15. Commissioning Cont.
D
D
D
Figure 15.8
15.6 Checking the burner ignition: |
|
| ||
• Watch the gauge and |
| + | ||
| RISC | |||
| check to see if the |
| + | |
| ignition pressure |
| ACC | |
|
|
| ||
| registerd corresponds |
| ON | |
| to the values given in |
| 1 2 3 4 | |
| the Technical Data. |
|
| |
| Turn off the boiler and |
| OFF | |
|
|
| ||
| reignite it by turning |
| Figure 15.9 | |
| • | Adjust the gas | ||
| the function selector | |||
|
| pressure at the | ||
| B to the 0 position |
| ||
|
| injectors to the value | ||
| and then back to that |
| ||
|
| indicated in the tables | ||
| indicated in figure |
| ||
|
| of section 2. By | ||
| 15.7. |
| ||
|
| rotating the device | ||
• | Repeat this process |
| ||
| clockwise the | |||
| two to three times |
| ||
|
| pressure increases. | ||
| leaving 30 second |
| ||
| • | After the adjustment | ||
| intervals between | |||
|
| operations bring the | ||
| each ignition. Check |
| ||
|
| selector 3 of figure | ||
| the ignition pressures |
| ||
|
| 15.9 back to the | ||
| and visually check |
| ||
|
| normal position (ON). | ||
| that the burner lights |
| ||
| • | Reassemble the | ||
| uniformly and in a | |||
|
| service panel. | ||
| controlled manner. |
| ||
| • Close the gas valve | |||
• To carry out the | ||||
| outlet pressure test | |||
| adjustment move the |
| ||
|
| point 15 (figure 15.5). | ||
| function selector 3 to |
| ||
| • | Reassemble the front | ||
| the OFF position (Fig. | |||
|
| pannel of the case. | ||
| 15.9) and use the |
| ||
| Important: after the | |||
| device (ACC). | |||
| checks all of the test | |||
|
| |||
|
| points must be sealed. | ||
15.7 Adjustment of the useful c.h. output: |
| |||
| thermostat is set to | • | Adjust the gas | |
| “heat demand”. |
| pressure at the burner | |
• Loosen screws D and |
| to the value according | ||
| remove the service |
| to the useful c.h. | |
| panel (figure 15.8). |
| output wanted (Tab. | |
• To carry out the |
| 15.1). | ||
| adjustment use the | • | Reassemble the | |
| adjustment device |
| service panel. | |
| (RISC) with the help | • | Close the gas valve | |
| of a screwdriver. |
| outlet pressure test | |
• By rotating the device |
| point 15 (figure 15.5). | ||
| clockwise the | • | Reassemble the front | |
| pressure increases. |
| pannel of the case. |
RIVA HEAT ONLY MANUAL – REV A | 33 |