Verona WALL HUNG GAS BOILER manual Parts List, Primary Components

Page 11
3. Parts List

3. Parts List

Primary Components:

12Primary Components:

11Manual background

 

 

9

 

10

 

 

 

 

 

 

8

 

 

 

 

7

 

19

 

 

6

 

 

 

 

 

 

 

5

 

3

 

 

 

 

 

 

15

 

 

 

 

4

 

14

 

 

 

 

 

 

16

 

1

 

 

 

 

 

 

18

 

2

 

 

 

 

 

 

 

 

13

 

 

20

 

26

 

 

 

 

1

Pump

17

Central heating expansion vessel

2

Pump vent plug

18

Central heating temp. Probe NTC

3

Automatic air purger valve

19

Central heating pressure relief valve

4

Modulation gas valve

20

Primary circuit flow switch

5

Flame-detecting electrode

21

Main circuit drain cock

6

Ignition electrodes

22

By-pass valve

7

Burner

23

Venturi device

8

Combustion chamber

24

Flue outlet pipe

9

Primary heat exchanger

25

Air Intake Pipe

10

Fan

26

Control panel

11

Air pressure switch

27

Safety thermostat probe

12

Air switch pres. Test points

28

Pressure reducing automatic fill valve

13

Safety thermostat

29

Backflow preventer

14

Modulation operator

30

Gas supply line cock

15

Gas valve outlet pres. Test point

31

Water supply inlet cock

16

Gas valve inlet pres. Test point

 

 

RIVA HEAT ONLY MANUAL - REV A

11

Image 11
Contents Distributed By WHAT TO DO IF YOU SMELL GASDo not try to light any appliance Manufactured byRIVA HEAT ONLY MANUAL - REV A QHT inc Page Number Table of ContentsSection Title Section NumberPage Number Table of ContentsSection Title Section NumberDo not try to light any appliance DANGERWHAT TO DO IF YOU SMELL GAS Symptoms of CO poisoning include the following Codes and Regulations IMPORTANT INFORMATIONPlease read this page carefully 2. Technical Information M130.30CR Key Features1. General Information 2.Technical Information Cont Primary Components 3. Parts ListRIVA HEAT ONLY MANUAL - REV A 4. Internal Piping & Parts ListVerify proper operation after servicing 5. Electric DiagramsWARNING Do not install the boiler on carpeting 6. Installation LocationTERMINAL CLEAR OF SNOW AND ICE 7. Exhaust Pipe LocationEXTERNAL VENT SURFACES ARE HOT 8. Mounting Bracket Restrictor Size 9. Venting9.1 Restrictor Sizing Coaxial 2.5/4.09.3 Choice of flue Installation9. Venting Cont Figure 9.4 Twin pipe φ 3.25 in Installation9. Venting Cont Figure 9.5 Twin Pipe Φ 3.25 in Installation9. Venting Cont Installation 10. Pipe ConnectionsWARNINGS 12. Electrical Connections/Wiring11. Gas Pipe Connections 12.2Connection to the electricity supply 12. Electrical Connections/Wiring ContRemoving Front Panel 12. Electrical Connections/Wiring Cont 12.3 Room Thermostat Connection12.4Relay Panel Connection 12.6 Finishing 12.5 Zone Valve Micro Switch Connection13.2 Expansion vessel 13.Circulator Sizing14.1 Primary - Secondary Piping 14. Piping14.2Primary - Secondary Piping with Zone Valves 14.Piping ContGauge 14. Piping ContReturn Water Temperature15.2 Lighting the boiler 15. Commissioning15.1Initial filling of the system checks all of the test 15.Commissioning Cont15.3Checking the gas pressure at the burner Important after the15.5 Checking the ignition device 15.4Adjustment of the gas pressure15. Commissioning Cont Important after the 15.7 Adjustment of the useful c.h. output15.6 Checking the burner ignition 15. Commissioning Cont15.Commissioning Cont 15.8Labels placement15.Commissioning Cont 15.9Checking the flue system and combustion15.10Instructing the user Useful output16. Gas Conversion Procedures17.2 Dismanteling the external panels 17. Annual Maintenance17.4Cleaning the primary heat exchanger 17.1 Warnings17.8 Visual inspection of appliance 17. Annual Maintenance Cont17.6 Cleaning the burner 17.7 Checking the flueSystem Checkout 18. Installer Notes17962.1274.1 2906 40A4USA 1796212741