Verona WALL HUNG GAS BOILER manual Room Thermostat Connection, 12.4Relay Panel Connection

Page 24
12.3 Room Thermostat Connection:
Power supply terminal block

 

 

 

 

 

12.3 Room Thermostat Connection:

 

 

 

 

The room thermostat

Any external controls

 

 

 

 

 

must be connected to

 

and connection lines

 

T

Room thermostat

 

the terminal block

 

 

must be rated at 120

 

 

(120V rating)

 

 

 

 

 

 

 

 

situated next to the

 

VAC but under no

 

 

 

 

 

control panel

 

 

circumstances should

 

 

 

 

 

 

 

 

L

N

 

external live voltage

 

 

L

N

 

To fused spur

 

be connected to the

 

 

 

 

 

 

 

 

 

isolation switch

 

 

 

 

 

 

 

 

 

 

 

 

Power supply

 

room thermostat link

3

2

1

Power supply

 

 

 

 

 

terminal block

 

on the boiler

 

 

 

terminal block

 

 

 

 

 

 

 

 

 

 

External controls

 

 

 

 

 

 

When connecting any

 

 

 

J

3

2

1

 

 

 

 

 

terminal block

 

 

 

 

 

 

 

 

 

type of external

 

 

Figure 12.7

 

 

 

 

 

 

 

 

 

 

 

 

 

External controls

 

control, the jumper J

Connect the room

 

 

 

 

terminal block

 

in Fig. 12.6 must be

 

 

 

 

 

 

 

 

thermostat between

 

 

 

 

 

 

 

removed.

 

terminals 1 and 3 as

 

120 VAC Control

 

The room thermostat

 

shown in Fig. 12.7.

 

Terminal Block

 

 

 

must be connected to

 

 

 

 

 

 

Figure 12.6

 

 

the “Control Terminal

 

 

 

 

 

 

 

 

 

 

 

Block” (Fig 12.7).

 

 

 

 

The relay control must be connected to the terminal block situated next to the control panel

To fused spur

L

N

isolation switch

 

 

J 3 2 1

External controls terminal block

120 VAC Control

Terminal Block

12.4Relay Panel Connection:

• When connecting any

type of relay control, the jumper J in Fig.

12.8 must be removed.

Connect the dry contact switch of the relay panel to the 120 VAC control terminal block (Fig 12.9).

TGeneric Relay Control

(120V rating)

L 12.4Relay Panel Connection: N

3

2

1

Power supply

terminal block

 

 

 

External controls terminal block

Figure 12.9

Connect the dry contact switch to terminals 1 and 3 shown in Fig. 12.9.

Figure 12.8

12. Electrical Connections/Wiring Cont.

RIVA HEAT ONLY MANUAL - REV A24

Image 24
Contents WHAT TO DO IF YOU SMELL GAS Do not try to light any applianceManufactured by Distributed ByRIVA HEAT ONLY MANUAL - REV A QHT inc Table of Contents Section TitleSection Number Page NumberTable of Contents Section TitleSection Number Page NumberDANGER WHAT TO DO IF YOU SMELL GASDo not try to light any appliance Symptoms of CO poisoning include the following IMPORTANT INFORMATION Please read this page carefullyCodes and Regulations Key Features 1. General Information2. Technical Information M130.30CR 2.Technical Information Cont 3. Parts List Primary Components4. Internal Piping & Parts List RIVA HEAT ONLY MANUAL - REV A5. Electric Diagrams Verify proper operation after servicing6. Installation Location WARNING Do not install the boiler on carpeting7. Exhaust Pipe Location EXTERNAL VENT SURFACES ARE HOTTERMINAL CLEAR OF SNOW AND ICE 8. Mounting Bracket 9. Venting 9.1 Restrictor SizingCoaxial 2.5/4.0 Restrictor SizeInstallation 9. Venting Cont9.3 Choice of flue Installation 9. Venting ContFigure 9.4 Twin pipe φ 3.25 in Installation 9. Venting ContFigure 9.5 Twin Pipe Φ 3.25 in 10. Pipe Connections Installation12. Electrical Connections/Wiring 11. Gas Pipe ConnectionsWARNINGS 12. Electrical Connections/Wiring Cont Removing Front Panel12.2Connection to the electricity supply 12.3 Room Thermostat Connection 12.4Relay Panel Connection12. Electrical Connections/Wiring Cont 12.5 Zone Valve Micro Switch Connection 12.6 Finishing13.Circulator Sizing 13.2 Expansion vessel14. Piping 14.1 Primary - Secondary Piping14.Piping Cont 14.2Primary - Secondary Piping with Zone Valves14. Piping Cont Return WaterTemperature Gauge15. Commissioning 15.1Initial filling of the system15.2 Lighting the boiler 15.Commissioning Cont 15.3Checking the gas pressure at the burnerImportant after the checks all of the test15.4Adjustment of the gas pressure 15. Commissioning Cont15.5 Checking the ignition device 15.7 Adjustment of the useful c.h. output 15.6 Checking the burner ignition15. Commissioning Cont Important after the15.8Labels placement 15.Commissioning Cont15.9Checking the flue system and combustion 15.10Instructing the userUseful output 15.Commissioning ContProcedures 16. Gas Conversion17. Annual Maintenance 17.4Cleaning the primary heat exchanger17.1 Warnings 17.2 Dismanteling the external panels17. Annual Maintenance Cont 17.6 Cleaning the burner17.7 Checking the flue 17.8 Visual inspection of appliance18. Installer Notes System Checkout1796212741 17962.1274.1 2906 40A4USA