Nortec Industries Airfog Series installation manual Multi Zone Layout

Page 17

Figure 2. Multi Zone Layout

10-10

Page 10 2008-04-11

Image 17
Contents Airfog SeriesTM Proprietary Notice Liability Notice Table of Contents SHUT-DOWN Procedure List of Figures List of Tables This page Intentionally Left Blank Introduction Introduction General Airfog Technical Considerations Older Nortec Airfog System Components 10-00 This page Intentionally Left Blank Installation Nozzle System Layout InstallationTypical Nozzle Layout for Wall Mounted System Multi Zone Layout Introduction CleaningSupply Feed Lines Mounting of NozzlesWater and Air Line Pressure Control Saddle Clamp Installation Connecting NozzlesPilot Operated AIR Regulator Vacuum Valve10-10 Vacuum Valve Operation Primary AIR Pressure Control Electrical WiringPrimary Water Pressure Control Control PanelPrimary Air Pressure Control Section Pilot Lines Schematic Plumbing LayoutThis page Intentionally Left Blank Mini & Octo Installation AFE Mini Systems AFE Self Contained Airfog SystemsMini Installations AFE Octo Systems Installation ProcedureOcto Layout with Interfaces 10-20 Ceiling Mounting of Octo Four Octo Units with a Single Control Panel START-UP Procedure Water Supply Compressed AIR SupplySelf Cleaning Cycle Adjustment Setting the System for Normal Operation Capacity Output vs. Vacuum Valve Adjustment This page Intentionally Left Blank 10-40 SHUT-DOWN ProcedureAFE, MINI, and Octo Shut Down Procedures 10-50 MaintenanceMaintenance Unscheduled Maintenance 10-50 10-60 TroubleshootingTroubleshooting 10-60 This page Intentionally Left Blank 10-70 Spare PartsSpare Parts Octo Exploded View Octo This page Intentionally Left Blank Item # Description QTY Vacuum Valve Exploded View Item # Description Octo Mini Standard Control Panel Exploded View AFE This page Intentionally Left Blank Warranty Authorized Agent