Enviro DV50DX owner manual Initial Installation, Qualified Installers Only, Assemble

Page 20
Step 4. Assemble

Initial Installation

QUALIFIED INSTALLERS ONLY

NOTE: For Simpson Duravent only, place a bead of Mil-Pac or Rutland No 78 Stove and Gasket Cement on the outer edge of the inner exhaust pipe (non-flared end). Push the pipe sections together, then twist about 1⁄4 turn, making sure the two sections are fully locked. Wrap all seams with foil ducting tape.

Step 4. With the hole now framed, the wall thimble installed, and the pipe extending into the wall, proceed to the outside. Attach the termination to the pipe using RTV and Mil-Pac or Rutland No 78 Stove and Gasket Cement to seal joints. The vent pipe must extend into the vent cap at least 11⁄4 inches (3.2 cm). Secure the connection between the vent cap and the pipe by attaching the two (2) sheet metal straps, which extend from the vent cap assembly to the outer wall of the vent pipe. Bend any remaining portion of the strap back towards the vent cap. Security Secure Vent uses a twist lock cap.

Step 5. Position the horizontal vent termination in the center of the 10 inches (25.4 cm) square hole and attach to the exterior wall with the four screws provided. The arrow on the vent termination should be pointing up. Run a bead of non-hardening mastic around the edges of the vent cap, to make a seal with the wall. Ensure the proper clearances to combustibles have been maintained.

VERTICAL TERMINATION:

Step 1. Check the instructions for required clearances (air spaces) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. Do not pack air spaces with insulation.

Step 2. Set the gas appliance in the desired location. Drop a plumb bob down from the ceiling to the position of the appliance flue exit, and mark the location where the vent will penetrate the ceiling. Drill a small hole at this point. Next, drop a plumb bob from the roof to the hole previously drilled in the ceiling, mark the spot where the vent will penetrate the roof. Determine if ceiling joists, roof rafters, or other framing will obstruct the venting system. You may wish to relocate the appliance, or to offset, to avoid cutting load bearing members.

Step 3. To install the Round Support Box/Wall Thimble in a flat ceiling, cut a 10 inch (25.4 cm) square hole in the ceiling, centered in the hole drilled in Step 2. Frame the hole as shown in Figure 19.

Step 4. Assemble

the desired

lengths

of

black

pipe

and elbows

necessary to

reach from the appliance

adapter

up

through

the

Round

Support

Box.

Insure that all pipe and

elbow

connections

are

in their fully twist-locked position.

 

Vertical

 

Termination

Elbow Strap

Storm Collar

 

Flashing

 

Roofing nails

Figure 23. Vertical Vent Termination

20

Image 20
Contents WHAT TO DO IF YOU SMELL GAS DV50DXOpen windows/extinguish any open flame Do not try to light any applianceGENERAL Safety PrecautionsFOR YOUR SAFETY Table of Contents This ENVIRO DV50DX Fireplace Codes And ApprovalsVENTED GAS FIREPLACE HEATER DV50DX NG/LPG Specifications INSTALLATION OPTIONSOperating Instructions FOR YOUR SAFETY READ BEFORELIGHTING INSTRUCTIONS PILOT LIGHTING INSTRUCTIONSNEVER USE AN OPEN FLAME FOR LEAK TESTING Operating InstructionsOperating Instructions TO TURN GAS FIREPLACE OFFMaintenance And Service ROUTINE MAINTENANCECLEANING THE GLASS CLEANING THE FIREBOXMaintenance And Service CLEANING DECORATIVE SURFACESGLASS DOOR REMOVAL Figure 8. Glass Removal HandleMaintenance And Service StepStep StepInitial Installation QUALIFIED INSTALLERS ONLYInitial Installation QUALIFIED INSTALLERS ONLYCORNER INSTALLATION Figure 11. Dimensions for a corner installationInitial Installation QUALIFIED INSTALLERS ONLYFIREPLACE SURROUND Figure 14. Raised Fireplace with Raised HearthTop of unit to horizontal framing 12 5/16” 313 mm Initial InstallationQUALIFIED INSTALLERS ONLY Initial Installation QUALIFIED INSTALLERS ONLYmm of clearance are necessary. See Figure Initial InstallationQUALIFIED INSTALLERS ONLY Initial Installation QUALIFIED INSTALLERS ONLYVENT CONFIGURATIONS AND RESTRICTOR SETTINGS Figure 20. Possible Vent Configurationsthe possibility of a fire Initial InstallationQUALIFIED INSTALLERS ONLY Step 4. Assemble Initial InstallationQUALIFIED INSTALLERS ONLY STEP 10. Twist-lockthe vent cap Initial InstallationQUALIFIED INSTALLERS ONLY Initial Installation QUALIFIED INSTALLERS ONLYFigure 26 Multi-StoryVent Pipe Installation Figure 25 Use of Wall StrapsInitial Installation QUALIFIED INSTALLERS ONLYDUCTING Figure 27. Heat Dumping OptionsELECTRICAL REQUIREMENTS Initial InstallationQUALIFIED INSTALLERS ONLY NEVER USE AN OPEN FLAME FOR LEAK TESTING Initial InstallationGAS LINE CONNECTION TO TEST VALVE PRESSURESImportant installation notes Secondary InstallationWARNING DO NOT INSTALL LINER IF UNIT IS HOT Secondary Installation LOG SET ASSEMBLYFigure 35. First Stage Log Set Installation Figure 36. Second Stage Log Set InstallationSecondary Installation Figure 38. Fourth Stage Log Set InstallationFigure 39. Fifth Stage Log Set Installation Figure 40. Final Log Set ArrangementSecondary Installation Figure 42 The DV50DX burning with a good flameSecondary Installation screws and the control panelTroubleshooting ProblemSolution Possible CauseParts List - Components ReferenceDescription PartNovember Parts DiagramDV50DX - Components Part Number Parts List- OptionsOptions TO THE DISTRIBUTOR WarrantyTO THE DEALER Installation Data Sheet