Pull the burner to the left approximately 1” (25 mm), this is done in order to slide the venturi out of the venturi box. Remove the burner from the firebox.

4.Four (4) screws along the top of the air deflector hold it in place, remove the screws and the deflector.

5.Remove the ten (10) screws around the perimeter that hold the valve tray in place and remove the valve tray.

6.On either side of the fan there is a screw fastening the fan mount to the firebox, remove the screws to remove the fan.

Re-install everything by following steps 1 to 6 in reverse order.

 

Burner

Fan

 

Valve Tray

 

Air Deflector

 

Andirons and Grate

Control Panel

 

Figure 43: Removal of DV50DX Burner and Fan.

30

Image 30
Contents Open windows/extinguish any open flame WHAT TO DO IF YOU SMELL GASDV50DX Do not try to light any applianceSafety Precautions FOR YOUR SAFETYGENERAL Table of Contents Codes And Approvals VENTED GAS FIREPLACE HEATER DV50DX NG/LPGThis ENVIRO DV50DX Fireplace Specifications INSTALLATION OPTIONSLIGHTING INSTRUCTIONS Operating InstructionsFOR YOUR SAFETY READ BEFORE PILOT LIGHTING INSTRUCTIONSNEVER USE AN OPEN FLAME FOR LEAK TESTING Operating InstructionsOperating Instructions TO TURN GAS FIREPLACE OFFCLEANING THE GLASS Maintenance And ServiceROUTINE MAINTENANCE CLEANING THE FIREBOXGLASS DOOR REMOVAL Maintenance And ServiceCLEANING DECORATIVE SURFACES Figure 8. Glass Removal HandleStep Maintenance And ServiceStep StepInitial Installation QUALIFIED INSTALLERS ONLYCORNER INSTALLATION Initial InstallationQUALIFIED INSTALLERS ONLY Figure 11. Dimensions for a corner installationFIREPLACE SURROUND Initial InstallationQUALIFIED INSTALLERS ONLY Figure 14. Raised Fireplace with Raised HearthInitial Installation QUALIFIED INSTALLERS ONLYTop of unit to horizontal framing 12 5/16” 313 mm Initial Installation QUALIFIED INSTALLERS ONLYInitial Installation QUALIFIED INSTALLERS ONLYmm of clearance are necessary. See Figure VENT CONFIGURATIONS AND RESTRICTOR SETTINGS Initial InstallationQUALIFIED INSTALLERS ONLY Figure 20. Possible Vent ConfigurationsInitial Installation QUALIFIED INSTALLERS ONLYthe possibility of a fire Initial Installation QUALIFIED INSTALLERS ONLYStep 4. Assemble Initial Installation QUALIFIED INSTALLERS ONLYSTEP 10. Twist-lockthe vent cap Figure 26 Multi-StoryVent Pipe Installation Initial InstallationQUALIFIED INSTALLERS ONLY Figure 25 Use of Wall StrapsDUCTING Initial InstallationQUALIFIED INSTALLERS ONLY Figure 27. Heat Dumping OptionsInitial Installation QUALIFIED INSTALLERS ONLYELECTRICAL REQUIREMENTS GAS LINE CONNECTION NEVER USE AN OPEN FLAME FOR LEAK TESTINGInitial Installation TO TEST VALVE PRESSURESSecondary Installation WARNING DO NOT INSTALL LINER IF UNIT IS HOTImportant installation notes Figure 35. First Stage Log Set Installation Secondary InstallationLOG SET ASSEMBLY Figure 36. Second Stage Log Set InstallationFigure 39. Fifth Stage Log Set Installation Secondary InstallationFigure 38. Fourth Stage Log Set Installation Figure 40. Final Log Set ArrangementSecondary Installation Figure 42 The DV50DX burning with a good flameSecondary Installation screws and the control panelSolution TroubleshootingProblem Possible CauseDescription Parts List - ComponentsReference PartParts Diagram DV50DX - ComponentsNovember Parts List- Options OptionsPart Number Warranty TO THE DEALERTO THE DISTRIBUTOR Installation Data Sheet