Regency E33-LP, E33-NG installation manual Table of Contents

Page 3

TABLE OF CONTENTS

FPI GAS FIREPLACE INSERT

 

Page

Unit Dimensions

2

Safety Label

4

INSTALLATION REQUIREMENTS

 

For Your Safety

5

Gas Pressure Testing

5

Specifi cations

5

Installation into a Solid Fuel Burning

 

Fireplace or Factory Built Fireplace

5

General Safety Information

5

Installation Checklist

6

Materials Required

6

Minimum Fireplace Dimensions

6

Clearances to Combustibles

7

Combustible Mantel Clearances

7

INSTALLATION

 

Gas Connection

8

Venting

8

Flue Liner Installation

8

Gas Pipe Pressure Test

9

SIT Valve Description

9

Gas Insert Aeration System

9

Optional Brick Panel

9

Log Installation

10

E33 Conversion Kit from NG to LPG

12

Faceplate & Trim

13

Standard Flush Door

14

Flush Louvers

14

Full Screen Front

14

Excalibur Surround Installation

15

Optional Screen Doors

16

Accent Kit Installation

16

Double Door Option

16

Wiring Diagram

17

Optional Remote Control

17

Optional Wall Thermostat

17

Final Check

18

 

Page

OPERATING INSTRUCTIONS

 

First Fire

18

Operating Instructions

18

Lighting Procedure

18

Shutdown Procedure

18

Copy of Lighting Instruction Plate

19

Automatic Convection Fan Operation

19

Normal Operating Sounds of Gas Appliances

19

MAINTENANCE

 

Maintenance Instructions

20

General Vent Maintenance

20

Log Replacement

20

Glass Gasket

20

Steel or Gold Plated Trim

20

Door Glass

21

Flush Glass Replacement

21

Fan Maintenance

21

Valve Assembly Removal and Installation

22

REPLACEMENT PARTS LIST

 

Parts List

23

WARRANTY

 

Warranty

31

E33 FPI Direct Vent Gas Insert

3

 

Image 3
Contents 08/16/05 E33 Gas InsertE33 FPI Direct Vent Gas Insert FPI GAS Fireplace InsertTable of Contents Safety Label Installation Minimum Fireplace Opening Excalibur Option Installation ChecklistMinimum Fireplace Opening Materials RequiredMinimum Clearances to Combustibles Flue Liner Installation GAS ConnectionVenting Optional Brick Panel Pressure TestingDiagram GAS Pipe03-22 03-18 03-24 03-20 03-19 03-17 LOG InstallationFinal Installation 03-2303-24 03-23 Locating Pins 03-21 Locating PinsLocating Pins 03-20 03-23 03-20 Locating PinsBurner Orifice Removal E33 Conversion KIT from NG to LPGConversion Kit Contains Qty Shut off the gas supply Remove the louvers and fl ush doorRear View Trim Assembly Diagram Faceplate & Trim InstallationPilot Adjustment Screw Rear View Faceplate Assembly DiagramTo remove the fl ush door, reverse the above steps Flush LouversStandard Flush Door Full Screen FrontRebox and connect them to the switch Install Spring Hinges to the Left and RightSide of the bottom of the fi rebox using Order to make the following wire connecDouble Screen Door attach to left and right side of unit Accent KIT InstallationAttach door bracket to sides using 4 screws Optional Screen DoorsWiring Diagram Optional Remote Control Optional WallThermostat Operating Instructions Normal Operating Sounds GAS Appliances Copy of Lighting Instruction PlateMaintenance Door Glass FAN MaintenanceStraighten adjustment wire Fan Access Plate ScrewsReplacing fan Valve AssemblyRebox and from the valve access plate Install new gasket and valve assemblyMain Assembly Parts ListBurner Grate Assy Burner & LOG AssemblyValve Tray Burner Assy NG/LPFull Screen Front Installation FACEPLATES, Trims and Hearths E33 FPI Direct Vent Gas Insert E33 FPI Direct Vent Gas Insert E33 FPI Direct Vent Gas Insert E33 FPI Direct Vent Gas Insert Conditions WarrantyE33 FPI Direct Vent Gas Insert Installer Please complete the following information