Verona WALL HUNG GAS BOILER manual 15.8Labels placement, Commissioning Cont

Page 34
15.8Labels placement:

15.Commissioning Cont.

15.8Labels placement:

4

5

3

2

1

Figure 15.10

Warning: The installation is not complete unless labels supplied are placed on the boiler as shown in Figure 15.10.

All the labels supplied with the boiler are numbered for reference.

According to Figure 15.10 place all the labels on the boiler. Use label numbered as 1 (already installed in the front panel) to begin the placement in the correct way.

RIVA HEAT ONLY MANUAL – REV A

34

Image 34
Contents Manufactured by WHAT TO DO IF YOU SMELL GASDo not try to light any appliance Distributed ByRIVA HEAT ONLY MANUAL - REV A QHT inc Section Number Table of ContentsSection Title Page NumberSection Number Table of ContentsSection Title Page NumberWHAT TO DO IF YOU SMELL GAS DANGERDo not try to light any appliance Symptoms of CO poisoning include the following Please read this page carefully IMPORTANT INFORMATIONCodes and Regulations 1. General Information Key Features2. Technical Information M130.30CR 2.Technical Information Cont 3. Parts List Primary Components4. Internal Piping & Parts List RIVA HEAT ONLY MANUAL - REV A5. Electric Diagrams Verify proper operation after servicing6. Installation Location WARNING Do not install the boiler on carpetingEXTERNAL VENT SURFACES ARE HOT 7. Exhaust Pipe LocationTERMINAL CLEAR OF SNOW AND ICE 8. Mounting Bracket Coaxial 2.5/4.0 9. Venting9.1 Restrictor Sizing Restrictor Size9. Venting Cont Installation9.3 Choice of flue 9. Venting Cont InstallationFigure 9.4 Twin pipe φ 3.25 in 9. Venting Cont InstallationFigure 9.5 Twin Pipe Φ 3.25 in 10. Pipe Connections Installation11. Gas Pipe Connections 12. Electrical Connections/WiringWARNINGS Removing Front Panel 12. Electrical Connections/Wiring Cont12.2Connection to the electricity supply 12.4Relay Panel Connection 12.3 Room Thermostat Connection12. Electrical Connections/Wiring Cont 12.5 Zone Valve Micro Switch Connection 12.6 Finishing13.Circulator Sizing 13.2 Expansion vessel14. Piping 14.1 Primary - Secondary Piping14.Piping Cont 14.2Primary - Secondary Piping with Zone ValvesTemperature 14. Piping ContReturn Water Gauge15.1Initial filling of the system 15. Commissioning15.2 Lighting the boiler Important after the 15.Commissioning Cont15.3Checking the gas pressure at the burner checks all of the test15. Commissioning Cont 15.4Adjustment of the gas pressure15.5 Checking the ignition device 15. Commissioning Cont 15.7 Adjustment of the useful c.h. output15.6 Checking the burner ignition Important after the15.8Labels placement 15.Commissioning ContUseful output 15.9Checking the flue system and combustion15.10Instructing the user 15.Commissioning ContProcedures 16. Gas Conversion17.1 Warnings 17. Annual Maintenance17.4Cleaning the primary heat exchanger 17.2 Dismanteling the external panels17.7 Checking the flue 17. Annual Maintenance Cont17.6 Cleaning the burner 17.8 Visual inspection of appliance18. Installer Notes System Checkout1796212741 17962.1274.1 2906 40A4USA