Enviro
DV50DX Never Use An Open Flame For Leak Testing, Initial Installation, Gas Line Connection
Troubleshooting
Specs
Install
Parts list
Parts Diagram
Warranty
Maintenance
Log Set Assembly
Cleaning Decorative Surfaces
Safety Precautions
Page 25
Page 24
Page 26
Image 25
Page 24
Page 26
Contents
DV50DX
WHAT TO DO IF YOU SMELL GAS
Open windows/extinguish any open flame
Do not try to light any appliance
FOR YOUR SAFETY
Safety Precautions
GENERAL
Table of Contents
VENTED GAS FIREPLACE HEATER DV50DX NG/LPG
Codes And Approvals
This ENVIRO DV50DX Fireplace
INSTALLATION OPTIONS
Specifications
FOR YOUR SAFETY READ BEFORE
Operating Instructions
LIGHTING INSTRUCTIONS
PILOT LIGHTING INSTRUCTIONS
Operating Instructions
NEVER USE AN OPEN FLAME FOR LEAK TESTING
TO TURN GAS FIREPLACE OFF
Operating Instructions
ROUTINE MAINTENANCE
Maintenance And Service
CLEANING THE GLASS
CLEANING THE FIREBOX
CLEANING DECORATIVE SURFACES
Maintenance And Service
GLASS DOOR REMOVAL
Figure 8. Glass Removal Handle
Step
Maintenance And Service
Step
Step
QUALIFIED INSTALLERS ONLY
Initial Installation
QUALIFIED INSTALLERS ONLY
Initial Installation
CORNER INSTALLATION
Figure 11. Dimensions for a corner installation
QUALIFIED INSTALLERS ONLY
Initial Installation
FIREPLACE SURROUND
Figure 14. Raised Fireplace with Raised Hearth
QUALIFIED INSTALLERS ONLY
Initial Installation
Top of unit to horizontal framing 12 5/16” 313 mm
QUALIFIED INSTALLERS ONLY
Initial Installation
QUALIFIED INSTALLERS ONLY
Initial Installation
mm of clearance are necessary. See Figure
QUALIFIED INSTALLERS ONLY
Initial Installation
VENT CONFIGURATIONS AND RESTRICTOR SETTINGS
Figure 20. Possible Vent Configurations
QUALIFIED INSTALLERS ONLY
Initial Installation
the possibility of a fire
QUALIFIED INSTALLERS ONLY
Initial Installation
Step 4. Assemble
QUALIFIED INSTALLERS ONLY
Initial Installation
STEP 10. Twist-lockthe vent cap
QUALIFIED INSTALLERS ONLY
Initial Installation
Figure 26 Multi-StoryVent Pipe Installation
Figure 25 Use of Wall Straps
QUALIFIED INSTALLERS ONLY
Initial Installation
DUCTING
Figure 27. Heat Dumping Options
QUALIFIED INSTALLERS ONLY
Initial Installation
ELECTRICAL REQUIREMENTS
Initial Installation
NEVER USE AN OPEN FLAME FOR LEAK TESTING
GAS LINE CONNECTION
TO TEST VALVE PRESSURES
WARNING DO NOT INSTALL LINER IF UNIT IS HOT
Secondary Installation
Important installation notes
LOG SET ASSEMBLY
Secondary Installation
Figure 35. First Stage Log Set Installation
Figure 36. Second Stage Log Set Installation
Figure 38. Fourth Stage Log Set Installation
Secondary Installation
Figure 39. Fifth Stage Log Set Installation
Figure 40. Final Log Set Arrangement
Figure 42 The DV50DX burning with a good flame
Secondary Installation
screws and the control panel
Secondary Installation
Problem
Troubleshooting
Solution
Possible Cause
Reference
Parts List - Components
Description
Part
DV50DX - Components
Parts Diagram
November
Options
Parts List- Options
Part Number
TO THE DEALER
Warranty
TO THE DISTRIBUTOR
Installation Data Sheet
Related pages
All Install page
››Anwendung deinstallieren for Samsung GT-I5500YKADBT
Installing the T-Arm Sockets for Invacare 1073955
Installation & Maintenance for Samsung WA15G2Q1EW/XSG
Installation Connecting to a Computer for Sanyo PLC-WXL46
Standard Installation for Dynacord 1000
Removing and installing the 2.5 inch hard drive cage for Dell C4130
Axis Camera Management più telecamere/grandi installazioni for Axis Communications P3346-V
Using Your Antenna or Cable TV Installation for Vizio P42
To start the installation from a Windows computer for HP 2575v
How do I update the firmware for my
Samsung BD-C8200
?
Top
Page
Image
Contents