Nortec Industries Airfog Series installation manual Afe

Page 61

Table 5. Control Panel Spare Parts

ITEM #

PART #

DESCRIPTION

 

QTY

 

 

 

MINI I/II

 

AFE

 

 

 

 

 

 

 

 

 

 

1

1600027

Valve 4-way 24 Vac Solenoid

0

 

1

 

 

 

 

 

 

 

 

2

1603081

Pressure Switch, Screw-on (Modulating Contol

0

 

1

Panel Only)

 

 

 

 

 

 

 

 

 

 

 

 

3

1506260

E/P Converter Module (Modulating Control

0

 

1

Panel Only)

 

 

 

 

 

 

 

 

 

 

 

 

4

1603050

Repeat Cycle Timer

1

 

1

 

 

 

 

 

 

5

1603200

Pressure Gauge Panel MTG Bars

1

 

1

 

 

 

 

 

 

6

1493096

Lamp Green Indicator

1

 

1

 

 

 

 

 

 

7

1453001

Switch On/Off

1

 

1

 

 

 

 

 

 

8

1603023

Lamp Amber Indicator

1

 

1

 

 

 

 

 

 

9

1603064

Valve 3-way 24 Vac Solenoid Replacement Kit

0

 

1

 

 

 

 

 

 

10

1603001

Air Regulator Panel Mount

1

 

1

 

 

 

 

 

1603118

Repair Kit for 1603001 Air Regulator

 

 

 

 

 

 

 

 

 

 

 

 

 

11

1853104

Lock c/w 2 keys

1

 

1

 

 

 

 

 

 

* Italics denote replacement for complete part, repair kits exist for these parts.

10-70

Page 54 2008-04-11

Image 61
Contents Airfog SeriesTM Proprietary Notice Liability Notice Table of Contents SHUT-DOWN Procedure List of Figures List of Tables This page Intentionally Left Blank Introduction Introduction General Airfog Technical Considerations Older Nortec Airfog System Components 10-00 This page Intentionally Left Blank Installation Nozzle System Layout InstallationTypical Nozzle Layout for Wall Mounted System Multi Zone Layout Introduction CleaningSupply Feed Lines Mounting of NozzlesWater and Air Line Pressure Control Saddle Clamp Installation Connecting NozzlesPilot Operated AIR Regulator Vacuum Valve10-10 Vacuum Valve Operation Primary AIR Pressure Control Electrical WiringPrimary Water Pressure Control Control PanelPrimary Air Pressure Control Section Pilot Lines Schematic Plumbing LayoutThis page Intentionally Left Blank Mini & Octo Installation AFE Mini Systems AFE Self Contained Airfog SystemsMini Installations AFE Octo Systems Installation ProcedureOcto Layout with Interfaces 10-20 Ceiling Mounting of Octo Four Octo Units with a Single Control Panel START-UP Procedure Water Supply Compressed AIR SupplySelf Cleaning Cycle Adjustment Setting the System for Normal Operation Capacity Output vs. Vacuum Valve Adjustment This page Intentionally Left Blank 10-40 SHUT-DOWN ProcedureAFE, MINI, and Octo Shut Down Procedures 10-50 MaintenanceMaintenance Unscheduled Maintenance 10-50 10-60 TroubleshootingTroubleshooting 10-60 This page Intentionally Left Blank 10-70 Spare PartsSpare Parts Octo Exploded View Octo This page Intentionally Left Blank Item # Description QTY Vacuum Valve Exploded View Item # Description Octo Mini Standard Control Panel Exploded View AFE This page Intentionally Left Blank Warranty Authorized Agent