Verona WALL HUNG GAS BOILER manual What To Do If You Smell Gas, Do not try to light any appliance

Page 1
INSTALLATION, OPERATION

INSTALLATION, OPERATION

INSTRUCTIONS

BOILER

 

 

 

Riva HEAT ONLY

WALL HUNG GAS BOILER FOR CENTRAL HEATING SUPPLY
Please Read Instructions Carefully
Save for Future Reference

WARNING: If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life.

Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance.

WHAT TO DO IF YOU SMELL GAS

Do not try to light any appliance.

Do not touch any electric switch; do not use any phone in your building.

Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions.

If you can not reach your gas supplier call the fire department.

Installation and service must be performed by a qualified installer, service agency or the gas supplier.

Manufactured by:

Distributed By:

Biasi S.p.A.

Quincy Hydronic Technologies, Inc.

Verona, Italy

80 Rochester AVE. Suite # 12

 

 

Portsmouth, NH 03801

 

Phone: 603-334-6400

 

Fax: 603-334-6401

 

RIVA HEAT ONLY MANUAL - REV A

Image 1
Contents Do not try to light any appliance WHAT TO DO IF YOU SMELL GASManufactured by Distributed ByRIVA HEAT ONLY MANUAL - REV A QHT inc Section Title Table of ContentsSection Number Page NumberSection Title Table of ContentsSection Number Page NumberWHAT TO DO IF YOU SMELL GAS DANGERDo not try to light any appliance Symptoms of CO poisoning include the following Please read this page carefully IMPORTANT INFORMATIONCodes and Regulations 1. General Information Key Features2. Technical Information M130.30CR 2.Technical Information Cont Primary Components 3. Parts ListRIVA HEAT ONLY MANUAL - REV A 4. Internal Piping & Parts ListVerify proper operation after servicing 5. Electric DiagramsWARNING Do not install the boiler on carpeting 6. Installation LocationEXTERNAL VENT SURFACES ARE HOT 7. Exhaust Pipe LocationTERMINAL CLEAR OF SNOW AND ICE 8. Mounting Bracket 9.1 Restrictor Sizing 9. VentingCoaxial 2.5/4.0 Restrictor Size9. Venting Cont Installation9.3 Choice of flue 9. Venting Cont InstallationFigure 9.4 Twin pipe φ 3.25 in 9. Venting Cont InstallationFigure 9.5 Twin Pipe Φ 3.25 in Installation 10. Pipe Connections11. Gas Pipe Connections 12. Electrical Connections/WiringWARNINGS Removing Front Panel 12. Electrical Connections/Wiring Cont12.2Connection to the electricity supply 12.4Relay Panel Connection 12.3 Room Thermostat Connection12. Electrical Connections/Wiring Cont 12.6 Finishing 12.5 Zone Valve Micro Switch Connection13.2 Expansion vessel 13.Circulator Sizing14.1 Primary - Secondary Piping 14. Piping14.2Primary - Secondary Piping with Zone Valves 14.Piping ContReturn Water 14. Piping ContTemperature Gauge15.1Initial filling of the system 15. Commissioning15.2 Lighting the boiler 15.3Checking the gas pressure at the burner 15.Commissioning ContImportant after the checks all of the test15. Commissioning Cont 15.4Adjustment of the gas pressure15.5 Checking the ignition device 15.6 Checking the burner ignition 15.7 Adjustment of the useful c.h. output15. Commissioning Cont Important after the15.Commissioning Cont 15.8Labels placement15.10Instructing the user 15.9Checking the flue system and combustionUseful output 15.Commissioning Cont16. Gas Conversion Procedures17.4Cleaning the primary heat exchanger 17. Annual Maintenance17.1 Warnings 17.2 Dismanteling the external panels17.6 Cleaning the burner 17. Annual Maintenance Cont17.7 Checking the flue 17.8 Visual inspection of applianceSystem Checkout 18. Installer Notes17962.1274.1 2906 40A4USA 1796212741