Nortec Industries Airfog Series AFE Self Contained Airfog Systems, AFE Mini Systems

Page 29

1.AFE SELF CONTAINED AIRFOG SYSTEMS

A.AFE MINI SYSTEMS

(1)AFE MINI systems are self-contained packaged systems that include all necessary components.

(2)They require the following connections:

(a)3/8” O.D. plastic or soft copper water supply line rated at a minimum of 25 psig.

(b)1/4” O.D. plastic or soft copper air supply line rated at a minimum of 90 psig

(c)Isolation valves for both air and water lines

(d)Mounting hardware

(e)Support anchors

(f)1/4” lag bolts

(g)120 VAC standard electrical receptacle

(h)Humidity control device (Humidistat)

(3)The best location for a MINI is on a wall or column with the mist discharging down an aisle where it will not condense on solid surfaces. A clear run of at least 15 feet forward of the nozzles is normally a sufficient distance for complete absorption.

Adiabatic cooling may be uncomfortable to people occupying workstations directly beneath the Mini systems.

(4)The Mini nozzles must be a minimum of 6 feet above the floor and 36” below the ceiling in order to prevent condensation on these surfaces. See Figure 1 Mini Installation.

(5)Four accessible internal mounting holes are located in each corner of the rear panel. The mounting procedure is:

(a)Either attach the supplied mounting bracket hardware or bolt panel directly onto the wall surface via the mounting holes.

(b)Place the panel level against the surface and mark the drill holes.

(c)Remove the panel and drill the holes (hole size to match field supplied lag bolts and anchors).

(d)Replace the panel and secure using bolts.

(6)Install water and air supply lines. Both water and air lines should have an isolation valve installed near the unit. Water connection at the unit is designed for 3/8” plastic tubing but if soft copper pipe is to be used, replace the plastic sleeve in the fitting with the supplied brass sleeve. The air connection is designed for 1/4” plastic tubing. Figure 2 Plumbing End Connections illustrates details of the interfaces.

10-20

Page 22 2008-04-11

Image 29
Contents Airfog SeriesTM Proprietary Notice Liability Notice Table of Contents SHUT-DOWN Procedure List of Figures List of Tables This page Intentionally Left Blank Introduction Introduction General Airfog Technical Considerations Older Nortec Airfog System Components 10-00 This page Intentionally Left Blank Installation Nozzle System Layout InstallationTypical Nozzle Layout for Wall Mounted System Multi Zone Layout Introduction CleaningSupply Feed Lines Mounting of NozzlesWater and Air Line Pressure Control Saddle Clamp Installation Connecting NozzlesPilot Operated AIR Regulator Vacuum Valve10-10 Vacuum Valve Operation Primary AIR Pressure Control Electrical WiringPrimary Water Pressure Control Control PanelPrimary Air Pressure Control Section Pilot Lines Schematic Plumbing LayoutThis page Intentionally Left Blank Mini & Octo Installation AFE Mini Systems AFE Self Contained Airfog SystemsMini Installations AFE Octo Systems Installation ProcedureOcto Layout with Interfaces 10-20 Ceiling Mounting of Octo Four Octo Units with a Single Control Panel START-UP Procedure Water Supply Compressed AIR SupplySelf Cleaning Cycle Adjustment Setting the System for Normal Operation Capacity Output vs. Vacuum Valve Adjustment This page Intentionally Left Blank 10-40 SHUT-DOWN ProcedureAFE, MINI, and Octo Shut Down Procedures 10-50 MaintenanceMaintenance Unscheduled Maintenance 10-50 10-60 TroubleshootingTroubleshooting 10-60 This page Intentionally Left Blank 10-70 Spare PartsSpare Parts Octo Exploded View Octo This page Intentionally Left Blank Item # Description QTY Vacuum Valve Exploded View Item # Description Octo Mini Standard Control Panel Exploded View AFE This page Intentionally Left Blank Warranty Authorized Agent