Verona WALL HUNG GAS BOILER manual Commissioning Cont, 15.3Checking the gas pressure at the burner

Page 31
15.Commissioning Cont.

15.Commissioning Cont.

15.3Checking the gas pressure at the burner:

This boiler has been tested to the highest quality control standards.

The maximum and minimum gas pressures are already set during this quality control process however the checking procedure must be followed to ensure maximum operating efficiency from the boiler.

Remove the front

 

fitted (e.g. room

removing the electrical

 

 

panel of the case.

 

thermostat) ensure

connector E (Figure

Loosen the internal

 

they "call for heat".

15.4).

 

 

screw 15 (Figure

Switch on the boiler.

• Switch on the boiler.

 

 

15.4) on the Outlet

Check the maximum

• Check the minimum

 

 

Pressure Test Point

 

gas pressure and

gas pressure and

 

 

of the Gas Valve and

 

compare the value on

compare the value on

 

 

connect a pressure

 

the gauge with the

the gauge with the

 

 

gauge using a

 

value indicated in the

value indicated in the

 

 

suitable hose.

 

Section 2 on page 10

Section 2 on page 10

 

 

 

 

 

 

 

 

(gas pressures at the

(gas pressures at the

 

 

 

 

 

 

 

 

burner).

burner).

 

 

15

 

 

 

 

 

 

 

 

 

 

 

Check the maximum

• Switch off the boiler

 

 

 

 

 

 

 

 

 

16

 

 

E

 

 

gas flow at the gas

and re-connect the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

meter and compare

electrical connector E

 

 

 

 

 

 

 

 

the value indicated in

to the modulator coil.

 

 

 

 

 

 

 

 

the section 2 on page

• Switch on the boiler.

 

 

 

 

 

 

 

 

10 (gas flow rate).

• Check that the boiler

 

 

 

Figure 15.4

• Switch off the boiler.

lights up uniformly.

 

 

 

Disconnect the gas

• Switch off the boiler,

Set the

c.h.

 

modulator coil by

turn off the hot water

 

 

temperature control

 

 

taps and disconnect

 

 

knob to its maximum

 

 

the pressure gauge.

 

 

position. If external

 

 

Important: after the

 

 

controls are

 

 

checks all of the test

points must be sealed.

RIVA HEAT ONLY MANUAL - REV A

31

Image 31
Contents Distributed By WHAT TO DO IF YOU SMELL GASDo not try to light any appliance Manufactured byRIVA HEAT ONLY MANUAL - REV A QHT inc Page Number Table of ContentsSection Title Section NumberPage Number Table of ContentsSection Title Section NumberWHAT TO DO IF YOU SMELL GAS DANGERDo not try to light any appliance Symptoms of CO poisoning include the following Please read this page carefully IMPORTANT INFORMATIONCodes and Regulations 1. General Information Key Features2. Technical Information M130.30CR 2.Technical Information Cont Primary Components 3. Parts ListRIVA HEAT ONLY MANUAL - REV A 4. Internal Piping & Parts ListVerify proper operation after servicing 5. Electric DiagramsWARNING Do not install the boiler on carpeting 6. Installation LocationEXTERNAL VENT SURFACES ARE HOT 7. Exhaust Pipe LocationTERMINAL CLEAR OF SNOW AND ICE 8. Mounting Bracket Restrictor Size 9. Venting9.1 Restrictor Sizing Coaxial 2.5/4.09. Venting Cont Installation9.3 Choice of flue 9. Venting Cont InstallationFigure 9.4 Twin pipe φ 3.25 in 9. Venting Cont InstallationFigure 9.5 Twin Pipe Φ 3.25 in Installation 10. Pipe Connections11. Gas Pipe Connections 12. Electrical Connections/WiringWARNINGS Removing Front Panel 12. Electrical Connections/Wiring Cont12.2Connection to the electricity supply 12.4Relay Panel Connection 12.3 Room Thermostat Connection12. Electrical Connections/Wiring Cont 12.6 Finishing 12.5 Zone Valve Micro Switch Connection13.2 Expansion vessel 13.Circulator Sizing14.1 Primary - Secondary Piping 14. Piping14.2Primary - Secondary Piping with Zone Valves 14.Piping ContGauge 14. Piping ContReturn Water Temperature15.1Initial filling of the system 15. Commissioning15.2 Lighting the boiler checks all of the test 15.Commissioning Cont15.3Checking the gas pressure at the burner Important after the15. Commissioning Cont 15.4Adjustment of the gas pressure15.5 Checking the ignition device Important after the 15.7 Adjustment of the useful c.h. output15.6 Checking the burner ignition 15. Commissioning Cont15.Commissioning Cont 15.8Labels placement15.Commissioning Cont 15.9Checking the flue system and combustion15.10Instructing the user Useful output16. Gas Conversion Procedures17.2 Dismanteling the external panels 17. Annual Maintenance17.4Cleaning the primary heat exchanger 17.1 Warnings17.8 Visual inspection of appliance 17. Annual Maintenance Cont17.6 Cleaning the burner 17.7 Checking the flueSystem Checkout 18. Installer Notes17962.1274.1 2906 40A4USA 1796212741