Nortec Industries
Airfog Series
installation manual
START-UP Procedure
Troubleshooting
Install
Schematic Plumbing Layout
Connecting Nozzles
Warranty
Maintenance
SHUT-DOWN Procedure
Self Cleaning Cycle Adjustment
Cleaning
Page 36
10-30
START-UP
PROCEDURE
10-30
Page 29
2008-04-11
Page 35
Page 37
Image 36
Page 35
Page 37
Contents
Airfog SeriesTM
Proprietary Notice Liability Notice
Table of Contents
SHUT-DOWN Procedure
List of Figures
List of Tables
This page Intentionally Left Blank
Introduction
Introduction
General Airfog Technical Considerations
Older Nortec Airfog System Components
10-00
This page Intentionally Left Blank
Installation
Installation
Nozzle System Layout
Typical Nozzle Layout for Wall Mounted System
Multi Zone Layout
Cleaning
Introduction
Supply Feed Lines
Mounting of Nozzles
Water and Air Line Pressure Control
Connecting Nozzles
Saddle Clamp Installation
Vacuum Valve
Pilot Operated AIR Regulator
10-10
Vacuum Valve Operation
Electrical Wiring
Primary AIR Pressure Control
Primary Water Pressure Control
Control Panel
Primary Air Pressure Control Section
Schematic Plumbing Layout
Pilot Lines
This page Intentionally Left Blank
Mini & Octo Installation
AFE Self Contained Airfog Systems
AFE Mini Systems
Mini Installations
Installation Procedure
AFE Octo Systems
Octo Layout with Interfaces
10-20
Ceiling Mounting of Octo
Four Octo Units with a Single Control Panel
START-UP Procedure
Compressed AIR Supply
Water Supply
Self Cleaning Cycle Adjustment
Setting the System for Normal Operation
Capacity Output vs. Vacuum Valve Adjustment
This page Intentionally Left Blank
SHUT-DOWN Procedure
10-40
AFE, MINI, and Octo Shut Down Procedures
Maintenance
10-50
Maintenance
Unscheduled Maintenance
10-50
Troubleshooting
10-60
Troubleshooting
10-60
This page Intentionally Left Blank
Spare Parts
10-70
Spare Parts
Octo Exploded View
Octo
This page Intentionally Left Blank
Item # Description QTY
Vacuum Valve Exploded View
Item # Description Octo Mini Standard
Control Panel Exploded View
AFE
This page Intentionally Left Blank
Warranty
Authorized Agent
Related pages
All Procedure page
Event Log Procedures for Honeywell VISTA-32FB
Pressure Display Perform Pressure Relief Procedure, for Graco 395/490/495/595
Replace the handset to finish the procedure for Aastra Telecom 4225
EPO Emergency Power Off Procedure for Mitsubishi Electronics 2033C
Procedure 2 Connector Check and Cable Check for Toshiba TECRA R10
Re-perform the set-up procedures for JVC SR-VS10U
Procedure for RCA 516
RuncoCare Claim Procedure for Runco VX-3000D
Pressure Relief Procedure for Graco Inc 260101
Quick Motor Test Procedure for Carrier 58MVP
What is the optimal placement for the
Amcor Air Purifier
?
Top
Page
Image
Contents