Regency E33-LP, E33-NG 03-21, Locating Pins 03-20, 03-23 03-18, 03-22, Locating Tab

Page 11

INSTALLATION

5)Re-install the grate (reverse step 3).

6)Line up the pin holes (located at the bottom of log 03-23) to the pins of the rear log sup- port and position them into place. (refer to Diagram 3)

03-23

Locating Pins

Diagram 3

7)Align the bottom grooves of log 03-21 onto the right side of the grate and gently slide the log back until it touches the locating tab (refer to Diagram 4 & 5).

03-21

8)Align and position the pin hole of log 03-20 down into the left locating pin of log 03-21.

Slide into the groove and gently place into

03-23

position until it touches the locating tab.

03-18

 

(see Diagram 6 & 7)

Locating

Pins

 

 

03-20

 

03-20

 

Locating

Locating

 

Pin

 

Tab

Diagram 9

 

 

 

03-21

03-23

03-18

Diagram 6

 

03-22

 

03-23

03-20 03-17

03-21

03-17

Locating

Tab

Diagram 4

03-23

03-21

03-17

Diagram 7

9)Place log 03-22 over log 03-23and log 03-20. Ensure the pin hole of log 03-22 lines up with the left pin of log 03-23 as well as the left pin of log 03-20 (refer to Diagram 8).

03-22

03-23

03-20

Locating

Pins

Diagram 10

11)Placelog03-24overlog03-23andlog03-21 ensuring the pin hole of log 03-24 lines up with the right pin of log 03-23 and the right pin of log 03-21(refer to Diagram 11).

03-24

03-23

Locating

Pins

03-21

Diagram 5

Diagram 8

Diagram 11

10)Placelog03-18overlog03-23andlog03-20.

Ensurethepinholeoflog03-18linesupwiththe 12) Place log 03-19 over the left center of the

middle pin of log 03-23 and the right pin of log

grate. Ensure the log set looks like Diagram

03-20(refer to Diagram 9 & 10).

12.

 

 

 

E33 FPI Direct Vent Gas Insert

11

 

Image 11
Contents 08/16/05 E33 Gas InsertE33 FPI Direct Vent Gas Insert FPI GAS Fireplace InsertTable of Contents Safety Label Installation Minimum Fireplace Opening Excalibur Option Installation ChecklistMinimum Fireplace Opening Materials RequiredMinimum Clearances to Combustibles Venting Flue Liner InstallationGAS Connection Optional Brick Panel Pressure TestingDiagram GAS Pipe03-22 03-18 03-24 03-20 03-19 03-17 LOG InstallationFinal Installation 03-2303-24 03-23 Locating Pins 03-21 Locating PinsLocating Pins 03-20 03-23 03-20 Locating PinsBurner Orifice Removal E33 Conversion KIT from NG to LPGConversion Kit Contains Qty Shut off the gas supply Remove the louvers and fl ush doorRear View Trim Assembly Diagram Faceplate & Trim InstallationPilot Adjustment Screw Rear View Faceplate Assembly DiagramTo remove the fl ush door, reverse the above steps Flush LouversStandard Flush Door Full Screen FrontRebox and connect them to the switch Install Spring Hinges to the Left and RightSide of the bottom of the fi rebox using Order to make the following wire connecDouble Screen Door attach to left and right side of unit Accent KIT InstallationAttach door bracket to sides using 4 screws Optional Screen DoorsThermostat Wiring DiagramOptional Remote Control Optional Wall Operating Instructions Normal Operating Sounds GAS Appliances Copy of Lighting Instruction PlateMaintenance Door Glass FAN MaintenanceStraighten adjustment wire Fan Access Plate ScrewsReplacing fan Valve AssemblyRebox and from the valve access plate Install new gasket and valve assemblyMain Assembly Parts ListBurner Grate Assy Burner & LOG AssemblyValve Tray Burner Assy NG/LPFull Screen Front Installation FACEPLATES, Trims and Hearths E33 FPI Direct Vent Gas Insert E33 FPI Direct Vent Gas Insert E33 FPI Direct Vent Gas Insert E33 FPI Direct Vent Gas Insert Conditions WarrantyE33 FPI Direct Vent Gas Insert Installer Please complete the following information