Verona
WALL HUNG GAS BOILER
manual
Gas Conversion, Procedures
Install
Parts list
Electric Diagrams
Maintenance
Procedures
Cleaning the burner
15.8Labels placement
Key Features
Page 36
Page 35
Page 37
Image 36
Page 35
Page 37
Contents
WHAT TO DO IF YOU SMELL GAS
Do not try to light any appliance
Manufactured by
Distributed By
RIVA HEAT ONLY MANUAL - REV A
QHT inc
Table of Contents
Section Title
Section Number
Page Number
Table of Contents
Section Title
Section Number
Page Number
DANGER
WHAT TO DO IF YOU SMELL GAS
Do not try to light any appliance
Symptoms of CO poisoning include the following
IMPORTANT INFORMATION
Please read this page carefully
Codes and Regulations
Key Features
1. General Information
2. Technical Information M130.30CR
2.Technical Information Cont
3. Parts List
Primary Components
4. Internal Piping & Parts List
RIVA HEAT ONLY MANUAL - REV A
5. Electric Diagrams
Verify proper operation after servicing
6. Installation Location
WARNING Do not install the boiler on carpeting
7. Exhaust Pipe Location
EXTERNAL VENT SURFACES ARE HOT
TERMINAL CLEAR OF SNOW AND ICE
8. Mounting Bracket
9. Venting
9.1 Restrictor Sizing
Coaxial 2.5/4.0
Restrictor Size
Installation
9. Venting Cont
9.3 Choice of flue
Installation
9. Venting Cont
Figure 9.4 Twin pipe φ 3.25 in
Installation
9. Venting Cont
Figure 9.5 Twin Pipe Φ 3.25 in
10. Pipe Connections
Installation
12. Electrical Connections/Wiring
11. Gas Pipe Connections
WARNINGS
12. Electrical Connections/Wiring Cont
Removing Front Panel
12.2Connection to the electricity supply
12.3 Room Thermostat Connection
12.4Relay Panel Connection
12. Electrical Connections/Wiring Cont
12.5 Zone Valve Micro Switch Connection
12.6 Finishing
13.Circulator Sizing
13.2 Expansion vessel
14. Piping
14.1 Primary - Secondary Piping
14.Piping Cont
14.2Primary - Secondary Piping with Zone Valves
14. Piping Cont
Return Water
Temperature
Gauge
15. Commissioning
15.1Initial filling of the system
15.2 Lighting the boiler
15.Commissioning Cont
15.3Checking the gas pressure at the burner
Important after the
checks all of the test
15.4Adjustment of the gas pressure
15. Commissioning Cont
15.5 Checking the ignition device
15.7 Adjustment of the useful c.h. output
15.6 Checking the burner ignition
15. Commissioning Cont
Important after the
15.8Labels placement
15.Commissioning Cont
15.9Checking the flue system and combustion
15.10Instructing the user
Useful output
15.Commissioning Cont
Procedures
16. Gas Conversion
17. Annual Maintenance
17.4Cleaning the primary heat exchanger
17.1 Warnings
17.2 Dismanteling the external panels
17. Annual Maintenance Cont
17.6 Cleaning the burner
17.7 Checking the flue
17.8 Visual inspection of appliance
18. Installer Notes
System Checkout
1796212741
17962.1274.1 2906 40A4USA
Related pages
All Procedure page
RDL Test Procedure for Patton electronic 2510RC
Procedure for Trane CAB-PRC001-EN
Special Procedures for Philips V200
Procedure For Measuring Fan Suction Pressure for PB Heat DE
Procedure 1 Telephone line connection check for Toshiba PROL450D
Calibration Procedure Controller SET-UP for Sentry Industries 5000
Locking and tagging procedure for Electrolux WS4350H
Setting Amount Procedure for Whirlpool MT6900XW
Procedure for Zanussi ZM176ST
Repeat the same procedure to store other sound modes for JVC KD-S50
How can the
glda696mss manual
help me improve welding performance?
Top
Page
Image
Contents